Fabric inspection sheets for shade, faults and shrinkage never reach the garment cutting room. We build roll records that carry those results to the lay plan.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Shade and shrinkage problems appear after cutting because fabric inspection results are written on a sheet in the store, and the cutting room never sees which rolls belong to which shade group or which ones failed. We build a roll record that holds each roll's inspection points, shade group and test results, and uses them when rolls are allocated to lays, so mixed shades and untested fabric are caught before the knife goes in.

Two shades of navy in one garment

The fabric store did its job. Rolls were checked on the inspection frame with the four-point system, a shade band was cut from each roll, and two rolls were marked as a slightly lighter lot. It is all on a sheet clipped to a board by the frame. The cutting room took the next six rolls off the rack, laid them up in one lay, and cut. At the sewing line, operators noticed sleeves that did not quite match the body.

The shrinkage test on one dye lot was also still waiting to be washed. It came back high after the order was sewn.

The results never travel

Inspection is done properly in many factories. The gap is that the result stays where it was produced. Rolls on the rack look the same, and the person spreading them has no easy way to know which shade group each one is in or whether it has passed.

  • Four-point scores, shade groups and faults are recorded on paper at the frame.
  • Roll tickets carry the supplier's number, not your inspection result.
  • Shrinkage and colour fastness tests are sent out or done later, and the results arrive after the fabric is released.
  • Rolls are pulled for cutting in rack order rather than by shade group.
  • Faults marked on the roll are not listed for the spreader, so they are found mid-lay.

What the gap costs

Shade variation within a garment is one of the defects brands reject whole lots for. Once panels from two shades are sewn together, the fix is recutting panels, which needs fabric that may no longer exist in the right shade. Shrinkage found after sewing is worse: it can mean the whole order measures out of tolerance after washing. Fabric claims to the mill are harder to make when you cannot show which roll was which, and by the time the problem is found, the rolls are cut.

Meanwhile the store team feels ignored, because they did the inspection and it made no difference.

Roll records that follow the fabric

  1. Each roll gets your own barcode label at goods in, linked to the supplier's roll number, dye lot and delivery.
  2. At the inspection frame, the inspector records faults with position and points, the total score, and the shade group, on a tablet rather than a sheet. The roll's pass or fail follows your own acceptance rules.
  3. Lab or in-house test results for shrinkage and other checks are recorded against the dye lot, and a dye lot stays on hold until the tests you require are in.
  4. When the cutting room plans a lay, the system offers rolls from one shade group only, excludes rolls that failed or are on hold, and shows the length available.
  5. The spreader sees each roll's recorded faults and positions before spreading, so they can plan cut-outs rather than discover them.
  6. Every lay keeps a record of which rolls went into it, so a problem found later can be traced to the roll and the mill.
Inspection resultWhere it ends up nowWhere it ends up with roll records
Shade groupSheet by the frameUsed to group rolls into lays
Four-point scoreSheet by the framePass, fail or hold on the roll
Shrinkage testArrives after cuttingDye lot held until the result is in
Fault positionsChalk on the rollListed for the spreader

A cutting room that trusts the rack

Spreaders take rolls that the system has already grouped, rather than hoping. Untested lots cannot be cut by accident. When a mill claim is needed, you have roll-level inspection records and the lays each roll went into, which makes it a factual conversation. And the store team's work finally changes what happens downstream.

Recognise any of these?

  • Shade differences show up at sewing or final inspection.
  • Inspection results are on paper by the frame.
  • Rolls are cut before shrinkage results come back.
  • Spreaders find faults halfway through a lay.
  • You struggle to prove which rolls a fabric claim relates to.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it tell us what shrinkage is acceptable?

No. The acceptance rules come from you and your brands. The system applies them to the results recorded and holds anything that does not meet them.

Do we need to inspect every roll?

That is your decision and often your brand's. The records show which rolls were inspected and which were sampled.

Can it work with fabric the brand supplies?

Yes. Brand-supplied rolls are labelled and inspected the same way, which also gives you evidence if the fabric was faulty on arrival.

What equipment is needed?

A label printer at goods in, a tablet at the inspection frame and a phone or tablet in the cutting room.

What do you need from us?

Your inspection sheets, your acceptance rules and an order where shade or shrinkage caused trouble.

Keep reading

More on Problems We Solve

Start here

Tell us which part of the garment workflow lives on paper

Describe what you make, who you make it for and how the work is recorded today, including the bits held together by a notebook or a WhatsApp group. We will tell you what we would build and what we would leave alone, and if a small change would do, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →