  3. How Do We Stop Gangs and Machines Standing Because the Site Engineer Did Not Know They Needed Setting Out Today?
Problems We Solve

How Do We Stop Gangs and Machines Standing Because the Site Engineer Did Not Know They Needed Setting Out Today?

Groundworks gangs stand waiting for setting out while the engineer is on another site. We build a setting-out request queue so the engineer plans days ahead.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Gangs wait for setting out because requests are made by phone the same morning, the engineer is covering several sites, and nobody sees the week's demand in advance. We build a setting-out request queue where gangers request lines and levels ahead from their phones, the engineer sees requests across all sites by date and priority, plans routes between sites, and marks each done with a record of what was set out.

Seven o'clock, no pegs

Your foundation gang is ready to dig plots 30 to 36. The machine is warm. There are no pegs. The engineer is on another site setting out a road, because the road gang rang him first. He will be over after lunch. Your ganger puts the gang on tidying and odd jobs until then, which is the best that can be done.

The engineer is not the problem. He is covering three sites with requests that arrive by phone the morning they are needed.

Why setting out causes standing time

Setting out demand is predictable a few days ahead, because it follows the programme. But requests are made when gangers realise they need it, usually the morning of, or the evening before. The engineer has no view across sites, so they respond to whoever rings first rather than to what matters most.

  • Requests are made by phone, often on the morning they are needed.
  • The engineer cannot see the week's demand across sites.
  • Priorities are set by who rings first.
  • Travel between sites is not planned around requests.
  • What was set out, and to which drawing, is not recorded.

What standing gangs cost

Gang and machine time lost while waiting, every time. Pressure on engineers that leads to rushed setting out and mistakes. Arguments between gangers about who gets the engineer first. And no record of what was set out, from which drawing revision, which matters when something is later found in the wrong place.

The request queue we build

  1. Gangers raise setting-out requests on a phone: site, plots or area, what is needed, such as foundation lines, drainage offsets, kerb lines or levels, and when.
  2. Requests are prompted from the programme too, so upcoming work shows as a likely need before anyone asks.
  3. The engineer sees all requests across all sites by date and priority, on a phone or tablet, and plans their days.
  4. Requests needed the same day are flagged as urgent, and the contracts manager sees how often that happens.
  5. The engineer confirms a time to the ganger, so the gang can plan around it.
  6. When complete, the engineer records what was set out, the drawing and revision used, and a photo of the pegs or marks.
  7. Where there are several engineers, requests are shared between them by site and workload.
RequestSiteNeededEngineer's plan
Foundation lines, plots 30 to 36East siteTomorrow, first thingTomorrow, 7:00
Road kerb line and levelsNorth siteThursdayWednesday afternoon
Drainage offsets, run FEast siteFridayThursday, 8:00
Levels for slabWest siteTodayUrgent, after 11:00

Engineers ahead of the gangs

Setting out happens before gangs need it, because the engineer sees demand coming. Gangs stand less, and when they do, the reason is clear. The engineer's day is planned rather than reactive, which means fewer mistakes. And every piece of setting out has a record of the drawing revision it was set out to, which helps if a question comes up later.

Your contracts manager gets something too: a clear view of how much setting out each site needs and how often requests are last-minute. If one site keeps asking on the morning, that is a planning conversation with the ganger. If every site is waiting, it may be the case for another engineer or a GPS-guided machine, argued from your own records rather than a feeling.

Do your gangs wait for setting out?

  • Gangs stand waiting for the engineer.
  • Requests arrive by phone the morning they are needed.
  • The engineer covers several sites with no view of demand.
  • Gangers compete for the engineer's time.
  • There is no record of what was set out to which drawing.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it work with the main contractor's engineer?

If the main contractor sets out for you, their engineer can receive your requests through a link.

Can it read from our programme?

Where the programme is in a readable format, upcoming activities prompt requests automatically.

Does it record the drawing revision?

Yes. The engineer selects the drawing and revision, and the record keeps it.

Can gangers see where the engineer is?

They see the confirmed time for their request. Live location is only shown if your engineers agree.

What affects the cost?

The number of sites and engineers, whether we read from your programme, and how drawings are stored.

Keep reading

More on Problems We Solve

Start here

Tell us where your groundworks jobs leak time and money

Describe the problem, how your gangs, plant and office work today, and which main contractors or housebuilders you work for. We will tell you what we would build and what we would not, and if a spreadsheet or your existing software would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →