Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Can We See Our Depot's Network Performance Figures Before the Network Sends the Scorecard?
Problems We Solve

How Can We See Our Depot's Network Performance Figures Before the Network Sends the Scorecard?

Pallet network depots see scan, service and claims figures only when the network scorecard arrives. We build a daily view of the same measures from your data.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Networks judge member depots on measures such as scan compliance, on-time delivery, failed collections and claims. The scorecard arrives after the period ends, when it is too late to act. We build a daily view of the same measures from your own scans, runs and records, so you spot a slipping figure in the week it starts slipping.

The scorecard that always arrives too late

The network's monthly or weekly figures land in your inbox. Scan compliance is down. On-time delivery for premium services dipped in the second week. There were more claims than usual. Your depot has dropped a few places on the member table, and the regional manager wants a call.

You look back and try to remember what happened in the second week. A driver off sick, a late trunk run, a new starter on the dock. By now it is history. You fix what you think caused it, and wait for next month's figures to see whether it worked.

The data is yours, the view is not

Every measure the network uses is built from events your depot creates: scans, deliveries, collections, PODs, claims. You generate the data but only see the summary, weeks later, in the network's format.

  • Network scorecards are periodic, not daily.
  • They rarely break the figure down by driver, route or shift.
  • Your own systems hold the detail but are not set up to report it this way.
  • Nobody has time to build the figures by hand every day.

Why a late view costs you

A problem that starts on a Monday and is visible on Tuesday can be fixed by Wednesday. The same problem found on a scorecard three weeks later has already done its damage to your figures and to the customers involved.

Standing within the network matters. It can affect conversations about your territory, your costs and your reputation with other members who rely on you to deliver their customers' pallets.

Inside the depot, a late view also makes problems personal in the wrong way. When a bad month is discussed weeks afterwards, it turns into a search for someone to blame. When the dip is seen the day after, it is a practical question about one shift, one route or one piece of kit, and it gets fixed without drama.

There is also the time spent answering the network. Explaining a poor period from memory takes far longer than explaining it from a record made at the time.

How we build your own daily scorecard

  1. We agree with you which measures matter, using the definitions your network publishes to members.
  2. Your scans, run data, POD records and claims are collected from the network system and your own tools, wherever they can be read.
  3. Each measure is calculated daily, and broken down by shift, route, driver or customer as the data allows.
  4. A simple dashboard shows the figures against your targets, with a trend line and yesterday's detail.
  5. When a measure drops below a threshold, the depot manager gets a message the same day with the consignments behind it.
  6. At the end of each period, your figures are compared with the network's, so any difference in how they are counted is explained.
MeasureBuilt fromBroken down by
Scan complianceYour depot and hub scansShift, loader
On-time deliveryRuns and POD timesRoute, driver, service
Failed collectionsCollection recordsCustomer, reason
ClaimsDamage and loss recordsCustomer, stage

Our figures may not match the network's exactly, because definitions and timing differ. We show where and why, so you know how to read both.

Running the depot from yesterday's numbers

The morning meeting starts with yesterday's figures and the consignments behind any dip. Problems are traced to a shift or a route while people still remember the day. By the time the network's scorecard arrives, it confirms what you already knew and what you did about it.

Is this your depot?

  • The network scorecard is the first you hear of a problem.
  • You cannot break network figures down by driver or shift.
  • Performance calls with the network are about past months.
  • Nobody has time to build daily figures by hand.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will our figures match the network's?

Not always exactly, because of definitions and timing. We reconcile them at period end and explain any difference.

Can we see individual drivers' performance?

If your data records who did what, yes. How you use that information with staff is your decision.

Do we need a data warehouse?

No. For a depot, a small database and a dashboard in something like Power BI or a simple web page is usually enough.

What drives the cost?

How many measures, how many data sources and how easy the network's data is to read.

What do you need from us?

The network's scorecard definitions, a few recent scorecards, and access to your scanning and run data.

Keep reading

More on Problems We Solve

Start here

Tell us what your depot manager checks by hand

Describe how your depot runs from the inbound trunk to the last collection, which network and in-house systems you use and what you keep in spreadsheets. We will tell you what we would build and what we would leave alone, and if the network already provides it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →