  3. How Do We Stop Spoil Heaps Sitting on Site Because the Soil Classification Results Are Stuck Between the Lab, the Tip and Our Office?
Problems We Solve

How Do We Stop Spoil Heaps Sitting on Site Because the Soil Classification Results Are Stuck Between the Lab, the Tip and Our Office?

Groundworks spoil sits on site while lab results and tip acceptance go back and forth by email. We build tracking from sampling to results to tip acceptance.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Spoil waits on site because classifying it needs samples, a lab, a report and a tip's acceptance, and each step is handled by email by different people. We build a disposal tracker that records each stockpile and its samples, follows the lab results in, sends them to the tips you use, records acceptance and the price basis, and tells the site which material can go where.

A spoil heap that cannot go anywhere

The dig for a drainage run on a brownfield site produced material that looks different from the rest. It needs classifying before it can go to a tip. Your contracts manager arranges samples. The lab sends the results to the consultant, who forwards them to your office. The tip wants them in their format and asks a question about one determinand. By the time the tip accepts, the heap has sat in the way of the next dig for over a week.

On one job that is a nuisance. On a site with several stockpiles and material types, it becomes a programme problem.

Why classification is slow

Classification involves several parties, each doing their own step well: whoever takes the samples, the lab, often an environmental consultant, the tip, and your office. Nobody holds the whole chain, so the handovers between them are where the time goes. The site cannot see where things are, so it cannot plan around it.

  • Samples are taken without a clear record of which stockpile they came from.
  • Lab results go to one person and are forwarded by email.
  • Each tip wants the information in its own format.
  • Acceptance and price are agreed by phone and not recorded.
  • Site does not know which stockpile can go where.

What waiting spoil costs

Stockpiles in the way slow the dig and block access for other trades. Plant sits idle or double-handles material. Wagons are booked and cancelled. The wrong material risks going to the wrong tip because the site did not know which heap was which. And the cost of disposal is uncertain until acceptance comes through, which makes it hard to tell the main contractor what extra disposal will cost.

The disposal tracker we build

  1. Each stockpile is recorded on a phone with its location on the site plan, a photo, the area it was dug from and an estimated volume.
  2. Samples are linked to their stockpile when they are taken, with a reference the lab will use.
  3. Lab results are read from the report when they arrive, by email or the lab's portal, and filed against the stockpile.
  4. The results pack is sent to the tips you use, in the format each wants, from one place.
  5. Tip acceptance, the material description it was accepted under and the price basis are recorded against the stockpile.
  6. The site sees, on the plan, which stockpiles are cleared to go and to which tip, and wagons are booked against that.
  7. Waiting times at each step are visible to your contracts manager, so a stuck step is chased.
StockpileStepWaiting on
SP1, drainage run northAcceptedNothing, cleared to go
SP2, basement digResults receivedTip acceptance
SP3, made ground by boundarySamples takenLab
SP4, topsoilKeep on siteReuse in landscaping

How material is classified, and what your obligations are, is for your environmental consultant and advisers. We track the process and the paperwork; we do not interpret results.

A site that knows where each heap goes

Every stockpile has a status the site can see. Lab results and tip acceptances are in one place, not in forwarded emails. Wagons are booked only for material that is cleared, to the tip that accepted it. Your contracts manager can tell the main contractor what extra disposal is likely to cost, with the evidence behind it, sooner.

Does spoil wait on your sites?

  • Stockpiles sit on site waiting for results or acceptance.
  • Lab results are forwarded between several people by email.
  • Site does not know which heap can go where.
  • Tip acceptance is agreed by phone and not recorded.
  • Disposal costs are unclear until the end.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it interpret the lab results?

No. Results are filed and passed on. Interpretation is for your environmental consultant and the tip.

Can it work with our lab's portal?

Where the lab offers results by portal export or email, we read them from there.

Does it link to muck-away records?

Yes. Loads leaving site can be linked to the stockpile and the tip that accepted it.

Can the main contractor see it?

If you choose. A shared view can help when disposal costs need agreeing.

What affects the cost?

The number of sites and stockpiles, the labs and tips you use, and whether you want the load log connected.

Keep reading

More on Problems We Solve

Start here

Tell us where your groundworks jobs leak time and money

Describe the problem, how your gangs, plant and office work today, and which main contractors or housebuilders you work for. We will tell you what we would build and what we would not, and if a spreadsheet or your existing software would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.