Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop Dispatch Being Held Up by Certificates of Conformity and Delivery Paperwork?
Problems We Solve

How Do We Stop Dispatch Being Held Up by Certificates of Conformity and Delivery Paperwork?

Machine shop dispatch waits on hand typed C of Cs, labels and cert packs. We build dispatch paperwork generated from the job record, checked before it goes out.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Dispatch paperwork is slow because the delivery note, the certificate of conformity, the customer's labels and the cert pack are each produced separately, often by retyping from the job and the purchase order. We build dispatch that produces all of it from the job record in one step, checks it against the customer's requirements and the order, and emails the documents to the customer when the parts leave.

Parts packed at three, still on the bench at five

The batch has passed final inspection and is boxed. Now the office has to type the delivery note, fill in the certificate of conformity with the customer's PO number, part number, revision and quantity, print the customer's own labels with their barcode format, dig out the material and anodising certificates, and put it all together.

The courier arrives at half four and leaves at twenty to five. The paperwork is not ready. The parts go tomorrow, and the customer's receiving team logs them as late.

Why dispatch is a paperwork bottleneck

Every customer wants something slightly different. One wants the C of C signed by a named person, another wants their own label with a specific barcode, a third wants the cert pack as a single PDF emailed before the parts arrive. The details live in someone's memory or a sticky note on the monitor.

  • Delivery notes and C of Cs are typed from the job and the PO.
  • Customer specific requirements are not recorded against the customer.
  • Labels are made in a word processor or a separate label program.
  • Certificates from goods in and outside processing are found by hand.
  • Part shipments against the same order line are tracked on paper.

The cost of slow or wrong paperwork

Missed collections and late deliveries on parts that were ready. Rejections at the customer's goods in for missing certificates, wrong revision on the C of C, or labels their scanner cannot read. Invoices held until the paperwork is corrected. A typing error on a C of C, the document where you state the parts conform, is a bad place to make one.

The dispatch process we build

  1. Each customer has a dispatch profile: C of C format and wording, who may sign it, label format and barcode, packaging notes, certificate requirements and where to email documents.
  2. When a job is marked ready to ship, the tool pulls the PO number, line, part number, revision, quantity, batch and material batch from the job record. Nothing is retyped.
  3. It checks the job against the customer's requirements: final inspection passed, material certificate present, outside processing certificates present, FAI done if required. Gaps block the dispatch and are listed.
  4. The delivery note, C of C and labels are produced together. The authorised person approves the C of C on screen.
  5. The cert pack is assembled into one PDF in the order the customer wants.
  6. When the carrier collects, the documents are emailed to the customer with the tracking reference, and part shipments are recorded against the order line.
DocumentBuilt from
Delivery noteJob, PO line and quantity shipped
Certificate of conformityJob record plus the customer's wording
Customer labelsCustomer label format and part data
Material certificatesGoods in record for the batches used
Process certificatesOutside processing returns

What changes at the dispatch bench

Paperwork is ready when the parts are, because it is produced from records that already exist. Missing certificates are caught at the dispatch check, while there is still time to chase them, rather than at the customer's goods in. New staff can dispatch for any customer because the requirements are in the profile, not in someone's head.

Invoicing can follow straight after dispatch, with the delivery note number and quantities matching exactly.

When a customer queries a delivery months later, the full set of documents that went with it is stored against the job: which C of C was signed, by whom, with which certificates attached. That is quicker to produce than a reprint, and it shows exactly what the customer received.

Is dispatch paperwork slowing your deliveries?

  • C of Cs are typed by hand.
  • Parts miss collections waiting for paperwork.
  • Customers have rejected deliveries for document errors.
  • Customer label requirements live on a sticky note.
  • Cert packs are assembled from several folders.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can a person still sign the C of C?

Yes. The authorised person reviews and approves it on screen, and their name and the date are recorded. Your procedures decide who that is.

Does it work with our label printer?

Most thermal label printers can be driven directly. We check your printer and your customers' label formats first.

Can it book couriers?

It can, with carriers that offer an API. Otherwise it records the tracking reference you enter.

What if our job records are incomplete?

The dispatch check shows what is missing. That often leads to tightening records earlier in the job.

Keep reading

More on Problems We Solve

Start here

Tell us where the machine shop office loses time

Describe how a job moves from RFQ to dispatch today, which systems you run and where the paperwork piles up. We will tell you what we would build and what we would leave alone, and if a change inside your existing MRP or spreadsheets would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →