How Do We Know Hour by Hour Whether Each Sewing Line Is on Target?

Clothing factories find out a line missed target when the shift ends. We build hourly output tracking against SAM targets so garment supervisors can act sooner.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Line output is known too late because it is counted at the end of the shift from finishing, or written on a board no one in the office sees. We build hourly output tracking that counts completed pieces at the end of each line, compares them with the target worked out from the style's SAM, and shows supervisors and the planner where a line is falling behind while there is still time to act.

Line 5 was behind from ten o'clock

At the end of the day the finishing count shows line 5 produced well under target on the new shirt style. The supervisor explains: the collar operation was slow from mid-morning, a machine was down for an hour, and two operators were learning the style. All true, and all known on the floor by ten o'clock. The planner found out at six.

The hourly board by the line had the numbers on it, in marker pen. Nobody in the office walks past it.

Why output is found out late

Most factories do count output. The trouble is where and when it is counted, and that the target is rarely worked out properly for each style.

  • Pieces are counted at finishing or packing, hours after they leave the line.
  • The hourly board is paper or whiteboard and stays on the floor.
  • Targets are set by habit rather than from the style's SAM, operators and hours.
  • Downtime, style changes and absences are not recorded against the hour they happened.
  • Nobody compares one week with the next for the same style.

What late numbers cost

A line that is behind at ten can often be helped at ten: move an operator, fix the machine, split the slow operation. At six it is just a missed target and a later ship date. Without the record of why an hour was lost, the same problems repeat on the next order. And when output is only known at the end of the day, the planner's promises to brands are always slightly out of date.

Targets set by habit cause their own trouble. A line given an easy target on a simple style looks brilliant, and a line given the same target on a style with a tricky collar looks poor, when both were working well. Supervisors know this, and it makes any figure the office produces easy to dismiss.

Hourly output tracking we put in place

  1. At the end of each line, completed pieces are counted with a scan per bundle or a simple tap counter on a tablet.
  2. The hourly target for each line is calculated from the style's SAM, the number of operators present and the minutes available, using the efficiency level you expect for that product.
  3. A screen at each line and in the office shows actual against target for each hour, with the gap in pieces.
  4. Supervisors record the reason for a poor hour from a short list you define (machine down, waiting for work, new style, absence, quality stop), with a note if needed.
  5. Downtime reasons and output by hour are kept by style, so you can see how the second week of a style compares with the first.
  6. The planner gets an up to date view of completed pieces per order, which feeds the ship date.
InformationTodayWith hourly tracking
OutputCounted at finishingCounted at the end of each line, per hour
TargetHabitWorked out from SAM and operators
Reason for a bad hourRememberedRecorded by the supervisor
Office visibilityEnd of shiftThroughout the day

A shift with numbers in it

The production manager sees by mid-morning that a line is behind and why, and can do something while it matters. Supervisors have a record of the hours they lost to machine breakdowns, which strengthens the case for maintenance. The planner's ship dates start to reflect what the lines are actually doing.

Do these apply to you?

  • You learn about a poor day on a line at the end of the shift.
  • Hourly boards exist but nobody off the floor sees them.
  • Targets are not worked out from the style.
  • Reasons for lost hours are not recorded.
  • Ship dates are regularly revised late.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does this need operation-level scanning?

No. Counting pieces at the end of each line is enough for hourly output. Operation scanning adds detail if you also use it for pay.

What if we do not have SAMs for our styles?

Targets can start from your current expectations and be refined as actual output builds up. SAM-based targets are better, and we can help you set them up.

Will supervisors resent being watched?

That depends on how it is used. Most supervisors welcome a record that shows when a lost hour was a machine or a late bundle rather than their line.

What screens do we need?

Any cheap TV or tablet can show the line view. The office view runs in a web browser.

Keep reading

More on Problems We Solve

Start here

Tell us where the paperwork slows your factory floor

Describe the brands you make for, how orders reach the cutting room, and how the lines are tracked and paid today. We will tell you what we would build and what we would leave alone, and if a change to the way you already work would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →