How Do We Plan Which Gang and Which Machine Goes to Which Site Tomorrow Without a Round of Phone Calls Every Evening and Morning?

Groundworks contracts managers place gangs and machines by phone every evening. We build a daily allocation board showing people, plant and site needs together.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Gang allocation eats evenings because the contracts manager holds in their head which gangs, operators and machines are where, which sites need what tomorrow, and who is off. We build an allocation board that shows every gang, operator and machine against every site by day, flags clashes and gaps, sends each ganger and operator tomorrow's site and start by text, and records where everyone actually was.

The evening phone round

At six in the evening your contracts manager is on the phone. The drainage gang on the north site needs a second labourer tomorrow. The 13-tonner needs to move to the east site, which means booking the low-loader. One operator has a hospital appointment. The main contractor on the town centre job wants a gang back for a day to form a pit. By the time it is all sorted, it is eight o'clock and at least one ganger has not been told.

At six the next morning, the calls start again when a van breaks down or a delivery is cancelled.

Why allocation lives in one head

A groundworks firm's resources are people and machines that move between sites every few days. The plan is a jigsaw that changes daily, and the only complete picture is in the contracts manager's head, sometimes with a whiteboard in the yard. When they are off, nobody else can do it well.

  • Gangs, operators and machines are allocated by phone.
  • There is no single view of who and what is where tomorrow.
  • Holidays, sickness and appointments are remembered, not recorded.
  • Machine moves need low-loader bookings that are arranged separately.
  • Where people actually worked is not recorded, so costing guesses.

What phone-based allocation costs

Evenings and early mornings of the contracts manager's life, every week. Gangs arriving at the wrong site or without the machine they need. Machines idle on one site while another waits. Main contractors let down when promised gangs do not show. And job costs that assume people were where they were planned to be, not where they went.

The allocation board we build

  1. Every gang, operative, operator and machine is listed, with skills such as pipe layer, machine tickets held and trades.
  2. Sites are listed with what they need each day, taken from the programme, the lookahead or the contracts manager's plan.
  3. The board shows people and machines against sites by day, with drag-and-drop changes on a laptop or tablet.
  4. Clashes are flagged: a person in two places, a machine with no transport booked, a site with no gang, an operator allocated to a machine they are not recorded as trained on.
  5. Holidays, sickness and appointments are entered once and shown as unavailable.
  6. Each evening, gangers and operators get a text with tomorrow's site, start time and any notes. Changes in the morning go out the same way.
  7. Gangers confirm arrival on a phone, so the record of where people actually worked feeds job costing and payroll.
TomorrowNorth siteEast siteTown centre
GangsDrainage gang, plus one labourerFoundation gangFormwork gang, one day
Machines8t excavator, dumper13t excavator, arriving by low-loaderMini digger
FlagsNoneLow-loader booked for 7:00Main contractor confirmed

Who does what is still your contracts manager's decision. The board shows the jigsaw and catches clashes before they happen.

Evenings back, mornings calmer

The contracts manager plans on a screen rather than on the phone, and the plan goes out to everyone with one click. Clashes are caught before they cost a morning. Someone else can cover when the contracts manager is off, because the plan is not in one head. And where people and machines actually worked is recorded, which makes job costs honest.

Gangers get something too: tomorrow's site in writing the evening before, not a call during their tea.

Is your gang planning done by phone?

  • Gangs and machines are allocated by phone each evening.
  • Only one person knows the full plan.
  • Gangs have turned up at the wrong site or without a machine.
  • Machine moves clash with low-loader availability.
  • Job costs assume people were where they were planned to be.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it plan the gangs automatically?

It can suggest allocations, but the contracts manager decides. Most of the value is seeing the whole picture and catching clashes.

Do operatives need smartphones?

Texts work on any phone. Confirming arrival works best on a smartphone, or the ganger can confirm for the gang.

Can it record training and machine tickets?

It can hold the cards and tickets each person has, with expiry dates, so allocations can be checked against them. What is required is your decision.

Does it link to payroll?

Yes. Where people worked, and for how long, can go to payroll and job costing.

What affects the cost?

The number of people, machines and sites, and whether we connect to your payroll, job costing or plant records.

Keep reading

More on Problems We Solve

Start here

Tell us where your groundworks jobs leak time and money

Describe the problem, how your gangs, plant and office work today, and which main contractors or housebuilders you work for. We will tell you what we would build and what we would not, and if a spreadsheet or your existing software would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →