Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Make Sure Jobs That Need the Water Company Notified Are Caught Before Work Starts?
Problems We Solve

How Do We Make Sure Jobs That Need the Water Company Notified Are Caught Before Work Starts?

Plumbers can miss jobs that need advance water company notice under the fittings rules. We build a check at quote stage that flags them for your team.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Some plumbing work needs the water company told before it starts, and whether a job qualifies is decided by whoever quotes it, often without a clear record. We build a check at quote and booking that asks questions your lead plumber sets, flags jobs that may need notice or self-certification, tracks the notice and any consent, and files the paperwork with the job.

The pump, the pond and the big bath

A customer wants a pumped shower, a large bath and an outside tap for the garden pond. Your plumber knows some types of installation need notice to the water company before work starts, unless your firm is covered by an approved contractor scheme for that work. Whether this job needs it depends on the details, and those details are in the plumber's head, not in the quote.

The job gets booked for next Tuesday. Nobody checks. It's only when the customer's neighbour asks that someone wonders.

It is not that the team does not know the rules. It is that nothing prompts anyone to apply them at the right moment.

Why the step is easy to miss

Most plumbing jobs don't need notice, so the step isn't part of the normal flow. The trigger depends on the type of installation and your firm's status, which the quoter knows in general but has to think about for each job. Nothing in the quote or booking asks the question.

MomentWhat usually happens
EnquiryDetails of fittings not captured
QuoteNotice not considered
BookingDate set without allowing for notice
CompletionSelf-certification, if applicable, not filed

Which work needs notice, and what your scheme membership covers, is for your lead plumber and the rules themselves. We only build the check.

Newer staff are most at risk. An experienced plumber may recognise a job that needs notice at a glance. A newer estimator or office person taking the enquiry may not, and the job can be booked before anyone with the right knowledge sees it.

What a missed notice costs

Starting work that needed notice without giving it is a problem with the water company. Jobs may have to be delayed if notice is caught late. And missing self-certification paperwork causes trouble when the customer sells or the water company asks.

It also affects customer confidence. Telling a customer their job has to wait because a notice was not given on time looks disorganised, even if the delay is short.

The notice check we build

  1. Question set: your lead plumber writes short questions about the installation types that matter, asked at quote stage.
  2. Flag: jobs that match are flagged as needing a notice decision, with the reason shown.
  3. Booking guard: flagged jobs can't be booked until the notice decision is recorded, so the lead time is allowed for.
  4. Notice record: where notice is given, the date, method and any water company response are recorded against the job.
  5. Completion paperwork: where your scheme membership means self-certification, the certificate is produced and filed, and a copy sent to the customer.
  6. Review: the lead plumber can see all flagged jobs and their status.

The questions can be updated by your lead plumber whenever your scheme status or the rules change, and every future quote uses the new version.

Caught at the right moment

The question is asked every time, at the stage where it matters. Bookings allow for notice. Paperwork is filed with the job. And your lead plumber sees every relevant job without needing to review every quote.

It also creates a useful record. If the water company or a future buyer ever asks about an installation, you can show when notice was given or why it was not needed, based on the answers recorded at the time.

Could this be a gap for you?

  • Nobody routinely asks whether a job needs water company notice.
  • Jobs have been booked without time for notice.
  • Self-certification paperwork isn't filed with jobs.
  • Only your most experienced plumber knows the rules well.
  • You couldn't list last year's notifiable jobs.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will you tell us which jobs need notice?

No. Your lead plumber sets the questions based on the rules and your scheme status. We build the check.

Can it send the notice to the water company?

Where the water company offers an online form or email route, we prepare the details. Submission stays with your team unless an upload route exists.

Does this slow quoting down?

It adds a few questions for relevant job types only.

Does it work with our job software?

We add the questions and flags to software with an API, or run them alongside.

Keep reading

More on Problems We Solve

Start here

Tell us which part of your plumbing and heating business you would fix first

Describe how the work runs now, the software involved and who carries the load. We will tell you what we would build and what stays with your engineers and advisers. If a setting in software you already use would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →