Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop Kitchen Orders Leaving Out Plinths, Fillers, End Panels and Cornice?
Problems We Solve

How Do We Stop Kitchen Orders Leaving Out Plinths, Fillers, End Panels and Cornice?

Kitchen fitters find plinths, fillers and end panels missing because they never made it onto the order. We build an order check that catches missing sundries.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Kitchen orders leave out plinths, fillers, end panels, cornice and fixings because the design software's schedule does not always generate them, and the order is typed up from it by hand. We build an order check that reads the design schedule, applies your rules for what every run, tall unit and corner needs, lists anything that looks missing and makes the designer confirm or add it before the order goes to the supplier.

Carcasses complete, finishing short

The units are in and look good. Then the fitter goes to finish: the plinth runs are short by one length, there is no filler for the gap next to the wall, the tall housing has a bare side because the end panel was never ordered, and there is no cornice for the wall units. None of it is expensive, but each missing part is a separate order, a separate delivery and a return visit to finish.

Where sundries fall out

Design software is very good at carcasses and doors. How it handles finishing pieces varies with the software, the supplier catalogue and how the designer drew the plan. Many showrooms then retype the schedule into a supplier order form, and finishing pieces are the easiest lines to miss.

  • Plinth lengths are calculated for straight runs and miss returns and islands.
  • Fillers are drawn as gaps but not added as items.
  • End panels on exposed sides are added visually but not always scheduled.
  • Cornice, pelmet and light rail are left off when the design is revised.
  • Fixing kits, plinth clips and panel brackets are assumed to come with the units.

The cost of small missing parts

Finishing parts are cheap but the return visit is not. The customer sees an unfinished kitchen at the point they thought it was done. Some suppliers charge delivery on small orders, and the replacement often comes from a different batch, so a panel or plinth can be a slightly different shade from the rest. The balance payment waits for the finish.

An order check with your rules

  1. The schedule is read from your design software's export, rather than retyped.
  2. Your rules for finishing pieces are set up with your designers and fitters, such as every exposed tall unit side needs an end panel, every run needs plinth to cover its length including returns, and every wall unit run needs cornice if the design style uses it.
  3. The check compares the schedule with the rules and lists anything that seems missing or short, with the reason.
  4. The designer confirms each flag, adding the part or marking why it is not needed, before the order is released.
  5. Rules are updated when fitters report a new kind of shortage, so the check improves over time.
  6. The approved order is sent to the supplier in their format, with no retyping.
RuleWhat it catches
Exposed tall side needs an end panelBare sides on housings and larders
Plinth covers run length plus returnsShort plinth on L-shapes and islands
Gap to wall needs a fillerFillers drawn but not ordered
Wall units need cornice in this styleMissing cornice after a revision
Hinged doors need soft close fittingMissing hardware for some ranges

The rules come from your fitters and designers. We turn them into checks and do not invent requirements your kitchens do not have.

After the check goes live

Orders reach the supplier complete more often. Fitters stop finishing kitchens with gaps. Return visits for a single plinth or panel become rare. And designers learn what is commonly missed, because the check tells them each time.

The check also helps new designers. A designer who has joined from another showroom, or is new to one of your supplier ranges, learns your finishing rules through the flags rather than through a fitter's phone call from site. The knowledge that used to sit with your most experienced fitter becomes something every order benefits from.

Signs your orders need a check

  • Fitters regularly report missing plinths, fillers or panels.
  • Orders are retyped from the design into a supplier form.
  • Small follow-up orders to suppliers are routine.
  • Kitchens wait for finishing pieces before the balance is paid.
  • Mismatched panel shades have appeared on finished kitchens.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Which design software does this work with?

Any that exports a schedule of items, usually as CSV, XML or a report. We look at what yours produces before we promise anything.

Will it slow designers down?

It adds a short review of flagged items before ordering, which takes less time than the follow-up order it prevents.

Can it handle different suppliers' ranges?

Yes. Rules can be set per range where finishing pieces differ.

What affects the cost?

What your design software exports, how many supplier formats orders go out in, and how many rules you want to start with.

Keep reading

More on Problems We Solve

Start here

Tell us where your kitchen and bathroom jobs slip

Describe how a job moves from enquiry to handover in your business, which design and accounts software you use, and where things get lost. We will tell you what we would build and what we would leave alone, and if a better habit or a setting in your existing software would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →