How Do We Keep Track of Where Every Sewer on Every Site Is in the Water Company's Adoption Process?

Groundworks firms lose track of sewer adoption stages across sites and water companies. We build an adoption tracker by site with stages, evidence and dates.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Sewer adoptions drift because each site's agreement has its own stages, inspections, surveys, snag lists and maintenance period, tracked by different people and the water company's own inspector. We build an adoption tracker per site that lists the stages your agreement and the water company set, records inspections, CCTV surveys, remedial works and certificates against each, reminds you of dates such as the end of the maintenance period, and shows the housebuilder where things stand.

Five sites, three water companies, one spreadsheet

Your firm lays sewers on housing sites that will be adopted by the water company under an adoption agreement arranged by the developer. Each site has inspections during construction, a CCTV survey before the maintenance period, snag lists from the water company's inspector, remedial works, and eventually adoption. Different water companies do it differently. Your contracts manager keeps a spreadsheet that is correct for the sites he is closest to.

Then a housebuilder asks why a site finished two years ago still is not adopted, and the answer is buried in emails.

Why adoptions stall

Adoption runs over years, well past the time your gang is on site. Stages depend on the water company's inspector, the developer, and your remedial works, and nobody owns the whole process. The details of each agreement are held by the developer, not by you, so you often find out about a requirement late.

  • Adoption stages differ by water company and agreement.
  • Inspection and snag reports arrive by email to different people.
  • CCTV survey reports are PDFs that are hard to track.
  • Remedial works are raised and done without a closed-out record.
  • Maintenance period dates are not tracked by anyone in particular.

What stalled adoptions cost

Money held back by housebuilders until adoption, depending on your subcontract. Remedial work done years later, when gangs and materials have to be brought back. Housebuilders who are frustrated with slow adoptions choose other groundworkers. And staff time spent every year re-establishing where each site is. What your agreements and subcontracts require is for your contracts manager and advisers; we deal with knowing where you are.

The adoption tracker we build

  1. Each site is set up with the adopting water company, the developer, the agreement reference and the stages that apply, from a template per water company that you can adjust.
  2. Inspections are recorded as they happen, with the inspector's report filed against the stage and the sewer lengths it covers.
  3. CCTV survey reports are read for the defects they list, which become remedial items against each length or manhole.
  4. Remedial works are assigned to a gang, completed with photos and resurveyed where needed, then closed.
  5. Key dates, such as the start and end of the maintenance period, are tracked and you are reminded ahead of them.
  6. Certificates and correspondence are filed against the stage.
  7. Each site has a status view you can share with the housebuilder: which stages are done, what is outstanding, who it is waiting on.
SiteStageWaiting on
Phase 2, north estateMaintenance periodEnd date approaching
Phase 1, river sitePre-adoption CCTVRemedial items from survey
Phase 3, north estateConstruction inspectionsInspector visit
Hill road siteAdoptionDeveloper's paperwork

Adoptions that keep moving

Every site's adoption position is on one screen, with what it is waiting on. Remedial items from surveys become a list the gangs can work through rather than a PDF in an inbox. Maintenance periods do not end with nobody ready. Housebuilders get clear answers when they ask, and you can show them the waiting is not always yours.

When a contracts manager leaves, the adoption history of their sites stays with you.

Are your sewer adoptions tracked like this?

  • One person knows the adoption status of each site.
  • CCTV survey defects are not tracked to closure.
  • Maintenance period dates catch you out.
  • Housebuilders ask about adoption and you have to look it up.
  • Old sites still are not adopted years later.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it follow each water company's process?

Each water company's stages are set up as a template that you can adjust. We do not claim to know every company's requirements; your contracts manager confirms them.

Can it read CCTV survey reports?

It reads common report formats to list defects by length and manhole. A person checks the list.

Does it link to our as-laid records?

Yes, if you use them, so lengths and manholes match between the two.

Can the developer update it?

If you want, the developer can add their paperwork stages through a link.

What affects the cost?

The number of sites and water companies, the report formats, and whether you want the as-laid records connected.

Keep reading

More on Problems We Solve

Start here

Tell us where your groundworks jobs leak time and money

Describe the problem, how your gangs, plant and office work today, and which main contractors or housebuilders you work for. We will tell you what we would build and what we would not, and if a spreadsheet or your existing software would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →