Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Coordinate Fencers, Electricians and Tree Surgeons on Our Garden Builds?
Problems We Solve

How Do We Coordinate Fencers, Electricians and Tree Surgeons on Our Garden Builds?

Landscaping builds stall when fencers, electricians and tree surgeons arrive out of order. We build a subcontractor board that books, confirms and tracks them.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Subcontracted trades cause delays on garden builds because they are booked by text, confirmed by nobody, and not told when your own crew's dates move. We build a subcontractor board that places each trade in the job sequence, sends booking and change messages, collects confirmations and paperwork such as insurance and certificates, and tracks their invoices against what was agreed.

The electrician is here, the trench is not

The garden lighting electrician turns up on Tuesday as booked. The trench for the armoured cable is not dug, because the crew lost two days to rain and are still on the walls. He leaves, and the next day he can offer is in three weeks. Meanwhile the tree surgeon who was meant to crown lift the sycamore before the patio went in has not replied to the last two texts, and the fencer has come a week early and put the posts where the new steps are going.

Your own crew's schedule is hard enough. Adding three other businesses with their own diaries, all booked by text from the owner's phone, makes a garden build fragile.

Why the sequence falls apart

Most garden builds need at least one specialist: tree work before groundworks, electrics for lighting and outdoor sockets, fencing, sometimes a bricklayer or a pond specialist. Each is booked for a date that depends on your crew's progress, but when that progress changes, nobody tells them.

  • Trades are booked by phone or text, so there is no shared record.
  • Their dates are not linked to the stage of the job they depend on.
  • When your schedule moves, subcontractors are told late or not at all.
  • Insurance certificates, electrical certificates and similar paperwork are collected at the end, if at all.
  • Subcontractor invoices are paid without being checked against the agreed price.

What the gaps cost

A wasted visit from a subcontractor can cost you a call-out charge and push a job back by weeks. Trades working out of sequence cause rework. Missing paperwork causes a problem at handover, when the customer wants the electrical certificate for their garden lighting and the electrician has moved on to other things. And unchecked invoices drift from what was agreed.

The subcontractor board we build

  1. Each job lists the trades it needs, with the stage each depends on, such as tree work before excavation, or cable duct before paving.
  2. Subcontractors are kept in a directory with their contact details, rates, and documents with expiry dates, like insurance, which prompts you to ask for renewals.
  3. Booking requests go out by text or email with the site, date, scope and access notes, and the trade confirms with a link.
  4. When your crew's progress moves the stage date, affected trades get a change message and asked to confirm the new date, and the owner sees who has not replied.
  5. Paperwork due at the end of their work, such as a certificate or a waste note, is requested automatically and attached to the job.
  6. Their invoice is checked against the agreed price and any approved extras before it goes for payment.
TradeDepends onPaperwork to collect
Tree surgeonBefore excavationInsurance, waste notes
ElectricianDuct laid, before pavingCertificate for the work
FencerLevels setInsurance
BricklayerFootings readyInsurance
Pond or water featureExcavation doneAs agreed

Which documents you ask for is your decision and your adviser's. The board makes sure what you ask for arrives and is kept.

A build that runs in order

Trades arrive when the job is ready for them because they are told when it moves. The owner stops chasing replies by text. The paperwork is on the job before the customer asks. And you build up a record of which subcontractors confirm, arrive and finish reliably, which is useful when choosing who to book next spring.

Signs your subcontractors need a board

  • A trade has turned up before the job was ready.
  • Subcontractors are booked from one person's phone.
  • Customers have waited for certificates after handover.
  • You do not know whose insurance has expired.
  • Subcontractor invoices are paid without checking.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do subcontractors need to use our software?

No. They get texts or emails with links to confirm. Nothing to install.

Can it tell us whether a subcontractor's insurance is adequate?

No. It stores what they send and warns you of expiry dates. What cover you need is for your adviser.

Does it work with our existing job system?

Usually. We connect to it to read job stages and dates, or the board can hold them if nothing else does.

What affects the cost?

How many trades you work with, how your jobs are scheduled today, and whether invoice checking is included.

What do you need from us?

Your list of regular subcontractors, a few recent jobs that used them, and how you book them now.

Keep reading

More on Problems We Solve

Start here

Tell us where the landscaping admin catches up with you

Describe your crews, the mix of design and build and maintenance work, and what you run the business on today. We will tell you what we would build and what we would leave alone, and if a setting in your current job software would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →