Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop Retyping Field Logs and Lab Results Before We Can Produce AGS Data and Log Plots?
Problems We Solve

How Do We Stop Retyping Field Logs and Lab Results Before We Can Produce AGS Data and Log Plots?

Geotechnical engineers retype field borehole logs and lab results into AGS data. We build digital field capture and lab import that validate before reporting.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Ground investigation data gets retyped because field logs are written on paper or in spreadsheets and lab results arrive in the lab's own format, while the report needs clean AGS data and log plots. We build a field capture app that records logs in a structure that maps to AGS, and an import step that validates lab data against it, so the data goes into your log production software with far less retyping and checking.

A week of fieldwork, then a week of typing

A ground investigation wraps up. The engineer on site kept paper logs for twelve window samples and four cable percussion boreholes, with descriptions, sample references, water strikes and in situ tests. The lab's results arrive as a spreadsheet and a PDF. Now someone in the office types the logs into your log production software, cross-references sample numbers with the lab results, fixes the ones that do not match, and produces AGS data for the client.

Typing the logs is slow, and it is also where errors creep in: a depth transposed, a sample reference misread from muddy handwriting, a description abbreviated in a way the next person cannot read.

Why GI data gets handled so many times

  • Field logging is on paper or a generic spreadsheet with no structure matching AGS groups.
  • Sample numbering is written by hand and does not always match the lab's references.
  • Labs return results in their own format, even when they can produce AGS.
  • Validation happens only when the AGS file is built, at the end, when errors are hardest to trace.
  • Photos of cores and samples are held separately and linked by hand.

Tools such as HoleBASE and gINT are good at producing logs and managing AGS data once it is in. The pain is getting it in cleanly.

What double handling costs

StepWhat goes wrong
Typing paper logsTime, transcription errors, delayed factual report
Matching lab samplesMismatched references, results attached to wrong depths
Late AGS validationErrors found days after the data was entered
Photo filingCore photos hard to find or wrongly labelled

The factual report is often on the critical path for the design. Every day spent typing is a day the engineers waiting for ground data cannot start.

How we build GI data capture

  1. A tablet app for the site engineer records each hole's details, strata descriptions, samples, in situ tests and water observations in a structure that maps to AGS groups.
  2. Descriptions use pick lists for the standard terms your practice uses, with free text where needed, and the engineer stays in charge of the wording.
  3. Sample references are generated by the app and printed as labels, so the lab receives consistent references.
  4. Core and sample photos are taken in the app and attached to the hole and depth automatically.
  5. The app works offline and syncs when signal is available.
  6. Lab results, in AGS or the lab's spreadsheet format, are imported and matched to samples, with mismatches listed for a person to resolve.
  7. Data is validated against the AGS format and your own rules as it goes, and exported as AGS for your log production software and for the client.

We work with the log software you already use rather than replacing it. The aim is to hand it clean data.

What changes for the GI team

The site engineer's logs are already digital when they leave site. The office checks rather than types. Lab results slot into the right samples, and the few that do not are listed for someone to sort out.

AGS errors are caught at the point of entry, while the engineer still remembers the hole.

Does this match your GI workflow?

  • Paper field logs are typed up in the office.
  • Lab sample references regularly fail to match yours.
  • AGS validation errors appear at the end.
  • Core photos are filed by hand.
  • Factual reports are held up by data entry.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does this replace HoleBASE or gINT?

No. We feed clean data into your existing log production software. If you do not use one, we can export AGS for others to use.

Will it work on site with no signal?

Yes. The app stores everything locally and syncs when it can.

Can we keep our own description conventions?

Yes. Pick lists and templates are set up from how your engineers already describe soils and rocks.

What if the lab only sends PDFs?

We can extract tables from PDFs, but results then need more checking. It is usually worth asking the lab for AGS or spreadsheet output.

What affects the cost?

The range of site activities to capture, the labs you work with, and the log software we need to feed.

Keep reading

More on Problems We Solve

Start here

Tell us where your engineering practice loses time

Describe the process, the software your engineers and office team already use, and where it stalls. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →