How Do We Stop Tenant Fit-Out and Alteration Requests Sitting for Weeks in Our Office?

Commercial landlord tenant fit-out approvals stall between surveyors, M&E and solicitors. We build a request tracker that shows every stage and who holds it.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Fit-out approvals stall because a tenant's request needs drawings reviewed by your building surveyor, M&E consultant and sometimes insurer, then a licence from your solicitor, and nobody holds the whole chain. We build a fit-out request tracker with a tenant submission form, a checklist of the reviews your process requires, a clear owner and status at each step, and a record of the approved works against the unit for later.

A tenant waiting to start works

The tenant on the third floor wants to put in meeting rooms, a kitchen and extra power for a server cupboard. Their fit-out contractor has a start date. They sent drawings to the property manager, who forwarded them to the building surveyor, who asked the M&E consultant about the extra load on the distribution board. The M&E consultant asked for more detail. The tenant's contractor sent it to the wrong person. Two weeks pass.

Then the tenant's director calls the asset manager to ask why the landlord is holding up their move. The asset manager does not know where the request is either.

Why fit-out requests get lost between people

Approving tenant works in a multi-let building touches several people outside your office, each doing their own part in their own inbox. Nobody on the landlord side is holding the list of what has been received, reviewed, queried and approved.

  • Submissions arrive by email with drawings attached, often incomplete.
  • Each consultant reviews a different part and replies separately.
  • Queries go back to the tenant's contractor, not always via the landlord.
  • The solicitor is instructed once reviews finish, but nobody tells them when that is.
  • Conditions such as working hours, permits and reinstatement are agreed but not recorded where the building manager sees them.

Your leases and your advisers decide what needs consent and on what terms. What goes wrong is the admin around those decisions.

What slow approvals cost

Tenants start their relationship with you frustrated, and some start works without consent because they cannot wait. The building manager finds contractors on site with no record of what was agreed. Consultants' fees rise when they review the same drawings twice. And at the end of the lease, nobody can say what the tenant was allowed to install or must remove, which feeds straight into dilapidations.

The fit-out tracker we build

  1. Tenants or their contractors submit requests through a form that asks for the drawings, specifications, programme, contractor details and insurances your process needs. Incomplete submissions are sent back automatically with a list of what is missing.
  2. Each request gets a checklist of reviews based on the type of works: building surveyor, M&E, fire strategy, insurer, structural, whatever your process sets.
  3. Each reviewer receives the pack with one link and records their response, queries or conditions against the request. Queries to the tenant go out from the request, so the history stays together.
  4. When reviews are complete, the solicitor is instructed from the tracker with the approved drawings and conditions attached.
  5. Conditions such as working hours, permits to work and reinstatement are published to the building manager's view for that unit.
  6. Approved works, drawings and licences are stored against the unit record, ready for reletting and lease end.
StageOwnerWhat the tenant sees
Submission checkedProperty managerReceived, or what is missing
Technical reviewsYour consultantsIn review, or queries raised
LicenceYour solicitorWith solicitors
Works on siteBuilding managerApproved, with conditions
CompletionBuilding surveyorSigned off

How the building runs differently

The tenant can see where their request is without calling. Your team can see every live request, what stage it is at and who is holding it. Consultants receive a complete pack. The building manager knows what has been approved before contractors arrive. Years later, the unit record shows exactly what was put in.

Leasing notices a difference too. When a prospective tenant asks how long consent for a typical office fit-out takes in your building, your team can describe the steps clearly and show a new tenant the form on day one, rather than promising to find out.

Is this your situation?

  • Tenants chase you about fit-out approvals.
  • Drawings arrive incomplete and go back and forth.
  • You cannot say where each request is.
  • Contractors turn up before consent is in place.
  • Approved alterations are not recorded against the unit.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does this decide whether consent is needed?

No. Your leases and advisers decide. The tracker runs the process you set for each type of request.

Do our consultants need a new login?

They can respond through a secure link, or the tracker can work alongside email if that suits them better.

Can tenants see progress?

Yes, a simple status view shows where their request is, without exposing your internal notes.

What affects the cost?

The number of buildings, the variety of request types and whether we connect to your unit records and document store.

Keep reading

More on Problems We Solve

Start here

Tell us which landlord requests pile up

Describe the requests, reports and approvals your team handles, and the systems and advisers involved. We will tell you where software helps and where it is a decision for your people, and if the fix is simpler than a new build, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →