Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Cut Panels Sent Out for Embroidery, Printing or Washing?
Problems We Solve

How Do We Keep Track of Cut Panels Sent Out for Embroidery, Printing or Washing?

Cut panels vanish at outside embroiderers, printers and wash houses. We build outwork tracking for garment makers that counts every piece out and back in.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Panels go missing at subcontractors because outwork is sent with a handwritten delivery note and checked back in by eye, if at all. We build outwork tracking that creates a dispatch note from the bundles leaving, records what comes back by bundle and size, flags shortages and rejects straight away, and keeps a running balance with each embroiderer, printer or wash house.

The embroiderer says they sent everything back

Fronts for 900 polo shirts went to the embroiderer for a chest logo. They came back over three deliveries in a van, in bags. The finishing supervisor has 862 embroidered fronts. The embroiderer says they returned all 900, plus some they rejected because of a puckered logo, which may or may not have been counted. The delivery note that went out was handwritten and has one total on it.

There is no way to settle it. Either the factory recuts, or the order ships short.

Outwork falls between two businesses

Your own floor may be tracked well. The moment panels leave the building, they drop out of your system and into someone else's, and the only link between the two is a piece of paper.

  • Dispatch notes are handwritten with totals, not a breakdown by bundle, size and colour.
  • Returns arrive in part deliveries and are counted roughly.
  • Rejects and damaged pieces are not recorded separately.
  • Nobody keeps a running balance of what each subcontractor holds.
  • Delays at the subcontractor are found out when the line runs out of panels.

Missing panels, missing days

A shortage found at finishing means a recut, which needs fabric and possibly another trip to the embroiderer, holding up the whole shipment for a handful of pieces. Arguments with subcontractors over counts sour relationships you depend on. And without a record of how long each subcontractor takes and how often they reject or damage work, choosing who to send the next order to is guesswork.

Outwork is also where planning breaks down. The line is loaded on the assumption that embroidered fronts will be back on Wednesday, and when they are not, operators wait.

Outwork tracking, bundle by bundle

  1. Bundles going out are scanned onto a dispatch, which prints a note listing each bundle with style, colour, size and quantity. The subcontractor signs for it, on paper or on a phone.
  2. The dispatch records the expected return date agreed with the subcontractor.
  3. Returns are scanned in by bundle as they arrive, with the quantity counted. Any difference from what went out is recorded as short, rejected or damaged, with a reason.
  4. A running balance per subcontractor shows what they currently hold, by order, and what is overdue.
  5. Shortages trigger an alert to the merchandiser the day the return arrives, while the subcontractor still remembers the job.
  6. Over time, the records show each subcontractor's turnaround and reject rate, which helps when allocating the next job.
QuestionAnswered now byAnswered with tracking
What did we send?A handwritten totalBundle list with sizes and colours
What came back?A rough countScanned by bundle
What does the embroiderer still hold?Phone callRunning balance
Which returns are late?When the line stopsOverdue list

If a subcontractor is willing to use it, they can be given a simple view to confirm receipt and mark bundles ready. It works without that too.

Sending work out without the worry

Shortages are spotted on the day of the return, when they can still be found in the subcontractor's bags. Disputes are settled from a bundle list rather than memory. The planner knows which panels are due back and when, and which subcontractor is running late, in time to reload the line. And the next job goes to the embroiderer whose record is best, not whoever answered the phone.

Is outwork a black hole for you?

  • Orders have shipped short because panels went missing outside.
  • Dispatch notes are handwritten totals.
  • Rejects from embroiderers or printers are not counted separately.
  • Lines wait for panels that are late back from a subcontractor.
  • You do not know what each subcontractor currently holds.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do our subcontractors need to use the system?

No. Everything can be done at your end with scans out and in. Giving them a view is an option if they want it.

Can it handle garments sent out for washing after sewing?

Yes. Garments or bundles going to a wash house or for pressing are tracked the same way as panels.

What if bundles are split or combined by the subcontractor?

Returns can be recorded by size and colour quantity instead of bundle, and the balance still works.

What do you need from us?

Your subcontractor list, a few recent dispatch notes and an example of an outwork job where the count went wrong.

Keep reading

More on Problems We Solve

Start here

Tell us which part of the garment workflow lives on paper

Describe what you make, who you make it for and how the work is recorded today, including the bits held together by a notebook or a WhatsApp group. We will tell you what we would build and what we would leave alone, and if a small change would do, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →