How Can Our Commercial Team Keep Contemporaneous Records That Support a Loss and Expense Submission Later?

Contractor QS teams struggle to build loss and expense submissions from scattered site records. We build daily record capture linked to delay events.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Loss and expense submissions are hard to support because the day-to-day records of resources, delays and instructions are scattered across site diaries, emails and timesheets. We build daily record capture on site, linked to events your team has flagged, so that when your commercial team prepares a submission the records are organised by event and date rather than rebuilt from memory.

Rebuilding the story months later

Your job was held up by late design information for the services, then by a client change to the layout of the upper floors. Your team believes it is entitled to recover some of the cost of the prolonged time on site. The commercial manager starts preparing a submission and needs to show what resources were on site, what they were doing, what was affected and when.

The site diary has entries, but they are short and inconsistent. Labour returns are in a folder. Plant hire invoices are in accounts. Correspondence about the delays is spread across three inboxes. Photos are on the site manager's phone, and he has moved to another job. Putting the story together takes weeks, and some of it cannot be proved.

Why the records do not hold up

  • Site diaries are written at the end of a long day and miss what later matters.
  • Nothing links a day's records to the events that might be claimed.
  • Labour, plant and preliminaries costs sit in different systems.
  • Photos are not dated and located in a way that helps.
  • Notices and correspondence are filed by person, not by event.

Everyone on site knows what happened. The problem is that knowing is not the same as having it written down, organised and dated.

The cost of weak records

We will not advise you on entitlement or how to present a claim, which is for your commercial team and advisers. In practical terms, records that are thin or hard to find make any submission slower to prepare, harder to support and easier to challenge. Commercial staff spend weeks reconstructing, and the outcome can depend on what you happened to keep.

RecordWhere it is nowWhat capture adds
Daily resourcesHandwritten diaryLabour and plant logged by area and activity
Delays and disruptionDiary note, if anyRecorded against a flagged event
PhotosPersonal phoneDated, located, linked to area and event
CorrespondenceIndividual inboxesFiled against the event it concerns
CostsAccounts and timesheetsLinked by date and cost code for the commercial team

The record capture we build

  1. The commercial team sets up events as soon as something happens that may matter later, such as late information, a client change or restricted access.
  2. The site manager completes a short daily record on a phone or tablet: weather, resources by area and activity, what was affected and by which event, with photos.
  3. Labour and plant come from your timesheet and hire records where they are digital, so the site team confirms rather than types.
  4. Emails and letters about an event are filed against it from the project mailbox, with a person confirming the link.
  5. The commercial team sees each event with its daily records, photos, correspondence and linked costs in date order.
  6. Exports produce event chronologies and resource summaries in the format your team or advisers need.

What is claimed, and how, is for your commercial team and advisers to decide. The capture makes sure the records exist and can be found.

Records that are there when you need them

Site managers spend a few minutes a day on a structured record instead of a scrawled diary. Photos stop living on personal phones. When the commercial team needs to prepare a submission, the chronology for each event is already assembled, and the conversation is about what the records show rather than what they might have shown.

The same records help in other ways: answering the client's questions about progress, supporting extension of time discussions, and settling disputes with subcontractors about who was where.

Do your site records hold up?

  • Site diaries are short, handwritten and inconsistent.
  • Photos of delays sit on personal phones.
  • Correspondence about an event is spread across inboxes.
  • Preparing a submission means weeks of reconstruction.
  • Records have been lost when a site manager moved on.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Is this a claims service?

No. We build the record-keeping. Preparing and presenting any claim is for your commercial team and advisers.

Will site managers use it?

It is designed for a few minutes a day on a phone, with choices rather than typing. We test it with your site team before it goes wide.

Can it read our timesheet and plant hire data?

Where those systems have exports or APIs, yes. Otherwise the site team records resources directly.

What affects the cost?

The number of sites, which systems to connect, and whether offline use is needed.

Keep reading

More on Problems We Solve

Start here

Tell us where your commercial records let you down

Describe the records your surveyors keep, where they live and what goes missing. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so. Contractual judgement stays with your team and advisers.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →