Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Know the Tonnes of Type 1 and Pipe Bedding We Are Invoiced for Actually Arrived on Our Site?
Problems We Solve

How Do We Know the Tonnes of Type 1 and Pipe Bedding We Are Invoiced for Actually Arrived on Our Site?

Groundworks firms pay quarry invoices for tonnes of stone they cannot tie to a site. We build a log that matches weighbridge tickets to jobs and invoices.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Quarry and merchant invoices for aggregates are hard to check because tickets arrive with tipper drivers, get lost, and the invoice lists tonnes by delivery ticket number. We build a delivery log where each tipper's weighbridge ticket is photographed on arrival, read for material and tonnes, matched to the order and job, and the monthly invoice is checked ticket by ticket, with the tonnes compared against what the job should use.

Twenty-tonne loads, but how many?

On a new road and plot drives you are bringing in Type 1 sub-base, 6F2 for a haul road and pipe bedding for the drainage gang. Several quarries and merchants deliver. The drivers hand a ticket to whoever signs. At month end the invoices list dozens of tickets. Some tickets are on the cabin spike, some are in a pocket, some have gone.

Your contracts manager has a feeling the tonnes are high for the area laid, but has no way to prove it and no time to try.

Why tonnes cannot be checked

Aggregate deliveries are frequent and routine, so nobody treats the ticket as important. Tickets are paper, sites are wet and dusty, and the office never sees them until the invoice. Some deliveries go to the wrong site, or are ordered for one job and tipped at another. And nobody compares the tonnes delivered with the quantity the job should need.

  • Weighbridge tickets are handed to whoever is nearest.
  • Tickets go missing before they reach the office.
  • Orders are placed by phone and not logged.
  • Tipped loads are not recorded against an area of the job.
  • Delivered tonnes are not compared with the quantity measured.

What unchecked aggregates cost

You pay for tonnes you cannot prove arrived at your site. Deliveries meant for one job are costed to another. Over-use from wasteful laying or thicker layers than designed goes unnoticed. And on jobs where extra sub-base is needed because of ground conditions, you have no clean record to support your claim to the main contractor.

The delivery log we build

  1. Orders are logged on a phone with supplier, material, tonnes, job and delivery date. The supplier gets the order in writing.
  2. Each arriving tipper is logged by photographing its weighbridge ticket. The ticket is read for ticket number, material, gross, tare and net tonnes, and vehicle.
  3. The person receiving the load taps where it was tipped, such as road sub-base, plot drives or drainage bedding.
  4. Tickets are matched to orders, and deliveries without an order, or orders without deliveries, are flagged.
  5. Supplier invoices are read and checked ticket by ticket. Tickets on the invoice that are not in the log are queried with the supplier.
  6. Tonnes delivered per area are compared with the quantity measured or designed for that area, and big differences are highlighted.
  7. Deliveries are costed to the job and activity in your job costing or accounts system.
CheckPaper ticketsDelivery log
Did this ticket arrive at our site?If the ticket survivedPhotographed on arrival
Which part of the job used it?Nobody knowsTipped area recorded
Does the invoice match?Ticket numbers compared by handChecked automatically
Are we using more than we should?Not checkedCompared with measured quantity

Tonnes you can account for

Every delivery has a photographed ticket, a job and an area. Invoices are checked before payment and queries have ticket numbers and photos attached. Your contracts manager can see where tonnes are going and whether layers are thicker than they should be. Extra stone needed because of ground conditions has a record the main contractor can follow.

Over a few jobs the log also shows which suppliers deliver short, which tickets arrive late, and how your delivered tonnes per square metre of road compare between sites and gangs. That is the kind of detail that makes a quarry account review a conversation based on your own figures.

Does this sound like your aggregate deliveries?

  • Weighbridge tickets are lost before they reach the office.
  • Quarry invoices are paid without checking every ticket.
  • Deliveries are sometimes costed to the wrong job.
  • You do not compare tonnes delivered with quantities laid.
  • Extra sub-base for soft ground is hard to evidence.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do quarries send electronic tickets?

Some do, by email or portal. Where they do, we read those and use the site photo as the arrival record.

Can drivers log the delivery?

They can, through a link on their phone, if your site cannot always spare someone. The ganger confirms.

What about recycled aggregates from our own crushing?

They can be logged the same way, with volume or tonnes estimated from loads.

Does it work for sand, pipe bedding and topsoil?

Yes. Any material delivered by tipper can be logged and matched.

What affects the cost?

The number of suppliers and sites, whether suppliers send electronic tickets, and your accounts system.

Keep reading

More on Problems We Solve

Start here

Tell us where your groundworks jobs leak time and money

Describe the problem, how your gangs, plant and office work today, and which main contractors or housebuilders you work for. We will tell you what we would build and what we would not, and if a spreadsheet or your existing software would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →