Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Produce the Monthly Performance Reports Our Importers Ask For Without a Week of Spreadsheets?
Problems We Solve

How Do We Produce the Monthly Performance Reports Our Importers Ask For Without a Week of Spreadsheets?

Freight forwarders build monthly KPI reports for importers by hand: transit times, on-time rates, costs. We build reporting from job and milestone data.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Monthly KPI reports take days because the figures importers want, transit times, on-time delivery against booked dates, cost per container or per kilo, volumes by supplier and lane, are spread across jobs, milestone events and invoices, and assembled in spreadsheets. We build customer reporting that calculates each importer's agreed measures from job and milestone data, produces the report on a schedule in their preferred layout, and lets them see the same figures live if they wish.

The quarterly business review is on Thursday

Your largest importer holds a quarterly review with you. They want transit times by lane against what you quoted, the proportion of shipments delivered on the booked date, costs per container and per cubic metre by lane, and volumes by supplier. An account manager spends the week before exporting jobs, matching them to tracking events, pulling invoice totals and building charts.

Two other customers want a monthly version of the same thing, each with slightly different measures. Every month, the work starts again.

Why the reports take so long

The information is all in your systems, but not in a form that answers a customer's question directly. Transit time needs milestone events, on-time needs a booked date and an actual one, cost per unit needs invoices matched to volumes.

  • Milestone events may not be stored against jobs consistently.
  • Each customer defines measures differently, such as which dates count as departure and arrival.
  • Invoice totals are in accounts and have to be matched to jobs and volumes.
  • Supplier and purchase order data may only exist in the customer's own spreadsheets.
  • Reports are rebuilt from exports every period.

What it costs

Account managers spend days a month on reporting instead of on the customer. Reports are late or inconsistent from one period to the next, which undermines them. Mistakes in a customer-facing report are embarrassing. And forwarders who cannot report well look weaker at tender time than they really are.

The customer reporting we build

  1. Job, milestone and invoice data are gathered daily from your forwarding system, tracking sources and accounts.
  2. Each customer's measures are defined once with you: which milestones mark departure and arrival, what counts as on time, which costs are included in cost per unit.
  3. Measures are calculated per shipment, and exceptions such as missing events are flagged for your team to check.
  4. Reports are produced on a schedule in the layout each customer prefers, with the shipment-level detail available behind every figure.
  5. Customers can have a live view of the same measures if they want it, with only their own data.
  6. Your account managers can add commentary before a report goes out.
MeasureBuilt by hand fromCalculated from
Transit timeExports and tracking sitesStored milestone events
On-time deliverySpreadsheet comparisonsBooked and actual dates per shipment
Cost per unitAccounts export plus volumesInvoices matched to job volumes
Volumes by supplierCustomer spreadsheetsJobs linked to supplier and order

After

Reports go out on time and consistent from month to month. Account managers spend the week before a review preparing the conversation, not the spreadsheet. Measures are defined clearly, so disagreements about figures are rarer. And when a tender asks how you report performance, you can show it.

The figures also help you internally. When on-time performance slips on one lane, the account manager sees it in the same data the customer will, before the review rather than during it, and has time to find out why: a carrier's schedule reliability, a slow transhipment port, or a haulage problem at the UK end. The review becomes a discussion of causes rather than a debate about numbers.

Checklist

  • Customer KPI reports are built in spreadsheets every month.
  • Different customers want different measures.
  • Reports have gone out late or with errors.
  • Milestone data is incomplete on jobs.
  • Account managers dread review week.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can each customer have different measures?

Yes. Each customer's definitions are set up separately.

What if milestone data is missing for some shipments?

Those shipments are flagged for your team to complete or exclude, and the report shows how many were affected.

Can customers see the data live?

Yes, if you want to offer that, with access limited to their own shipments.

Does it work with our forwarding system's reports?

It uses the data from your system. If your system's own reporting can do it, we tell you.

What affects the cost?

The number of customers and measures, the quality of milestone data, and the systems involved.

Keep reading

More on Problems We Solve

Start here

Tell us what your forwarding customers keep asking for

Describe your customers, your lanes, the forwarding system you run on, and the requests or problems that take your team the most time. We will tell you what we would build and what we would leave alone, and if a report or setting in your current system would do it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →