Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. Why Do Our Chargepoint Grant Claims Keep Bouncing Back, and How Do We Stop It?
Problems We Solve

Why Do Our Chargepoint Grant Claims Keep Bouncing Back, and How Do We Stop It?

Chargepoint grant claims bounce when one photo, serial or declaration is missing. We build an evidence checklist per job so each claim goes in complete.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Grant claims come back because the evidence is gathered after the install, from several people, against a list that lives in one person's head. We build a claim record that starts at booking, asks the fitter for each required item on the day, checks the pack against the scheme's current evidence list you maintain, and tracks every claim until it is paid.

The claim that went in three times

The install was a month ago. The customer paid their share, the fitter moved on to the next job, and the claim for the grant went in the following week. It came back: a photo did not show the serial number clearly. The second submission came back because the customer declaration was the old version. By the third, the admin person has spent more time on the claim than the fitter spent on the wall.

Multiply that by the jobs that sit in a folder called Grants To Do, and you have money you have earned, sitting outside the business, waiting on paperwork.

Evidence gathered backwards

Claims fail for a structural reason. The scheme wants evidence from the whole job: eligibility from before the install, photos and serials from the install itself, certificates and declarations from after. In most installers, collection only starts when someone sits down to submit, which is the one point when the fitter has gone and the customer has stopped answering.

  • Eligibility checks are done at enquiry, but the evidence is not saved against the job.
  • Fitters take photos, but not always the specific shots the scheme asks for.
  • Serial numbers are typed from a photo, and one digit goes wrong.
  • Declarations are sent as a PDF and come back as a phone photo of a printout.
  • Scheme rules and forms change, and the checklist in the office does not.

Where the money goes

The direct cost is cash flow. If the grant covers part of each install, a backlog of unpaid claims is working capital you have lent the scheme for free. The indirect costs are admin hours, customers asked to sign things again weeks later, and the occasional claim that is never paid because the evidence can no longer be recovered. None of it improves anything for the customer, who assumed the grant was your problem once they signed.

The claim pack we build into each job

  1. When a job is booked with a grant, a claim record is opened with the evidence list for that scheme. Your team maintains the list in a simple admin screen, so when the scheme changes, one edit updates every new job.
  2. Eligibility evidence collected at enquiry (tenancy, property type, vehicle details, whatever your scheme requires) is saved to the claim straight away.
  3. On the day, the fitter's job app asks for each required photo by name, and the charger serial is scanned from the barcode rather than typed.
  4. Customer declarations are sent for e-signature with the current version of the form, and the signed copy files itself.
  5. Before submission, the pack is checked against the list: every item present, serial matches the photo and the certificate, dates in order. Gaps go to a named person.
  6. Submitted claims are tracked through to payment, with rejections and their reasons logged so you can see which item keeps failing.
Evidence itemUsually collectedCollected in our build
Eligibility proofChecked at enquiry, not keptSaved to the claim at enquiry
Install photosWhatever the fitter tookNamed shots requested in the job app
Charger serialTyped from a photoScanned from the barcode
Customer declarationPDF printed and photographedE-signed on the current form
Completeness checkAt submission, by memoryAgainst the scheme list, before submission

We do not interpret the scheme rules for you. Your team, or whoever advises you on the scheme, sets the evidence list. The system makes sure each claim meets it.

What the office sees instead

The Grants To Do folder becomes a list with a status per job: evidence complete, missing items, submitted, queried, paid. Most packs are complete the day after the install, because the fitter collected what was needed while standing in front of the charger. When a rejection does come back, the reason is recorded, and if the same item fails twice, the checklist gets fixed rather than the claim being patched by hand.

Is this your grant backlog?

  • Claims regularly come back asking for something you had at the time.
  • You chase customers for signatures weeks after the install.
  • Nobody knows the total value of unpaid claims today.
  • The evidence list lives on a sticky note or in one person's head.
  • Serial numbers have been mistyped on a claim.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Which grant schemes does this cover?

Whichever ones you claim under. The evidence list is yours to configure per scheme, so it follows the current requirements rather than a version we hard-coded.

Can it submit claims for us?

It prepares a complete pack and tracks the claim. Whether submission can be automated depends on the route the scheme provides; often a person submits and the system logs it.

Our fitters hate paperwork. Will they use it?

The job app asks for a short list of named photos and a barcode scan, in the order they work. That is usually less effort than being phoned a week later.

What affects the cost?

The number of schemes, whether you already have a job app we can extend, and how many systems the claim status needs to reach.

Keep reading

More on Problems We Solve

Start here

Tell us where your chargepoint admin gets stuck

Describe how a charger job moves through your business today, from enquiry to commissioning, and which systems and portals you use. We will tell you what we would build and what we would leave alone, and if a setting in your existing job software would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →