How Do We Stop One Kitchen Fit Overrunning and Knocking Out the Next Three Jobs?

Kitchen fitters see one overrun knock every later job out of the diary. We build a fitting planner that shows the ripple and reshuffles teams and dates.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

When one kitchen fit overruns, every later job for that team moves, but the diary only shows start dates, so the knock-on is worked out by phone. We build a fitting planner that holds each job's expected duration and dependencies, shows the ripple as soon as a fit runs over, suggests which team could take which job, and tells affected customers and suppliers before the old dates pass.

Wednesday's news, Monday's problem

Team two is on a large kitchen with an island. On Wednesday the fitter rings: the floor under the island is not level, the plasterer has to come back, and they will be there until Tuesday. The diary shows them starting a bathroom on Monday and another kitchen the week after. The Monday customer has taken time off work. Their units are being delivered on Friday. The worktop templater is booked for the kitchen after.

The office spends Thursday phoning people and moving boxes on a wall planner. Something always gets missed.

Why one overrun spreads

The fitting diary in most businesses is a list of start dates per team, on a whiteboard, a paper planner or a shared calendar. It does not show how long each job is expected to take, what has been booked around it, or which other team has a gap.

  • Job durations are in the fitters' heads, not the diary.
  • Deliveries, templating and trades are booked separately from the fitting slot.
  • There is no view of which team has capacity to take a moved job.
  • Customers learn about changes when someone gets round to calling them.
  • Skills differ between teams, and the diary does not show who can fit what.

What a messy reshuffle costs

Customers who have booked time off or arranged to live without a kitchen are let down. Deliveries arrive at houses where nobody is ready. Trades are paid for visits that cannot happen. The office loses a day to rearranging, and the fitting teams are left unsure of their next week.

A fitting planner that shows the ripple

  1. Each job is scheduled as a block with an expected number of days, not just a start date, based on the job type and your fitters' estimate.
  2. Bookings that hang off the fit, such as unit and appliance deliveries, templating, trades and skip hire, are linked to it.
  3. When a fitter reports an overrun from their phone, the planner shows every later job and booking that moves as a result.
  4. It highlights teams with a gap who have the skills for the job being moved, so you can choose to swap rather than delay.
  5. Once you accept a change, messages to customers, suppliers and trades are drafted with the new dates, for the office to check and send.
  6. The wall planner view stays, on a screen in the office, but now it updates itself.
After an overrunDiary with start datesPlanner with durations
Seeing the knock-onWork it out on the phoneShown immediately
Finding another teamAsk aroundTeams with gaps and skills listed
Moving deliveriesRemembered, or notLinked bookings flagged
Telling customersWhen someone has timeMessages drafted with new dates

The planner does not decide how to reshuffle. It shows the options and the consequences, and your office makes the call.

How the office runs after

An overrun still happens. What changes is that its effects are clear within minutes, the best option is visible, and everyone affected hears about it the same day. Fitting teams see their next few weeks on their phones and trust them. Customers get warnings, not surprises.

The planner also changes how you quote durations. Because every overrun is recorded with a reason, you can see which job types, layouts or floors tend to take longer than expected. Quotes and diary blocks for those jobs can be set more realistically, which means fewer overruns in the first place and fewer difficult calls to customers who had planned around a date.

Is your diary this fragile?

  • One overrun takes a day of phone calls to sort out.
  • The diary shows start dates but not how long jobs take.
  • Deliveries have arrived for jobs that had been moved.
  • Customers have been told about a delay the day before.
  • Only one person truly understands the fitting schedule.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can we keep our wall planner?

Yes, in spirit. The planner has a wall view designed to go on an office screen, and it updates as jobs move.

Do fitters need to use an app?

They need a simple way to report progress and overruns, which works on any phone. It takes less time than the phone call it replaces.

Does it work with Google or Microsoft calendars?

Yes. Team schedules can be shared into the calendars people already use.

What affects the cost?

The number of teams, how many linked bookings you want tracked, and whether it connects to existing job or ordering systems.

Keep reading

More on Problems We Solve

Start here

Tell us where your kitchen and bathroom jobs slip

Describe how a job moves from enquiry to handover in your business, which design and accounts software you use, and where things get lost. We will tell you what we would build and what we would leave alone, and if a better habit or a setting in your existing software would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →