Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Get Accurate Crew Hours for Payroll When Landscapers Work Across Several Sites a Day?
Problems We Solve

How Do We Get Accurate Crew Hours for Payroll When Landscapers Work Across Several Sites a Day?

Landscaping crew hours are pieced together from paper sheets and texts every payday. We build phone timesheets with travel and rain rules that feed payroll.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Crew payroll hours go wrong because landscapers move between sites, the yard and the tip all day, and the rules for travel, rain stops and overtime live in someone's head. We build phone timesheets that record start, finish and moves between sites, apply your own pay rules for travel, wet time and overtime, and send approved hours straight to your payroll software.

Thursday night, payroll is due

The office has a pile of paper timesheets, some filled in, some half filled, one missing. One crew member texted his hours. Another says he did a Saturday that nobody else remembers. The crew leader says the rain stop on Tuesday was two hours, not three. The overtime rule depends on whether the extra hour was travel or work, and nobody wrote that down either.

The office manager spends the evening reconciling it all, then keys the hours into payroll. On Monday two people query their pay.

Why landscaping hours are so messy

A crew might start at the yard, load up, drive to a site, move to a second site, go to the tip, and drop kit back. Maintenance crews might visit eight sites in a day. Different parts of that day may be paid differently under your own rules, and the weather adds another layer.

  • Times are written at the end of the week from memory.
  • Travel, yard time and site time are not separated.
  • Rain stops and early finishes are handled case by case.
  • Overtime rules are applied by the person keying the hours.
  • Hours are keyed into payroll by hand.

How travel, wet time and overtime should be paid is decided by your contracts of employment and your payroll adviser. The system applies the rules you give it and does not decide them.

What messy hours cost

Overpayments slip through and are hard to recover. Underpayments cause bad feeling and, if repeated, can become more serious. The office spends hours every pay period on reconciliation. And because hours are not tied to jobs, the labour cost of each job and contract is a guess.

The phone timesheets we build

  1. Each crew member, or the crew leader for the whole crew, taps in at the start of the day, and records moves between the yard, sites and the tip with a couple of taps.
  2. Each block of time is tagged as site work, travel, yard, or weather stop, and linked to the job or contract where relevant.
  3. Your pay rules are written into the system: how travel counts, what happens on wet days, when overtime starts, weekend rates.
  4. At the end of the week, the crew leader and the office review a summary for each person, with anything unusual flagged, such as a missing finish time.
  5. Approved hours are sent to your payroll software, such as Xero Payroll, Sage or BrightPay where an import or API is available, or exported in the format your bureau wants.
  6. The same time data feeds job costing, so labour on each job and contract is known.
Part of the dayHow it is recordedPaid according to
Yard loadingTapped as yard timeYour rule for yard time
Driving between sitesTapped as travelYour travel rule
Work on siteTapped against the jobStandard or overtime rate
Rain stopTapped as weather stopYour wet time rule
Tip runTapped as travel or yardAs you decide

Payday without the pile

The office reviews flagged exceptions instead of rebuilding every timesheet. Pay rules are applied the same way for everyone, which cuts the queries. Crew members can see their own hours during the week, so problems are raised early. And the labour cost of each job is recorded, not estimated.

Is payroll week a scramble?

  • Timesheets are paper, texts or memory.
  • Pay queries come up most weeks.
  • Travel and rain stops are handled inconsistently.
  • Hours are keyed into payroll by hand.
  • You cannot say what labour a particular job cost.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will the system decide how we pay travel time?

No. It applies the rules you set with your payroll adviser. If a rule changes, you change it once and it applies from then on.

Does it track staff location all day?

It can record location when someone taps in at a site, if you choose. Whether and how you use that is your policy decision.

Which payroll software does it work with?

Any that accepts an import or has an API, including common UK packages. We confirm against your software before building.

What affects the cost?

The number of staff, how complex your pay rules are, and which payroll and job systems it connects to.

What do you need from us?

Your pay rules as you apply them now, a few weeks of timesheets, and the payroll software you use.

Keep reading

More on Problems We Solve

Start here

Tell us where the landscaping admin catches up with you

Describe your crews, the mix of design and build and maintenance work, and what you run the business on today. We will tell you what we would build and what we would leave alone, and if a setting in your current job software would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →