Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Every Plot on a Housing Development Without a Whiteboard?
Problems We Solve

How Do We Keep Track of Every Plot on a Housing Development Without a Whiteboard?

Electricians on housing developments lose track of plots at first fix, second fix or snagging. We build a plot tracker tied to certificates and billing.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

On housing developments, plot status lives on a site office whiteboard and in the supervisor's head, so certificates, snags and payment applications lag behind the work. We build a plot tracker that the site team updates from their phones, which drives certificates per plot, snag lists and your monthly application to the developer.

Plot 37 or plot 47?

Sixty plots, three house types, your team moving between them as the builder releases each one. First fix on some, second fix on others, a few at snagging, two handed over. The supervisor keeps it on a whiteboard in the site cabin and a notebook in his pocket. The office asks for a status update each Friday and gets a photo of the whiteboard.

The developer's handover team wants certificates for plots 41 to 45 by Wednesday. The office isn't sure which of those are actually finished.

By Wednesday, two of those plots turn out to be waiting on a kitchen fitter, and the certificates for the other three are still in the supervisor's notebook.

Why plot status is so slippery

Developments move plot by plot, and each plot passes through several stages that depend on other trades: roof on, plaster done, kitchen fitted, meters in. Status changes daily. The only people who know it are on site, and they record it wherever is quickest.

The office, meanwhile, needs status for three separate things: certificates, snag lists and payment applications. Each one is built from the same missing information.

Stage per plotWhat depends on it
First fix completeStage payment, pre-plaster photos
Second fix completeTesting and certificate
Certificate issuedDeveloper handover pack
Snags raisedReturn visit, sign-off
Handed overFinal application, retention clock

House types help and hinder at the same time. Plots of the same type share a circuit layout, so certificates for them look alike, which makes it tempting to copy one plot's certificate to the next. That is exactly where mistakes creep in, because each plot still needs its own test results and its own address.

What a whiteboard costs

Late certificates hold up the developer's handovers, which they notice. Stage payments are claimed late or for the wrong plots. Snags are lost between visits and come back as complaints. And when your supervisor is off, nobody else can tell what state the site is in.

Developers also run their own snagging and customer care teams, and they notice which trades close snags quickly. A slow or muddled response to snags on one site can affect whether you are invited to price the next phase.

The plot tracker we build

  1. Site setup: each development is set up with its plots and house types, and the stages your team works through.
  2. Phone updates: the supervisor or electrician taps a plot and marks a stage done, with a photo where you want one, such as first fix before boarding.
  3. Certificate queue: plots marked tested go to your certification step, grouped by house type so similar certificates can be prepared together.
  4. Snag list: snags from the developer or your own checks are logged per plot and room, assigned, and closed with a photo.
  5. Application: the monthly application to the developer is drafted from plot stages and your agreed stage values.
  6. Site grid: the office and owner see every plot's status on one screen, updated as the site team works.

We set up the first site with your supervisor, using the house type drawings and the builder's plot release plan, so the tracker matches how the site actually runs from day one.

Everyone looking at the same site

The office no longer waits for a photo of the whiteboard. Certificates are ready as plots finish. Snags close with evidence. Applications match what's been done. And anyone can pick up the site if the supervisor is away.

Handover also becomes easier. When the developer asks for the electrical file for a phase, the certificates, snag closures and photos for each plot are already grouped together, rather than collected from folders and phones at the last minute.

Is your site like this?

  • Plot status is on a whiteboard or in a notebook.
  • The office asks site for updates every week.
  • Developers wait for certificates on finished plots.
  • Snags get lost between visits.
  • Monthly applications are built by counting plots from memory.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it work with the developer's own system?

We can export in the developer's format. Where they have a portal with an upload route, we can send to it.

Is this only for big developments?

It suits any site with more than a handful of plots. Smaller sites can use a simpler version.

Do electricians need to do much?

Tap a plot and a stage, add a photo when asked. That's it.

Can it handle different house types?

Yes. Each house type can have its own stage list and circuit schedule template.

Keep reading

More on Problems We Solve

Start here

Tell us where the paperwork slows your electricians down

Describe the job type, the software you use and who does the admin now. We will tell you what we would automate and what must stay with your qualified supervisor. If your existing software can already do it with better set-up, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →