Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Every Truck and Trailer Inspection Date Without the Wall Planner?
Problems We Solve

How Do We Keep Track of Every Truck and Trailer Inspection Date Without the Wall Planner?

Haulage firms track inspection and MOT dates for trucks and trailers on wall planners. We build a schedule that plans each due date around the loads booked.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Inspection dates slip because the schedule lives on a wall planner or spreadsheet that does not know which trucks are booked on work that week, and trailers move between depots. We build a maintenance schedule that holds each vehicle's and trailer's due dates at the intervals your transport manager sets, shows them to planners alongside the plan, books the slot with your workshop or contractor, and records that it was done.

The wall planner in the transport office

Safety inspections, MOTs, tachograph calibrations, tail-lift examinations, fridge unit services. Each has its own interval, each truck and trailer has its own dates, and they are all on a year planner with coloured stickers, or a spreadsheet the fleet engineer updates when they remember.

On Thursday a planner puts a tractor unit on a three-day job to Scotland. Nobody spots that it was due in for its inspection on Friday. The workshop slot is wasted, the inspection slips, and the fleet engineer finds out on Monday.

Why the dates and the plan never meet

The maintenance schedule and the transport plan are kept by different people, in different places, for different reasons. The schedule is right; the plan is right; but nobody sees both at once.

  • Due dates are on a wall chart or spreadsheet, not in the planning system.
  • Trailers move between depots and customer sites, so booking them in is harder than booking trucks.
  • Workshop or contractor slots are booked by phone and not linked to the vehicle record.
  • Completed inspection sheets come back on paper and are filed separately.
  • Different items (tail-lifts, fridges, calibrations) are tracked by different people.

What slipping dates cost

A missed slot means rebooking, often at short notice and at a less convenient time. A truck that goes over its interval may have to be taken off work until it is seen, which costs a load. Paperwork that does not show inspections happening when planned is something your transport manager will have to account for. And the fleet engineer spends time chasing rather than managing the fleet. The intervals themselves are for your transport manager and your operator licence undertakings, not for us.

The maintenance schedule we build

  1. Every truck and trailer is listed with its inspection types and the intervals your transport manager sets. Last completed dates are taken from your existing records.
  2. Due dates appear in the planning view, so a planner putting a vehicle on work can see it is due in, and choose another.
  3. Upcoming inspections are listed weeks ahead. The fleet engineer books them with your workshop or contractor, or sends a booking request from the system, and the slot is fixed to the vehicle.
  4. Planners are warned if they allocate a vehicle or trailer across a booked slot.
  5. When the inspection is done, the sheet is uploaded (a photo is fine) and the date recorded, which rolls the next due date forward.
  6. A report shows the status across the fleet: done, booked, due soon, overdue, with the paperwork attached.
JobWall plannerSchedule
Knowing what is dueStickers and memoryListed ahead by type and vehicle
Planning around itPlanner does not see itShown and warned in the plan
Booking the workshopPhone call, noted on paperSlot held against the vehicle
Recording completionSheet in a fileUploaded, next date rolls forward

What changes for the fleet engineer

The fleet engineer manages a list rather than a wall. Planners route vehicles around their slots because they can see them. Trailers are pulled back to the depot in time, because the schedule flags them early. And when anyone asks to see maintenance records for a vehicle, they are on one page with the sheets attached.

If your workshop already runs fleet maintenance software, we connect to it rather than duplicate it, and put the due dates where the planners will see them.

Checklist

  • Inspection dates live on a wall planner or spreadsheet.
  • Vehicles have been planned onto work across a workshop slot.
  • Trailers are hard to get back for inspections.
  • Completed sheets are filed on paper only.
  • Only the fleet engineer knows what is due.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do you set the inspection intervals?

No. Your transport manager sets them, in line with your own obligations and advice. The schedule applies them.

Does it replace our maintenance contractor's system?

No. We can take their completion records by import or API where available, or from uploaded sheets.

Can it cover tail-lifts and fridge units too?

Yes. Any item with a due date can be tracked per vehicle or trailer.

Will planners be stopped from using a vehicle that is due?

They are warned by default. You decide whether that should be a block.

What do you need from us?

Your vehicle and trailer list, current due dates, and how bookings with the workshop work.

Keep reading

More on Problems We Solve

Start here

Tell us which haulage records live in someone's head

Describe your fleet, your drivers, and the spreadsheets and systems that hold the records your transport office depends on. We will tell you what we would build and what we would leave alone, and if a setting in the software you already have would do it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →