Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do Painters and Decorators Order the Right Amount of Paint for Each Job?
Problems We Solve

How Do Painters and Decorators Order the Right Amount of Paint for Each Job?

Painters run short of paint mid-job or stack up spare tins. We build a paint takeoff that works out litres per colour and sends clear merchant orders.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Paint orders go wrong because litres are estimated per job by eye, colour codes and sheens are copied by hand, and tinted paint cannot be returned. We build a paint takeoff that uses each room's areas and coats to calculate litres by product, colour and sheen, checks against leftover stock, and sends a clear order to your trade counter with codes spelled out.

Half a wall short on Friday afternoon

The painter is on the second coat of the lounge on Friday when the tin runs out. The colour was mixed at the trade counter from a code, and it closes at four. He drives there, waits, gets a new tin, and hopes it matches. Meanwhile the van has three part-used tins of the wrong colour from other jobs and two unopened five litre tubs of trade white that nobody needs.

On another job, the order was placed with the colour name but not the code, and the counter mixed a similar shade from a different range. Nobody noticed until the customer did.

Why the order goes wrong

Paint quantities depend on the surface area, the number of coats, the product's coverage and the surface itself. Porous new plaster and a strong colour change drink paint. Most decorators know this, but work out orders quickly on the morning, from memory.

  • Litres are estimated, not calculated from areas and coats.
  • Coverage differs between products and surfaces, but the same rule of thumb is used.
  • Colour codes, ranges and sheens are copied by hand, sometimes by text.
  • Tinted paint cannot usually be returned, so over-ordering is costly.
  • Leftover stock is not recorded, so it is never used first.

What bad orders cost

Running short costs painter time on the road and risks a colour mismatch between batches. Over-ordering ties money up in paint that will probably never be used. Wrong colour or sheen means redoing a wall, a room, or more, plus the paint. And a van full of half tins with smudged labels is not stock anyone can use.

Colour mistakes are the most expensive, because they are not found until paint is on the wall. A tin mixed to the wrong code looks fine in the tin and only shows itself in daylight after the first coat. By then the room has to be done again, often with the customer watching, and the painter's day has been spent twice.

The paint takeoff we build

  1. The quote's room survey holds wall, ceiling and woodwork areas, plus the surface condition and colour change, which set the coats by your rules.
  2. Each surface is assigned a product, colour code, range and sheen, chosen from a list or the customer's colour schedule, never typed freehand.
  3. The takeoff calculates litres by product and colour using the coverage figures you set for each product and surface type, plus a margin you choose.
  4. Leftover stock in the unit or vans, recorded with colour codes, is checked first, and the order is reduced where it can be.
  5. The order goes to your trade counter by email in a clear format, with codes, sheens and tin sizes, and a copy on the job.
  6. When the job ends, leftovers are logged, labelled and either left with the customer for touch-ups or returned to stock.
InputWhere it comes from
AreasRoom survey
CoatsCondition and colour change, your rules
CoverageYour figures per product and surface
Colour and sheenCustomer's colour schedule
StockLeftover tins recorded with codes

The difference on the next job

Painters start the job with enough paint in the right colours, and rarely drive to the trade counter mid-job. Colour codes reach the counter exactly as chosen. Spare tins are used on the next job that needs them. And over a few months, the recorded use per job tells you how accurate your coverage figures really are.

Signs your paint ordering needs work

  • Painters regularly run short mid-job.
  • You have unused tinted paint that will never be used.
  • A wrong colour or sheen has been mixed from a copied code.
  • Leftover tins are unlabelled or untracked.
  • Orders are worked out on the morning of the job.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Where do coverage figures come from?

From the figures you give us, usually from product data sheets adjusted by your experience. The takeoff uses yours.

Can it order directly from our trade counter?

It can email orders in a clear format. Where a supplier has an ordering portal or API, we can check whether it can be linked.

Does it work if we do not use the survey tool?

Yes, but you would need to enter areas per room. It works best with a survey.

What affects the cost?

The number of products and suppliers, whether stock tracking is included, and links to quoting or job software.

What do you need from us?

A few recent jobs with the paint you ordered, the products you use most, and your trade counter details.

Keep reading

More on Problems We Solve

Start here

Tell us where your decorating jobs lose time

Describe the work you take on, domestic, commercial or both, how many painters you run and what you quote and invoice with today. We will tell you what we would build and what we would leave alone, and if a simpler fix would do, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →