Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. Why Do Our Garden Build Quotes Take So Long to Go Out After We Have Measured Up?
Problems We Solve

Why Do Our Garden Build Quotes Take So Long to Go Out After We Have Measured Up?

Landscaping quotes stall between the site visit and the inbox. We build a survey-to-quote flow that turns measurements and photos into a priced draft quickly.

Updated 4 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Garden build quotes stall because the site visit produces a notebook sketch, forty photos and a tape measure reading that only the person who took them can turn into a price. We build a survey app and pricing engine that captures areas, levels and access on site, applies your own rates for patios, walls, turf and planting, and produces a draft quote for the owner to check rather than write from scratch.

The quote pile on the kitchen table

It is April. You have done nine site visits this week between running two crews, and each one ended with the homeowner asking when they will see a price. The notes are in a pocket book: a rough sketch of the back garden, a patio marked as roughly 6 by 4, a fall of about a brick towards the house, a side gate that looked too narrow for the dumper. The photos are on your phone, mixed in with progress shots from the job in Harrogate.

On Sunday night you sit down to price three of them. You work out the sub-base, check what sandstone is costing this month, guess at how many days the dig out will take, and write it up in Word. By the time the last one goes out, the customer has had two other quotes and has already booked someone.

It is not a writing problem

The obvious fix is to find more time for quoting. The real bottleneck is that the information needed to price a job is captured in a form only one person can read, and every quote is rebuilt from zero. The rates you actually charge for a square metre of porcelain on a full sub-base, or a linear metre of sleeper wall, are in your head or scattered across last year's quotes.

  • Measurements are written as sketches, not as areas and lengths a system can use.
  • Things that change the price, like access, levels and spoil removal, are remembered rather than recorded.
  • Your build-up rates live in old quotes, so each one is priced slightly differently.
  • Material prices from the merchant change and the quote template does not know.
  • Only the owner or the designer can turn a visit into a price, so quotes queue behind them.

What the slow quotes are costing

Homeowners booking a garden makeover in spring usually ask for three prices and often go with the first sensible one. A quote that arrives a fortnight after the visit is competing against people who already have a start date pencilled in. There are quieter costs too. Rushed Sunday pricing leads to jobs that were underpriced on the dig out or the skip count, and you only find out when the crew is on day nine of a seven day job. And the owner's evenings disappear.

The survey-to-quote flow we build

  1. A survey app on your phone or tablet records each element of the garden as a line item: patio area, path length, wall height and length, turf area, planting beds, fencing runs. Photos attach to the item they relate to rather than sitting in the camera roll.
  2. Site conditions that affect the price are asked for every time: access width, whether a dumper or only barrows can get through, levels and falls, spoil to remove, existing features to break out.
  3. A pricing engine applies your own build-ups. You tell us how you price a square metre of patio, what goes into sub-base and bedding, and how many labour hours you allow, and the engine uses those numbers, not ours.
  4. Material costs are pulled from a price list you keep up to date, or from your merchant's price file where they supply one.
  5. The engine produces a draft quote in your branding, with a scope written from the line items, which the owner reviews, adjusts and sends.
  6. Sent quotes land in a list with their status, so follow-ups happen and you can see which elements you win and lose on.
StepHow it works nowWith the flow
MeasuringSketch in a notebookLine items with areas, lengths and photos
Site conditionsRemembered laterAsked for on every visit
PricingRebuilt each time from memoryYour own build-up rates, applied the same way
MaterialsRing the merchantCurrent price list feeds the quote
Writing upSunday evening in WordDraft ready to check and send

If you already use job software that holds quotes, such as Jobber or a similar tool, we feed the finished quote into it rather than building a second place for customers to live.

What quoting looks like afterwards

The visit ends with the survey complete. Back at the van, the draft is already priced, and the owner spends their time checking the judgement calls: is that wall really a two day job, does this customer want the premium slabs. Other people in the business can prepare quotes from someone else's survey, because the survey is readable. And when a crew finishes a job, you can compare the hours they took with what the quote allowed, which tightens the next price.

Does this sound like your spring?

  • Customers ring to ask where their quote is.
  • Only one or two people in the business can price a garden build.
  • You price in the evenings or at weekends.
  • Two similar jobs have been quoted at noticeably different prices.
  • You have lost work because a competitor quoted first.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will the software decide our prices?

No. It applies the rates and build-ups you give it, consistently. The owner still reviews every quote and changes anything that needs judgement.

Can it work with design drawings as well as site measurements?

Yes. Where a designer has produced a plan, the areas and lengths can be entered from the drawing instead of the tape, and the pricing works the same way.

Do we need to replace our job management software?

Usually not. If it handles customers, jobs and invoices well, we build the survey and pricing around it and pass the quote across.

What affects the cost of building this?

How many kinds of work you price, how complicated your build-ups are, and whether the quote needs to reach other systems such as your accounts or job software.

What do you need from us to start?

A handful of recent quotes, including one you think was underpriced, your current rates as you understand them, and a walk through of how a site visit goes.

Keep reading

More on Problems We Solve

Start here

Tell us where the landscaping admin catches up with you

Describe your crews, the mix of design and build and maintenance work, and what you run the business on today. We will tell you what we would build and what we would leave alone, and if a setting in your current job software would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →