How Do We Keep Track of Every Application, Plan and Submission Deadline for a Festival?

Festival organisers track licence, road closure and safety plan deadlines across several bodies. We build a submissions tracker with owners, versions and dates.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

A festival involves many submissions to different bodies, each with its own deadline and each depending on documents from different people, and they are tracked in one person's spreadsheet. We build a submissions tracker that lists each application and plan, its deadline, the documents it needs, who owns each one, and every version sent, with reminders well before the dates.

Every body wants something by a different date

A new outdoor festival is months away. Your team must prepare and submit a set of documents to several bodies, in general terms: the premises licence or event notice route your advisers recommend, the event management plan, traffic and road closure applications, safety plans for the relevant advisory group, noise management, medical and welfare arrangements, and plans the landowner requires. Each body has its own deadlines and meeting dates, and many documents depend on each other.

The production manager keeps a spreadsheet of dates. The event management plan is in its eleventh draft. The traffic plan depends on the site layout, which changed last week. Someone asks which version of the noise plan went to the council, and nobody is sure.

Why festival paperwork gets away from you

The work is spread across specialists, and the deadlines belong to other organisations.

  • Different bodies have different deadlines, meeting cycles and submission methods.
  • Documents depend on each other, so a site layout change ripples through several plans.
  • Specialists and contractors write sections, and chasing them is manual.
  • Versions are emailed, and the version submitted is not recorded clearly.
  • Conditions and follow-up requests from bodies arrive by letter or email and are tracked in inboxes.

What a missed date or wrong version risks

A missed deadline can delay a decision you need, or push your plans to a later meeting, which squeezes the time for everything else. Submitting an out-of-date version confuses the people reviewing it and damages the trust you need with them. Conditions you did not act on can become problems late in the process. The detail of all this is a matter for your advisers and the bodies concerned; what you control is whether your own tracking is reliable.

It also depends too much on one person. If the production manager who holds the spreadsheet is off sick in the month before a key meeting, nobody else knows which contractor owes which section or which version went where.

A submissions tracker for the festival

  1. Each application or plan is an item with the body it goes to, its deadline, any meeting dates and the method of submission, entered by your team from the guidance you have been given.
  2. Each item lists the documents it needs and which other items it depends on, such as the site plan feeding the traffic plan.
  3. Each document has an owner, internal or external, with a due date set back from the submission deadline.
  4. Owners get reminders and upload drafts to the tracker, which keeps every version.
  5. When a dependency changes, such as a new site plan, the documents that rely on it are flagged for review.
  6. Submitting marks the exact version sent, the date and the method, and responses or conditions are logged against the item with actions and owners.
  7. A timeline view shows every item and date, so the production manager can see the next few weeks at a glance.
ItemDepends onOwnerStatus
Event management planSite plan, medical planProduction managerDraft with changes
Traffic and road closuresSite planTraffic contractorReview after site change
Noise management planStage positionsNoise consultantSubmitted, version recorded
Landowner plansSite planSite managerDue next month

The tracker holds dates and documents your team enters. What must be submitted, to whom and when is decided by the bodies concerned and your advisers; it does not give licensing or safety advice.

A planning season you can see

At the Monday production meeting, the timeline shows two submissions due in the next month, one document late from a contractor, and three plans flagged because the site layout changed. The production manager assigns reviews. When the council asks a question about the noise plan, the team can see exactly which version was sent and when. Conditions from each body sit against the relevant item with an owner, so nothing waits in someone's inbox.

Do you recognise this festival office?

  • Submission deadlines are tracked in one person's spreadsheet.
  • You are unsure which version of a plan was sent.
  • Site changes are not carried through to dependent plans.
  • Contractors' sections arrive late and are chased by email.
  • Conditions from bodies are tracked in inboxes.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does the tracker tell us which licences we need?

No. That comes from your advisers and the bodies involved. You enter the items and dates, and the tracker keeps them on course.

Can external consultants use it?

Yes, with access limited to the documents they own.

Does it work for repeat festivals?

Yes. Next year's tracker starts from this year's items and documents, with dates to update, which saves a lot of setup.

Where are the documents stored?

In storage you control, such as Microsoft 365 or a cloud bucket in your account, with every version kept.

Keep reading

More on Problems We Solve

Start here

Tell us where your events lose time before the doors open

Describe how an event runs at your company, from the client brief to the last supplier invoice, and which registration platform, spreadsheets and accounts package you use now. We will tell you what we would build and what we would leave alone, and if a setting in a tool you already pay for would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →