How Do We Track Every RFI to the Architect and Engineers So Site Is Not Waiting on an Answer Nobody Is Chasing?

Main contractor RFIs get lost in email chains with the design team. We build an RFI log that tracks each query, who owes the answer, and what work it holds up.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

RFIs get lost because they are sent as emails to whoever seems right, answered in reply chains, and tracked in a spreadsheet that falls behind. We build an RFI log where site and subcontractors raise queries with drawings and photos, each RFI is routed to the right consultant with a required-by date tied to the programme, answers are recorded against it, and anything holding up work is shown to the project manager.

Where is the answer about the lintel?

Your site manager found a clash between the structural drawings and the architect's section at first-floor level. He emailed the architect with a photo. The architect replied that it was a structural question. The engineer asked for a marked-up drawing. Three weeks later the bricklayers are working round the opening and nobody can find the final answer, because it was a phone call.

On a busy job there are dozens of these at any time. Some are trivial. Some hold up a whole trade. From the office you cannot tell which is which.

Why queries go missing

RFIs travel through email, which is built for conversation, not tracking. A query has an owner, a deadline and a consequence if it is late, and email records none of those. Spreadsheet logs help until they are not updated, which happens as soon as the project gets busy.

  • Queries go to individuals rather than a tracked address.
  • Answers come back in reply chains, calls and meeting comments.
  • Nobody records the date by which site needs the answer.
  • Subcontractors' queries reach the design team through different people.
  • Closed and open RFIs look the same in an inbox.

What slow answers cost

Work stops or goes ahead on assumptions. Trades are re-sequenced around unanswered questions. Rework follows when the answer, when it comes, is not what was assumed. When there is later a question about why a section of the job was late, the chronology of queries and answers is scattered through a dozen inboxes. Your contract and advisers decide what that chronology means; the point here is having it at all.

The RFI log we build

  1. RFIs are raised from a phone or laptop by your team or subcontractors, with the drawing reference, a marked-up image or photo, and the question.
  2. Each RFI gets a number, the trade and area it affects, and the date site needs an answer, linked to the relevant activity in the programme where it can be.
  3. It is routed to the right consultant based on its type, with the design manager copied. Consultants reply by email and the answer is captured against the RFI.
  4. Answers that change design are linked to the revised drawing or instruction that follows.
  5. Overdue RFIs are chased automatically, then shown to the project manager, with the work they hold up.
  6. The subcontractor who raised it is told when it is answered.
  7. A weekly summary shows open RFIs by consultant and by how close they are to affecting the programme, for the design team meeting.
RFI fieldWhy it matters
Needed-by dateShows which queries are urgent
Programme activityShows what work is held up
OwnerShows who has to answer
Answer and sourceFinal answer in one place
Linked revision or instructionCloses the loop with the design change

If your project uses a common data environment or a platform such as Procore that already holds RFIs, we connect to it and add the chasing and reporting rather than creating a parallel log.

What the project team sees

Every query has one home. Site managers stop trying to remember who they asked. Consultants get clear, numbered questions with the drawing attached, which makes answering easier. Design team meetings start from a list of what is overdue and what it is holding up. And when the job is reviewed later, the query history is complete.

Are your RFIs like this?

  • RFIs are sent as ordinary emails to individuals.
  • Answers are hard to find once the thread moves on.
  • You do not know which open queries are holding up work.
  • Subcontractors raise queries through different routes.
  • The RFI spreadsheet is always behind.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do consultants have to log in?

No. They receive a numbered email and reply to it. Their answer is captured against the RFI.

Can it work with our common data environment?

Where your platform has an API, we connect to it. Otherwise we link to drawings by reference.

Who decides the needed-by date?

Your site or design manager, with the programme shown next to them. The system only records and chases.

Does it replace design team meetings?

No. It makes them shorter, because the open list is already prepared.

What affects the cost?

Your document platform, the number of projects and consultants, and whether RFIs need to link to the programme.

Keep reading

More on Problems We Solve

Start here

Tell us where your sites and office lose time

Describe the problem, the systems your site managers and office use, and how many live projects you run. We will tell you what we would build and what we would leave alone, and if a change inside the software you already pay for would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →