How Do We Keep Servicing of Our Workplace and Car Park Chargers on Track?

Servicing commercial charge points slips when obligations sit in a folder of PDFs. We turn each agreement into dated jobs, model checklists and host updates.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Maintenance visits on commercial charge points fall behind because the contract terms, the charger list and the visit dates are held in different places, and reactive work always wins. We build a maintenance schedule per site from each contract, raise visits in good time, give engineers a checklist per charger model, and send each site host a visit report.

Is the car park visit this quarter or next?

You now look after chargers at a supermarket car park, a few office sites, a hotel and a council depot. Each contract promises something slightly different: a number of visits a year, certain checks, a report. The contracts sit in a folder, the charger list in a spreadsheet, and visit dates in the diary if someone remembered to put them there.

A site host emails asking for last year's maintenance report ahead of their own audit. You find you did the visits, mostly, but the reports are in three formats and one site was missed entirely when an engineer left.

Reactive work always wins

Maintenance is easy to postpone because nothing is broken today. Every week, fault calls and new installs arrive with more urgency, and planned visits slide. There is also no single view of obligations: which chargers, at which sites, need what, by when, under which contract.

  • Contract terms are read once at signing and then forgotten.
  • The charger list per site is out of date after additions and swaps.
  • Visits are booked when someone looks at the spreadsheet.
  • Engineers use their own checklist, or none.
  • Reports are written in a word processor, one site at a time.

When visits slip

Contracted visits you have not delivered are an awkward conversation at renewal, or a reason not to renew. Checks that were skipped can let a small problem become a fault, and a fault on a public charger means drivers who could not charge and a site host who notices. Report writing eats engineer evenings, and inconsistent reports make your service look less organised than it is.

Public and workplace chargers are also visible in a way home chargers are not. Drivers leave reviews on charging apps, and a site host reading that the bays are often broken will ask what your maintenance visits are for, whether or not the fault had anything to do with them.

A maintenance schedule built from the contracts

  1. Each contract's terms go into the system as structured data: sites, chargers covered, visit frequency, required checks and report recipients. Your team confirms each one.
  2. Each site's charger list is linked to your commissioning and asset records, so it stays current when units are added or swapped.
  3. Visits are generated ahead of their due windows and offered to the scheduler alongside reactive work, with access notes for each site.
  4. Engineers get a checklist per charger model in their job app, set by your team. Each check is ticked with a photo where your process wants one, and defects create a follow-on job.
  5. When the visit closes, a report is produced in a standard format and sent to the site host contacts, with defects and recommendations listed.
  6. A dashboard shows visits due, overdue and complete by contract, so slippage is visible early.
Contract elementHeld todayHeld in the schedule
Visit frequencyIn a PDFStructured, generates visits
Chargers coveredA spreadsheetLinked to live asset records
ChecksEngineer's habitChecklist per model, set by you
ReportTyped per siteProduced on visit close
StatusNobody knowsDue, overdue, complete by contract

The checks themselves are yours to define, based on manufacturer guidance and your own standards. We build what records them; we do not set them.

Maintenance you can show

Planned work sits in the diary next to reactive work, so the scheduler makes a conscious choice rather than letting it slide by default. Engineers follow the same checks everywhere. Site hosts get consistent reports without chasing. At renewal time, you can show every visit and every defect raised and closed under the contract.

Checklist for your contracts

  • You could not say today which contracted visits are overdue.
  • Maintenance reports look different depending on the engineer.
  • Site hosts have asked for reports you had to assemble.
  • The charger list per site does not match what is on the ground.
  • Planned visits are regularly bumped by fault calls.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can the schedule sit in our existing job management software?

Often yes. If your system supports planned maintenance with an API, we feed it the contract data and build the reports around it rather than duplicating it.

Does it read the contracts automatically?

AI extraction can do a first pass on contract documents, but a person confirms every term before it drives the schedule.

Can site hosts log in and see their reports?

Yes, if you want a simple portal for them. Some installers prefer emailed reports only.

What affects the cost?

The number of contracts and sites, how many charger models need checklists, and whether we build in your job system or alongside it.

Keep reading

More on Problems We Solve

Start here

Tell us where your charger operations get stuck

Describe the sites and chargers you look after, the back-office or management platform they report to, and how work reaches your engineers today. We will tell you what we would build and what we would leave alone, and if your existing platform already does it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →