How Do We Get Extra Work Found on a Charger Install Agreed and Billed Properly?

Extra cable, a post or board work found on a home charger install often goes unbilled or disputed. We build on-site variation sign-off that feeds the invoice.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Install day extras go unbilled because the fitter agrees them verbally on a driveway and the office never hears. We build a variation step in the fitter's job app that prices the extra from your price book, shows the customer what changed and why, captures their agreement on the spot and adds the line to the final invoice.

Agreed on the drive, forgotten by Friday

The quote assumed the cable would go through the garage. On the day, the garage turns out to be full floor to ceiling, so the fitter clips it round the outside of the house instead. Extra cable, extra clips, an extra hour. He mentions it to the customer, who says fine. He mentions it to nobody else.

The office invoices the quoted price. Or the office hears later, adds the extra, and the customer, who remembers saying fine to something much smaller, disputes it. Either way, the margin on that job is gone, and the fitter has learned that raising extras causes arguments.

No route from the driveway to the invoice

Fitters are not bad at spotting extras. They are good at it, because they are the ones doing the extra work. What is missing is a quick, agreed way of recording one. Phoning the office from a customer's drive is awkward, the paper job sheet does not have a box for it, and the invoice is raised from the quote because that is the only priced document anyone has.

  • Fitters do not know the price of an extra, so they cannot tell the customer.
  • The customer's agreement is verbal and nobody writes it down.
  • Extras arrive in the office as a scribble, a text or not at all.
  • Invoices are raised from the accepted quote without checking the job notes.
  • Grant-funded jobs complicate who pays for what, so extras get dropped to keep things simple.

What it does to margins and trust

Unbilled extras are pure cost: materials and time given away. Disputed extras cost more, because they eat office time and sour a review. Over a season the pattern also skews your pricing data, because the quote says the job went as planned when it did not. The next quote for a similar house is priced from the wrong history.

The variation step we add

  1. The fitter's job app gets an Add Variation button. They pick from your standard extras (cable per metre, surface route, post mount, extra enclosure, groundworks) or describe something non-standard.
  2. Standard items are priced from the same price book the quote used. Non-standard ones can be sent to the office for a price in real time, with photos attached.
  3. The customer sees a short summary on the fitter's phone or tablet: what changed, why, and the added cost. They sign on screen or accept by a link sent to their phone.
  4. If the customer declines, that is recorded too, along with what the fitter did instead.
  5. Agreed variations are added to the job, and the final invoice in Xero, QuickBooks or your job software includes them automatically.
  6. The office gets a weekly list of variations by type, which feeds back into how surveys and quotes are written.
StepCurrent habitWith the variation step
Pricing the extraFitter guesses or avoids itFrom your price book, on the phone
Customer agreementVerbal, unrecordedSigned summary with photos
Telling the officeText or nothingAdded to the job automatically
InvoicingFrom the quote onlyQuote plus agreed variations
Learning from itNobody looksVariation report feeds the price book

A driveway conversation that ends cleanly

Fitters can raise an extra without feeling like salesmen, because the price is not theirs and the customer sees exactly what they are agreeing to. The office invoices what was done. Disputes become rare, and when one happens the signed summary and photos are on the job. After a few months the variation report shows which extras keep appearing, and the survey starts catching them before install day.

Checklist: are extras leaking?

  • Fitters often do more than the quote and say nothing.
  • Customers have disputed an extra they remember differently.
  • Invoices are raised from the quote without reading the job notes.
  • You have no list of extras from last month.
  • The same unpriced work turns up on job after job.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does the customer have to sign on the fitter's phone?

They can, or they can accept by a link sent to their own phone. Either way the agreement and the price are recorded against the job.

What about grant-funded installs?

Variations are recorded separately from the grant-funded portion, so your team can see what the customer owes. How extras interact with a particular scheme is for your team to decide.

Can it work in our existing job app?

If your job management system allows custom forms or has an API, we build the variation step into it. If not, we provide a small mobile form that writes back to the job.

What affects the cost?

How many standard extras you have, whether we build into your existing job app or alongside it, and which accounts package receives the invoice.

Keep reading

More on Problems We Solve

Start here

Tell us where your chargepoint admin gets stuck

Describe how a charger job moves through your business today, from enquiry to commissioning, and which systems and portals you use. We will tell you what we would build and what we would leave alone, and if a setting in your existing job software would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →