How Do We Stop Subcontractor Daywork Sheets Turning Up Weeks Later With Nobody Remembering the Work?

Main contractors get daywork sheets weeks late with hours nobody can check. We build same-day daywork capture with photos, sign-off and the instruction.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Daywork sheets cause arguments because they are paper, arrive late and are signed by whoever was nearest without a check of hours or the instruction behind them. We build a daywork record raised on the day, on a phone, linked to the instruction that authorised it, with labour, plant and materials, photos, and your site manager's sign-off, so the QS gets a clean record the same week.

A pile of carbon copies on the QS's desk

At the end of the month a subcontractor's application arrives with twenty daywork sheets attached. Some are signed by your site manager, some by a foreman who has since left, one by the client's clerk of works. Two describe work your site manager says was in the subcontractor's package anyway. One claims six operatives for a day when the sign-in sheet shows four.

Your QS now has to decide what to accept, weeks after the work, with no photos and no clear link to who asked for it. Whatever they decide, somebody will be unhappy.

Why dayworks turn into disputes

A daywork sheet only works if it is agreed while the work is fresh. Paper sheets get filled in at the end of the week, signed in a hurry and handed in with the application. By then the facts are a matter of memory. The root cause is not bad faith. It is that the record is made too late and without the evidence that would settle it.

  • Sheets are written at the end of the week, not on the day.
  • Nothing links the sheet to the instruction that authorised the work.
  • Signatures show someone saw the paper, not that they checked the hours.
  • Labour on the sheet is not compared with who was on site.
  • Sheets arrive with the application, long after the work is covered up.

What late dayworks cost you

You either pay for hours you cannot check or fight over them, and both damage the relationship with a subcontractor you may need next month. Where the work was instructed by your client, the same weak record makes it harder to recover the cost upstream. And your QS spends days each month on sheets that should have taken minutes to agree.

Daywork capture on the day

  1. The subcontractor's foreman raises a daywork record on a phone, on the day, against the project and the area of work.
  2. It must reference an instruction: a site instruction, an email or a verbal instruction logged in the site diary. No reference, no record.
  3. Operatives are picked from those signed in that day, so the labour is checked against attendance automatically.
  4. Plant and materials are added with delivery notes or hire references where they exist.
  5. Photos of the work, before it is covered, attach to the record with time and location.
  6. Your site manager approves, queries or rejects on their phone, with a reason. Unapproved records chase them after a set time.
  7. Approved dayworks flow to the QS, grouped by subcontractor and by instruction, ready to value against the subcontract rates.
Question at valuationPaper sheetDaywork record
Who authorised it?Often unclearLinked instruction
Were those people on site?UnknownChecked against sign-in
What did it look like?No evidenceTimed, located photos
When was it agreed?Weeks laterOn the day, by the site manager
Is it client-recoverable?Worked out laterTagged to the client instruction

What the QS and site manager notice

Dayworks are agreed while the work is visible. The QS receives records that are already checked for attendance and authorised by instruction, so valuation is quick and the arguments are about the few that deserve it. Dayworks caused by client instructions are grouped for recovery. Subcontractors know where they stand each week rather than at the end of the month.

The subcontract itself does not change. Your rates, your daywork terms and your approval limits stay as they are. What changes is when the facts are fixed. A record agreed on Tuesday afternoon, with a photo of the opened-up ceiling and the name of the person who asked for it, leaves very little to argue about at the end of the month, and the arguments that remain are about genuine differences rather than memory.

Do your dayworks look like this?

  • Daywork sheets arrive in bundles with the monthly application.
  • You cannot tell who authorised the work.
  • Hours on the sheet do not match who was on site.
  • There are no photos of the work before it was covered.
  • Recovering client-instructed dayworks is a separate hunt.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do subcontractors need to install an app?

No. Foremen use a secure web link on their phone. Nothing to install.

What if a subcontractor still hands in paper?

Paper can be photographed and entered by the site team, but it is marked as late so the QS knows it was not captured on the day.

Does it value the dayworks?

It groups and prices them against the rates you load. The QS decides what is accepted.

Can the client see client-instructed dayworks?

If you choose to share them, a report per instruction can be issued from the same records.

What affects the cost?

The number of projects, whether sign-in data already exists digitally, and the systems the QS uses for valuations.

Keep reading

More on Problems We Solve

Start here

Tell us where your sites and office lose time

Describe the problem, the systems your site managers and office use, and how many live projects you run. We will tell you what we would build and what we would leave alone, and if a change inside the software you already pay for would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →