Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop Scrambling for Local Labour, Apprentice and Spend Figures Every Time a Framework Wants Its Social Value Return?
Problems We Solve

How Do We Stop Scrambling for Local Labour, Apprentice and Spend Figures Every Time a Framework Wants Its Social Value Return?

Main contractors scramble for local labour and spend figures for social value returns. We build a record that gathers them from site and accounts as it happens.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Social value returns take days because the figures, local labour, apprentices, local spend, school visits, volunteering, are scattered across sign-in records, payroll, accounts and people's memories. We build a social value record that captures each measure where it happens, from site sign-in postcodes to supplier spend, holds the evidence, and produces the return in each client's or framework's format.

Return due Friday, figures nowhere

You won a public sector job through a framework, and part of the tender was a set of social value commitments: a share of local labour, apprentices on site, spend with local suppliers and small businesses, careers talks at local schools. Every quarter the framework wants a return. Your bid manager, who wrote the commitments, asks the site manager for figures. The site manager has a rough idea. Accounts can produce spend by supplier, but not whether each supplier is local. Nobody wrote down the school visit's date.

The return goes in late, with estimates, and without the evidence the framework now wants attached.

Why the figures are never ready

Social value commitments are written by the bid team and delivered by site teams who are busy building. The data each measure needs is recorded in a different place, or not recorded, and nobody collects it as it happens.

  • Local labour needs operatives' home postcodes, which the sign-in sheet does not record.
  • Apprentice weeks are in subcontractors' records, not yours.
  • Local and small business spend needs supplier postcodes and sizes matched to payments.
  • Community activities are done but not logged with evidence.
  • Each framework and client asks for a different format.

What the scramble costs

Bid managers and site managers lose days each quarter. Returns go in with estimates that are hard to defend if questioned. Commitments you actually met are under-reported because the evidence is missing. And when you bid for the next framework job, you cannot show a strong, evidenced track record, which is exactly what those tenders score.

The social value record we build

  1. Your commitments for each job are loaded with the measures and targets you agreed.
  2. Site sign-in captures each operative's home postcode district once, with their consent, so local labour is counted automatically from attendance.
  3. Apprentices and trainees are flagged in sign-in, including subcontractors' apprentices, so weeks on site are counted.
  4. Supplier and subcontractor records hold postcode and business size, and payments from your accounts system are matched to them for local and small business spend.
  5. Community activities, such as school talks, site visits and volunteering, are logged on a phone with date, hours, attendees and photos.
  6. Progress against each commitment is shown to the project team monthly, so shortfalls are seen while they can be addressed.
  7. Returns are produced in each framework's or client's format, with evidence attached. Where you use a social value measurement framework, figures are mapped to its measures.
MeasureWhere the data comes from
Local labourSign-in with postcode district
Apprentice weeksSign-in flag for trainees
Local and small business spendPayments matched to supplier records
Community activityPhone log with photos
EvidenceHeld against each entry

What you commit to and how you report it is agreed between you and your client. We make sure the figures and evidence exist when the return is due.

Returns that write themselves

The return becomes a check of figures that already exist, not a hunt. Evidence is attached as it was collected. Project teams can see during the job whether they are on track and do something about it, rather than finding out at the end. And your bid team has an evidenced record across jobs to use in the next framework tender.

Is your social value reporting like this?

  • Social value returns take days to compile.
  • Local labour figures are estimates.
  • You cannot evidence spend with local or small suppliers.
  • Community activities go unrecorded.
  • Each framework's format means starting again.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Is collecting operatives' postcodes allowed?

It is personal data, so it needs a clear purpose, consent where appropriate, and minimal detail such as the postcode district. Your data protection lead decides the approach, and we build to it.

Can subcontractors' figures be included?

Yes. Their operatives sign in on the same system, and subcontractors can add their own local spend through a link.

Does it work with measurement frameworks?

Where you report against a social value measurement framework, we map your figures to its measures.

Does it make our commitments for us?

No. It records and reports. Commitments are made by your bid team with the client.

What affects the cost?

The number of jobs with commitments, your sign-in and accounts systems, and the formats you need.

Keep reading

More on Problems We Solve

Start here

Tell us where your sites and office lose time

Describe the problem, the systems your site managers and office use, and how many live projects you run. We will tell you what we would build and what we would leave alone, and if a change inside the software you already pay for would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →