Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Which Factory Samples Were Approved, With What Changes, Before Production Starts?
Problems We Solve

How Do We Keep Track of Which Factory Samples Were Approved, With What Changes, Before Production Starts?

Importers approve factory samples by email and lose the record before production. We build a sample tracker with photos, comments and signed-off versions.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Sample approvals get lost because rounds of samples, photos and comments travel by email and chat, and the approved version is whatever someone remembers. We build a sample tracker that logs each round per product and factory, holds photos, measurements and comments, records the signed-off version, and sends it to the factory and your inspection company as the reference for production.

Which sample did we approve?

You are developing a new product with a factory. The first sample was wrong in colour. The second had the right colour but the stitching was weak. The third was nearly right, and someone approved it by email with 'OK, but make the handle a bit thicker'. A fourth sample arrived by courier and is in a box in the office.

Production has started. The factory says the approved version was the third sample. Your buyer thought it was the fourth. The inspection company is checking against a spec sheet from before the second round. When the goods arrive, they match none of them exactly.

Why sample history goes missing

Sampling happens over weeks or months, across several people and channels. Comments are made in email, chat, calls and on the physical sample itself. Photos are on phones. The approved sample might be in your office or at the factory, with a label or without. There is no single record that says 'this is the approved version, with these notes'.

  • Sample rounds tracked in email threads.
  • Photos and comments scattered across devices.
  • Approval given informally, sometimes with conditions.
  • Inspection companies working from old specifications.
  • Physical golden samples not labelled or logged.

What that confusion costs

Production that does not match what you expected means rework, disputes with the factory, and stock you may struggle to sell. Arguments about what was approved are hard to win without a clear record. New products launch late because sample rounds drag on. And the knowledge of why a spec was changed disappears with the person who asked for it.

Repeat orders suffer too. When you reorder a product a year later, the factory may work from its own records, which include changes you never approved or leave out ones you did. If your side has no clear approved version to point to, the second production run can drift from the first without anyone noticing until customers do.

The sample tracker we build

  1. Each new product or change has a sample record, linked to the factory and the specification.
  2. Each round is logged when it arrives: photos, measurements, comments from each reviewer, and a result (rejected, approved with changes, approved).
  3. Comments are tied to photos, so 'handle thicker' points at the handle.
  4. Approval is a deliberate step by a named person, and conditions are written as changes to the specification, not a line in an email.
  5. The approved specification, with photos and a golden sample reference, is sent to the factory and to your inspection company as the production reference.
  6. Physical samples are labelled with a code linking them to the record, so the box in the office means something.
Email and chatSample tracker
Sample roundsScattered threadsLogged per product
CommentsSeparate from photosPinned to photos
ApprovalInformalNamed person, recorded version
Inspection referenceWhatever spec they haveApproved version sent to them

How development runs after

Everyone looks at the same record of a product's development. The factory knows exactly what was approved. The inspection company checks against the same version. When goods arrive, you can compare them with a clear approved reference, and disputes are shorter because the record is clear.

Is this your development process?

  • You have argued with a factory about which sample was approved.
  • Sample comments are in email and chat.
  • Inspection companies work from old specs.
  • Golden samples are in boxes without labels.
  • New products are delayed by long sample rounds.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can factories use the tracker directly?

Yes, if you want them to. They can upload photos and see comments through a supplier login.

Does it replace our product lifecycle software?

If you already use PLM software for this, we would work with it. The tracker suits businesses that do not.

Can it hold technical drawings?

Yes. Drawings and specification documents are attached to each version.

What do you need to start?

A few products you are developing now, with the email threads, to see how your sampling actually works.

Keep reading

More on Problems We Solve

Start here

Tell us where the import paperwork piles up

Describe what you import, who your forwarder and broker are, and what you track shipments and costs in today. We will tell you what we would build, what we would leave to your forwarder's own tools, and if a smaller change would do, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →