Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Manage Work We Sub Out to Other Couriers Without Losing Track of Jobs and Paperwork?
Problems We Solve

How Do We Manage Work We Sub Out to Other Couriers Without Losing Track of Jobs and Paperwork?

Couriers sub out jobs via exchanges and phone calls, then rekey them, chase PODs and check the subbie's cover. We build a subcontract job flow in one place.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Subcontracting a same-day job means finding a vehicle, agreeing a price, checking the subcontractor's insurance, passing on the job details, chasing proof of delivery and matching their invoice, usually across an exchange, phone calls and emails. We build a subcontract flow that links each subbed job to your customer's booking, stores the subbie's documents, collects POD through a link, and matches their invoice to the agreed price.

A job you cannot cover

A customer books a van from Bristol to Glasgow for this afternoon. All your drivers are committed. The controller posts it on a courier exchange such as Courier Exchange, gets a bid from a firm they have not used before, rings them, agrees a price, emails the job details and hopes for the best.

At the end of the day nobody has the POD. The customer wants it. The controller chases the subbie by text. Three weeks later the subbie's invoice arrives with a price that does not match what was agreed on the phone, and a waiting charge nobody discussed.

Why subbed work is messy

Subbed jobs sit outside your normal systems. Your own drivers use your app; the subcontractor does not. The job lives on the exchange, in the controller's call log, and in a few emails. Checking that a new subcontractor has the right cover is a manual step that gets skipped in a hurry.

StepHow it usually happens
Find a vehicleExchange posting or ringing round
Agree the priceOn the phone, noted on a pad
Check insurance and credentialsMaybe, if there is time
Pass job detailsEmail or text
Get PODChase by phone after delivery
Match subbie invoiceWeeks later, against memory

What the mess costs

Margins eroded by invoices that do not match the agreed rate. Customers waiting for PODs that you cannot provide. Real exposure if a subcontractor without adequate cover loses or damages goods. And controllers spending their time chasing rather than planning.

It also hides how much work you sub out and to whom, which is useful to know when deciding whether to take on another driver.

Your customer sees none of this. As far as they are concerned, they booked you, and if the subbie turns up late in an unmarked van with no paperwork, it is your name on the complaint. Without the job details and tracking passing through your own system, you cannot give them the same updates they get when your own driver does the work.

And the margin on a subbed job is thin by nature. You are taking a cut between the customer's price and the subbie's, so an extra charge on the subbie's invoice or a missed extra on your customer's can wipe out the whole point of taking the job.

The subcontract flow we build

  1. A 'sub out' action on any job in your system, linking the subcontracted job to the customer's booking.
  2. A subcontractor register holding company details, insurance certificates with expiry dates and any other documents you require, with warnings when something is missing or expired.
  3. Agreed price and terms recorded on the job at the time, and sent to the subcontractor as a written confirmation.
  4. A link for the subbie's driver to update status and capture POD, signature and photos, without installing your app.
  5. POD passed automatically to your customer's tracking or invoice, the same as for your own drivers.
  6. Subcontractor invoice matching against the agreed price, with differences flagged before payment.

Posting and bidding can stay on the exchange you use. The flow picks up once a subcontractor is chosen.

What your controllers get

Subbed jobs visible alongside your own, with POD captured the same way. Subcontractor paperwork checked before a job is given, not after something goes wrong. Invoices that match what was agreed. And a record of which subcontractors are reliable.

Signs subbed work needs this

  • Prices agreed with subcontractors are only on the phone.
  • PODs from subbed jobs are chased by text.
  • You are not sure every subcontractor's insurance is current.
  • Subbie invoices arrive weeks later with surprises.
  • Subbed jobs are not in your main system.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does this replace the courier exchange we use?

No. You keep using the exchange to find vehicles. We handle the job once it is placed.

Do subcontractors need to download our app?

No. They get a secure link for the job, which works in a phone browser.

Can it check insurance certificates?

It stores them with expiry dates and warns you. Whether the cover is adequate for a job is your judgement or your broker's.

What drives the cost?

How your current job system works, how many subcontractors you use and how their invoices arrive.

Keep reading

More on Problems We Solve

Start here

Tell us what is slowing down your courier operation

Describe the problem, the courier software or spreadsheets you use and who deals with it today. We will tell you what we would build, and if your current system or a smaller change would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →