Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. Why Does Our Team Spend Two Days Every Fortnight Building the Steering Committee Pack?
Problems We Solve

Why Does Our Team Spend Two Days Every Fortnight Building the Steering Committee Pack?

Management consultancy steering committee packs get rebuilt by hand each cycle. We build packs that pull status, RAID items and milestones from your trackers.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Steering committee packs eat days because status, milestones, risks, decisions and budget sit in separate trackers, and each pack is assembled by copying from them into slides. We build a pack generator that reads your programme trackers, produces the standard slides in your template with current data, and leaves the team to write the commentary and the decisions needed.

Every other Wednesday, the PMO disappears into PowerPoint

Your firm runs the programme management office for a client's transformation. Every fortnight, the steering committee meets, and the pack is the firm's most visible output. Building it means updating the milestone chart, the RAG status for each workstream, the top risks and issues, the decisions log, the budget position and the benefits tracker, all from their spreadsheets, into slides.

Workstream leads send updates late and in different formats. Numbers in the pack do not match the trackers because someone changed a tracker after copying. The team finishes at midnight and the pack still needs partner review.

Why packs take so long

  • Data lives in several trackers, spreadsheets and tools.
  • Every slide is updated by copying and pasting.
  • Workstream updates arrive in inconsistent formats.
  • Last-minute tracker changes are not reflected in the slides.
  • The format is the same each cycle, but the work is repeated from scratch.

Consistency matters more than it seems. Steering committee members compare this pack with the last one. If a milestone moved or a risk disappeared without explanation, they notice, and a PMO that cannot explain its own numbers quickly loses authority in the room.

What that costs

IssueEffect
Days of consultant time per cycleLess time on the programme itself
Inconsistent numbersSponsor loses confidence in the PMO
Rushed commentaryCommittee discussions less useful
Late packsMembers cannot prepare

A steering committee pack is supposed to support decisions. When most effort goes into assembling it, the thinking gets squeezed.

It also crowds out the PMO's real value. The most useful thing a PMO can do before a steering committee is spot the workstream that is quietly slipping and get the right decision on the agenda. That analysis is what gets dropped when the team is busy copying numbers into slides.

How we build a pack generator

  1. We connect to your trackers, whether Excel files in SharePoint, Smartsheet, Jira, Microsoft Planner or a custom tool, and read milestones, status, risks, issues, decisions and budget.
  2. Workstream leads submit updates through a short form with consistent fields: RAG, key progress, next steps, escalations.
  3. The generator builds the standard slides in your PowerPoint template: milestone chart, workstream status, top risks, decisions required, budget and benefits.
  4. Numbers on the slides are drawn directly from the trackers, so they match.
  5. The team adds commentary and the executive summary, which is where their judgement goes.
  6. A language model can draft a summary of changes since the last pack for the team to edit.
  7. Packs are saved with a snapshot of the data behind them, so any figure can be traced later.

We usually start by rebuilding one recent pack from the trackers, with the team, to agree which slides can be generated and which need human writing. The first live cycle runs alongside the manual process so everyone can compare the results.

What PMO fortnights look like after

The pack's standard slides are ready within minutes of the update deadline. The team spends its time on the executive summary, the decisions the committee needs to make, and chasing the workstream that is slipping.

The sponsor gets a consistent, accurate pack on time, which is the PMO's reputation in a single document.

Is this your PMO?

  • Steering committee packs take days to build.
  • Numbers in the pack sometimes disagree with trackers.
  • Workstream updates arrive late and inconsistent.
  • Commentary is written in a rush.
  • The same slides are rebuilt every cycle.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can we keep the client's pack template?

Yes. The generator uses whichever PowerPoint template the programme requires.

What if the client's trackers are in their own systems?

We connect where access and the client's IT policy allow. Otherwise trackers can be exported to a shared location on a schedule.

Will the AI write the pack?

It drafts a change summary. Status judgements, commentary and recommendations remain with your team.

What affects the cost?

The number and type of trackers, the complexity of the template, and whether several programmes use the generator.

Keep reading

More on Problems We Solve

Start here

Tell us where your consultancy's own operations creak

Describe the process, the tools your consultants and operations team use today, and where it breaks down. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →