How Can We See Which Garden Build Jobs Take More Crew Days Than We Quoted, and Why?

Landscaping jobs overrun on crew days and nobody sees it until the margin is gone. We build job costing that compares quoted and actual days by element, live.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Overruns stay hidden because the quote says six days, the crew records hours on a paper sheet, and nobody compares the two until the job is over, if ever. We build job costing that splits the quote into elements, has the crew log time and materials against each element from their phone, and shows the owner live, element by element, where a job is running over and what it is doing to the margin.

The job that felt fine

The crew was on the Wetherby job for nine days. It was quoted at six and a half. Everyone knew it was running over, because the owner kept hearing about the clay and the tree roots, but nobody knew by how much or which part of the job was the problem. The customer was delighted. The job made very little.

The next quote for a similar garden went out at six and a half days again, because there was no record telling anyone otherwise.

Why you cannot see it

Most landscaping businesses do know roughly which jobs went badly. What they lack is the detail: whether it was the dig out, the walling, the paving or the planting that took longer, and whether that happens every time or only on clay. Without that detail, the quote rates never improve.

  • Quotes hold a total, or a few lines, not the labour allowed for each element.
  • Crew time is recorded as hours per day per person, not against parts of the job.
  • Materials used are not compared with what the quote allowed.
  • Job reviews happen, if at all, when the final invoice goes out.
  • Site conditions that cause overruns, such as clay, roots and access, are not recorded.

What hidden overruns do to the business

An overrun on one job moves the start date of every job after it, so customers down the list wait longer. Crew days spent on overruns are days not billed elsewhere. And when quotes keep using the same labour allowances, the same elements keep overrunning, so the problem is priced into every new job. The business can be busy all year and still wonder where the profit went.

The job costing we build

  1. The accepted quote is split into elements, such as excavation, sub-base, walling, paving, turf and planting, each with the crew days and materials it allowed.
  2. The crew leader logs the day on their phone against the elements worked on: roughly how much time went on each, plus materials used from the van or yard.
  3. A short list of reasons can be tapped when something takes longer: ground conditions, access, weather, customer changes, waiting for materials.
  4. The owner's screen shows each live job with quoted and actual days per element, and flags any that are running over while there is still time to act.
  5. When the job closes, a one page summary compares the whole job with the quote.
  6. Across many jobs, the system shows which elements usually overrun and by how much, and in which conditions, so the next quote uses better numbers.
ElementQuote holdsCrew records
ExcavationDays allowed, spoil volumeDays spent, skips used, ground type
Sub-baseDays, tonnageDays, tonnage delivered
WallingDays per metreDays, blocks used
PavingDays per square metreDays, slabs and bedding used
Planting and turfDays, plants and rollsDays, items used

The breakdown is kept rough on purpose. Crews will not record time to the quarter hour, and they do not need to for the numbers to be useful.

What you learn by the end of the season

During a job, the owner sees an overrun on day four instead of day nine, and can talk to the customer about ground conditions or move people around. After a season, you have evidence rather than a feeling: perhaps walling on clay sites takes consistently longer than you allow, or small jobs with poor access cost more than their size suggests. That evidence goes straight back into your quoting rates.

Does this sound familiar?

  • You know some jobs lost money but not which part of the job caused it.
  • Crew time is recorded per day, not per job element.
  • Quotes use the same labour allowances they did years ago.
  • Overruns are discovered after the final invoice.
  • Busy seasons do not produce the profit you expected.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will crews accept logging time per element?

They usually will if it takes seconds and uses their words. We design the phone screen with the crew leaders, not for them.

Can we use this if our quotes are in a spreadsheet?

Yes. We can read your quote structure and turn it into elements without changing how you price.

Does it replace our payroll timesheets?

It can feed them. Hours recorded per job can be totalled per person for payroll, so crews do not record time twice.

What affects the cost?

The number of element types, how your quotes are held today, and whether it links to payroll, accounts or job software.

What do you need from us?

A few closed jobs with their quotes, including ones you think overran, and time sheets if you kept them.

Keep reading

More on Problems We Solve

Start here

Tell us where the landscaping admin catches up with you

Describe your crews, the mix of design and build and maintenance work, and what you run the business on today. We will tell you what we would build and what we would leave alone, and if a setting in your current job software would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →