How Do We Record Invert Levels, Pipe Runs and Manhole Details as We Lay Them, So the As-Built Drawing Is Not Guesswork?

Groundworks drainage gangs note invert levels in a notebook, if at all. We build as-laid records per run and manhole that feed the as-built drawing directly.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

As-built drainage drawings are hard to produce because invert and cover levels, pipe sizes, lengths and connections are noted in a notebook or on a marked-up print that goes missing. We build as-laid recording on a phone or tablet, run by run and manhole by manhole, with levels, photos and position, checked against the design as they go in, and exported in the format your engineer or surveyor needs for the as-built.

The as-built nobody can draw

Your drainage gang has laid the foul and surface water on a housing phase: pipe runs, manholes, inspection chambers, plot connections. The pipe layer or engineer took levels as they went, in a notebook and on a print in the van. Now the housebuilder wants as-built drawings, and the water company will want them for adoption. The notebook has most of the levels. A few runs were changed on site to avoid a service. The print with the changes marked on it got wet.

Someone ends up re-surveying manholes and lifting covers to measure depths, weeks after the work was done.

Why as-laid records go missing

Levels are recorded because the gang needs them to lay the pipe to fall. Recording them for someone else, in a form a drawing can use, is a separate job with no immediate reward. Changes on site are made for good reasons and remembered, not written. The paper record lives in a van until it is needed.

  • Invert and cover levels are written in notebooks.
  • Changes to runs and manhole positions are marked on paper prints.
  • Pipe material, size and length are not recorded per run.
  • Plot connection positions are not measured and recorded.
  • The as-built is produced weeks later from whatever survives.

What missing records cost

Re-surveying manholes and runs to produce drawings you should already have. Delays to the housebuilder's handover and to adoption, which can hold up money. Disputes about whether the drainage was laid as designed, with no record to show what was done and why it changed. And a poor impression with the engineer and the water company, who see a lot of late as-built packs.

As-laid recording we build

  1. The design drainage layout is loaded, with each run and manhole referenced as on the drawing.
  2. As each run is laid, the pipe layer or engineer selects it on a phone or tablet and records invert levels at each end, pipe material, diameter and length, bedding type and any change from design, with a reason.
  3. Each manhole or chamber gets its cover and invert levels, depth, size, connections and a photo inside and out.
  4. Plot connections and junctions are recorded with position and level.
  5. Readings are compared with design levels and gradients as they are entered, and differences beyond your tolerance are flagged straight away.
  6. Where you use a GPS rover or total station, readings can be imported instead of typed.
  7. The as-laid data is exported in the format your engineer or surveyor uses to produce the as-built drawing, with a schedule of manholes and runs.
Recorded itemCapturedUsed for
Run invert levelsEach end, as laidGradient check and as-built
Pipe detailsMaterial, size, lengthAs-built schedule
Manhole detailsCover, inverts, depth, photosManhole schedule
Changes from designWith reason and photoExplaining the as-built
Plot connectionsPosition and levelHousebuilder and adoption

Design tolerances and what counts as acceptable are set by the engineer and the adopting body. We record against them; we do not set them.

As-builts from the day's work

The as-built record exists as the drainage goes in, not weeks later. Changes on site are explained at the time. Your engineer or surveyor produces the drawing from data rather than from a damp notebook. The housebuilder and the water company get their information sooner. And if a level is out, it is flagged while the trench is still open.

Are your drainage records like this?

  • Levels live in a notebook in the van.
  • Changes on site are marked on paper prints.
  • You have re-surveyed manholes to produce as-builts.
  • As-built drawings hold up handover or adoption.
  • Out-of-tolerance levels are found after backfilling.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can it read our GPS rover or total station data?

Yes. Most instruments export readings in standard formats that we can import against runs and manholes.

Does it produce the as-built drawing itself?

It produces the data and schedules. Your engineer or surveyor produces the drawing in their CAD system.

Does it work without signal?

Yes. Readings save on the device and sync later.

Can the housebuilder see the records?

If you choose. A shared view or export can go to them and to the engineer.

What affects the cost?

The number of sites, the formats your engineers use, and whether survey instruments are connected.

Keep reading

More on Problems We Solve

Start here

Tell us where your groundworks jobs leak time and money

Describe the problem, how your gangs, plant and office work today, and which main contractors or housebuilders you work for. We will tell you what we would build and what we would not, and if a spreadsheet or your existing software would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →