How Do We Get Paid for Relaying Kerbs, Replacing Covers and Jetting Drains Other Trades Damaged After We Finished?

Groundworks firms repair kerbs, covers and drains others damaged, then cannot recover the cost. We build a damage log with dated photos and recharge packs.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Damage by others goes unpaid because nobody records the finished condition, the damage is found weeks later, and the claim to the housebuilder or main contractor is a phone call with no evidence. We build a damage log where finished work is photographed on completion, damage is logged on a phone with located photos when found, repairs are recorded with time and materials, and a recharge pack is produced for the main contractor to pass on.

Kerbs you laid twice

You finished the kerbs and binder course on the estate road months ago. Since then scaffold wagons, brick deliveries and a telehandler have been up and down it. Kerbs are knocked out of line, a gully grate is cracked, a manhole cover is broken, and a length of foul drain is blocked with mortar and plaster washings. The housebuilder wants it all put right before the road adoption inspection.

Your gang does the work. When you ask to be paid for it, the housebuilder's site manager says it could have been your own plant, and anyway nobody told him at the time.

Why damage by others is so hard to recharge

The finished condition of your work is rarely recorded, so there is nothing to compare the damage with. Damage is found days or weeks after it happened, by which time the culprit could be anyone. Your gangers mention it to the site manager in passing, and the conversation is never written down. When the repair is done, the time and materials are lost in the day's other work.

  • Finished work is not photographed on completion.
  • Damage is reported verbally, if at all.
  • Repairs are done without a record of time and materials.
  • Recharges are raised long after, with no evidence.
  • The main contractor cannot pass on a charge they cannot support.

What unrecovered damage costs

Your gangs spend time repairing work you were already paid for once, and the cost comes out of your margin. On a long housing site the total over the life of the job can be large. Disputes about damage sour relationships with the site team you need to keep on side. And repairs rushed just before an adoption inspection disrupt the gangs you had planned for other work.

The damage log we build

  1. When a section of work is finished, such as a length of kerbs, a road, a run of drainage or a set of manholes, the ganger photographs it on a phone, tagged with location and date. That is the handed-over condition.
  2. Where drains are finished, a CCTV survey or a simple test result can be filed against the run as evidence of their state.
  3. When damage is found, anyone on your team logs it with located photos, a description and, where known, the cause, such as a delivery wagon or another trade's waste.
  4. The housebuilder's or main contractor's site manager is notified the same day by email with the photos, so they hear about it while it can still be investigated.
  5. Repairs are recorded with gang time, plant and materials, and after photos.
  6. A recharge pack for each item or each month shows the finished condition, the damage, the notification and the repair cost at your agreed rates.
  7. A running view shows damage by site, by cause and by recovered or not recovered.
ItemFinished conditionDamage loggedRecharge
Kerbs, plots 20 to 26Photographed on completionKerbs pushed out, wagon tracksPack sent, agreed
Manhole cover, road BPhotographed on completionCover crackedPack sent, queried
Foul run F4 to F5CCTV survey on completionBlocked with mortarPack sent, agreed

Whether a recharge is accepted depends on your subcontract and the main contractor's arrangements with other trades. We give you the evidence and the paperwork; the decision is theirs and yours.

Evidence at the moment it matters

The site manager hears about damage the day it is found, with photos, when they still have a chance to find out who caused it. Every recharge comes with a before, an after and a cost. Your contracts manager can see how much damage-by-others is costing on each site, and raise it with the main contractor as a pattern rather than one item at a time. Gangs stop redoing work for nothing.

The same finished-condition photos also help at adoption inspections, because they show the work was right when you left it.

Are you repairing other trades' damage for free?

  • Your kerbs, covers or drains are damaged after you finish.
  • You do not photograph finished work before others use it.
  • Damage is reported verbally, if at all.
  • Recharges are refused because there is no evidence.
  • Repairs pile up just before adoption inspections.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will the main contractor accept photos as evidence?

Nothing guarantees acceptance, but dated, located photos and same-day notification give them something to act on and to pass on to the trade responsible.

Does this work on main contractor sites as well as housebuilder sites?

Yes. Any site where your finished work is used by other trades.

Can it include drain surveys?

Yes. CCTV survey reports or test results can be filed against runs as their finished condition.

Can we set our own recharge rates?

Yes. Recharges use the rates in your subcontract or the rates you set.

What affects the cost?

The number of sites, whether you want finished-condition records for all work or only key items, and your invoicing system.

Keep reading

More on Problems We Solve

Start here

Tell us where your groundworks jobs leak time and money

Describe the problem, how your gangs, plant and office work today, and which main contractors or housebuilders you work for. We will tell you what we would build and what we would not, and if a spreadsheet or your existing software would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →