How Do We Get Every Subcontractor Working to the Same Three-Week Lookahead Instead of Last Month's Programme?

Main contractor lookahead programmes are printed, pinned up and out of date by Wednesday. We build a live lookahead that each trade sees and confirms weekly.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Lookaheads fail because they are exported from the master programme, printed and pinned to the cabin wall, then overtaken by events. We build a live lookahead drawn from your programme in Asta Powerproject or Microsoft Project, broken into what each trade must do in the next three weeks, sent to each subcontractor to confirm or flag, and fed back to the planner as constraints.

The sheet on the cabin wall

Your planner updates the master programme monthly. The site manager takes the next three weeks, turns it into a bar chart in a spreadsheet, prints it and pins it up. It gets discussed at the Tuesday subcontractor meeting. By Thursday the plasterer is waiting for the M&E first fix to finish, the M&E firm did not realise the ceilings were due, and the roofer is on another job because nobody told them the steel had arrived early.

Everyone had the programme. Nobody was working to the same one.

Why the lookahead drifts

A lookahead is only useful if it is current and if each trade has said yes to its part. Printed sheets are neither. The master programme and the site's version diverge within days, and subcontractors only see the whole chart, not the few lines that concern them.

  • The lookahead is a copy of the programme, not a live view of it.
  • Subcontractors are shown everyone's activities, so their own get lost.
  • Nobody formally confirms they have the labour and materials for next week.
  • Constraints raised at the meeting are noted in minutes, not on the programme.
  • Progress is reported to the planner monthly, so the master is always behind.

What a drifting programme costs

Trades arrive to areas that are not ready and either stand or leave. Follow-on trades get squeezed. Your site manager spends the week re-sequencing by phone. The monthly programme update to the client shows slippage that could have been flagged weeks earlier, and the reasons for it are harder to pin down later.

There is a people cost as well. Good subcontractors lose patience with a main contractor whose programme they cannot trust, and they price that uncertainty into the next job or put their best gang elsewhere. A site manager who spends every afternoon on the phone re-sequencing trades is not walking the job, checking quality or planning the week after next.

The live lookahead we build

  1. We read activities from your master programme file or planning tool on a schedule, so the lookahead always reflects the current programme.
  2. The next three weeks are split by trade and by area, so each subcontractor sees only the activities that involve them and the ones they depend on.
  3. Each week, each subcontractor gets their lines by email or text and confirms, or flags a constraint: labour, materials, access, information.
  4. Constraints go on a board the site manager works through before the next meeting, each with an owner.
  5. The site manager marks progress on a phone against each activity, with photos, during the week.
  6. Progress and constraints are summarised for the planner, so the master programme update starts from site facts.
  7. Subcontractors who have not confirmed are shown at the meeting, not discovered on Monday morning.
What a trade seesExample
Its activitiesSecond fix electrics, level 2, from Monday week
What it depends onPlaster finish, level 2, due Friday
What depends on itDecorators, level 2, following week
Open constraintsLight fittings not yet delivered
Confirm or flagOne tap reply, or a short note

Your planner keeps the master programme in whatever tool they use. We do not replace planning software; we get it read.

A lookahead people actually follow

Each subcontractor knows what is expected of them next week and has said so. The site manager sees constraints days earlier, while there is still time to deal with them. The planner updates the master from site progress rather than guesses. And when the client asks why an area is late, the constraint history is already written down.

Is your lookahead a pinned-up printout?

  • The lookahead is printed from a spreadsheet each week.
  • Trades turn up to areas that are not ready.
  • Subcontractors do not confirm their labour for the coming weeks.
  • Constraints are in meeting minutes rather than on the programme.
  • The planner updates the master monthly from phone calls.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Which planning software does it work with?

Asta Powerproject and Microsoft Project are the common ones, through their file exports or APIs. We check yours first.

Does it change our master programme?

No. The planner stays in control of the master. We read it and feed progress back as a summary.

Do subcontractors need logins?

No. They get their lines by link, email or text and reply there.

Can it follow last planner or pull planning methods?

It can support weekly commitments and constraint removal if you work that way. It does not require it.

What affects the cost?

Your planning tool, the number of projects, and how progress is recorded on site today.

Keep reading

More on Problems We Solve

Start here

Tell us where your sites and office lose time

Describe the problem, the systems your site managers and office use, and how many live projects you run. We will tell you what we would build and what we would leave alone, and if a change inside the software you already pay for would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →