Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do Our Directors See What Is Happening on Every Live Site Without a Round of Monday Phone Calls?
Problems We Solve

How Do Our Directors See What Is Happening on Every Live Site Without a Round of Monday Phone Calls?

Main contractor directors ring each site manager to find out how jobs are going. We build a live overview of every site from records your teams already keep.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Directors phone round because the facts about each job, progress, labour, open issues, cost, cash and client mood, live in different systems and people's heads. We build a single overview that pulls those facts from the diary, programme, sign-in, RFI and defect logs, cost reports and invoicing, shows every live job on one page with the exceptions highlighted, and lets a director open any job to see why.

Monday morning, eight phone calls

At the start of every week your managing director and construction director ring round the site managers and project managers. How is it going? Are we on programme? Any problems with the client? Anything I need to know? Each call takes a while, the answers vary in detail and honesty, and by Wednesday the picture has changed. The monthly board pack gives a fuller view, but it is weeks old when it is read.

Meanwhile the site managers stop what they are doing to take the call, and the problems a director could have helped with are sometimes the ones nobody mentions.

Why there is no single picture

Each part of the business keeps its own records well enough for its own purpose. Site keeps diaries, the planner keeps the programme, commercial keeps cost reports, accounts keeps invoicing. Nothing joins them up, so the only integration is a conversation.

  • Progress is in the programme and the site diary.
  • Labour is on sign-in sheets.
  • Open issues are in RFI, instruction and defect logs.
  • Cost and value are in the monthly cost report.
  • Cash is in the accounts system.

What the phone round costs

Directors spend hours a week gathering information instead of acting on it. Site managers are interrupted and learn to give reassuring answers. Problems surface late, when a quiet word or a decision earlier would have been cheaper. And the business is run on a mix of monthly reports and impressions, which is how a difficult job stays hidden until the cost report shows it.

The live overview we build

  1. We connect to the records your teams already keep: site diary, programme, sign-in, RFI and instruction logs, defects, cost reports and your accounts system.
  2. Each live job gets a row on one page: programme position, labour this week against plan, open RFIs and instructions, overdue items, latest cost and value position, cash due and overdue.
  3. Thresholds you set highlight exceptions, for example a job slipping against programme or labour well below plan for two weeks.
  4. A director can open any job to see the detail behind a number, down to the diary entry or the RFI.
  5. Site managers add a short weekly note on their phone, with any help they need from the directors.
  6. A Monday summary arrives by email with what changed since last week.
  7. The monthly board pack is produced from the same data, so the numbers agree.
MeasureSourceHighlighted when
Programme positionPlanner's latest updateSlipping beyond your threshold
LabourSign-in recordsBelow plan for a sustained period
Open informationRFI logOverdue items holding up work
Cost and valueCost reportsMargin moving beyond your threshold
CashAccounts systemOverdue beyond your terms

The overview only shows what your records hold. We usually start with the records that are already digital and add others as they move online.

What a director's Monday looks like

The phone calls get shorter and more useful, because the director already knows the facts and can ask about the one job that needs attention. Site managers spend less time reporting and get help earlier. Problems show up in the data before they become crises. And the board sees current figures rather than last month's.

Is this how you keep track of your sites?

  • Directors ring round site managers every week.
  • The board pack is weeks old when it is read.
  • Problems on a job surface late.
  • Different systems give different figures for the same job.
  • Nobody can see every live job on one page.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do we need all our records digital first?

No. We start with what is digital and the overview grows as more records move online.

Which systems can it connect to?

Common construction and accounts systems with APIs or exports, plus spreadsheets where that is what you use. We check what you have first.

Will site managers feel watched?

The overview uses records they already keep. Most of the change for them is fewer phone calls, and a way to ask for help in writing.

Can we choose the thresholds?

Yes. You set what counts as an exception for your business, and can change it at any time.

What affects the cost?

The number of systems to connect, how clean their data is, and the number of live jobs.

Keep reading

More on Problems We Solve

Start here

Tell us where your sites and office lose time

Describe the problem, the systems your site managers and office use, and how many live projects you run. We will tell you what we would build and what we would leave alone, and if a change inside the software you already pay for would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →