Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Check and Manage the Reefer Hauliers We Subcontract To, Load by Load?
Problems We Solve

How Do We Check and Manage the Reefer Hauliers We Subcontract To, Load by Load?

Cold chain firms hand loads to subcontract reefer hauliers with little checking or data back. We build onboarding, document checks and load records.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

When your own fleet is full, loads go to subcontract reefer hauliers, often arranged by phone with little record of their documents, equipment or what happened on the load. We build a subcontractor register with document expiry tracking, a job link for each load that collects the driver's times, readings and POD, and a check of their invoices against agreed rates.

A busy Friday, three loads given out by phone

Your own fleet cannot cover the peak, so the planner rings the usual subcontractors. One takes two loads, another takes one. Rates are agreed on the phone, collection details are emailed, and off they go.

Is their goods in transit insurance current? Is the trailer's unit working and recently serviced? What temperature did the load travel at? When did it actually arrive? The planner will find out, perhaps, when the subcontractor's invoice arrives a month later, or when your customer asks.

Why subcontracted loads become a blind spot

Subcontracting is done under time pressure, and the checks that matter take time. The relationship is usually good, which makes it easy to assume everything is fine.

  • Subcontractor documents, such as insurance and licences, are checked once and never again.
  • Equipment details, such as unit type and service status, are not recorded.
  • Load details go by email or phone, not through your systems.
  • Temperature data and POD come back late, if at all.
  • Invoices are not checked against the rate agreed on the phone.

What the blind spot costs

If something goes wrong on a subcontracted load, you are usually still answerable to your customer, but with less information than for your own loads. Expired insurance or documents can leave you exposed in ways your adviser should explain. Invoices paid without checking can drift above the agreed rate.

How we bring subcontractors into your process

  1. Each subcontractor is set up in a register with their company details and the documents you require, such as insurance certificates and any accreditations, with expiry dates tracked and reminders sent to them before expiry.
  2. Their trailers and units are recorded, with any service information they provide.
  3. When a load is given out, the subcontractor receives a job link with collection and delivery details, set point, slots and references, and the agreed rate is recorded.
  4. Their driver uses the link to confirm collection and delivery times, record set point and readings, add photos and capture the POD.
  5. If the subcontractor's units have telematics, their data can be shared for the load, subject to their agreement.
  6. Their invoice is checked against the agreed rate before payment, and differences are flagged.
CheckWhen
Documents in dateBefore a load is given, with reminders ahead of expiry
Equipment suitableRecorded at onboarding and per load
Load details sentThrough the job link
Times, readings and PODReturned through the job link
InvoiceChecked against agreed rate

Which documents you require and what cover is adequate are decisions for you and your insurer or adviser. We track what you decide.

What subcontracting looks like after

The planner can only give a load to a subcontractor with documents in date. Subcontracted loads have times, readings and a POD like your own. Customers see no difference in the information they receive. Invoices are checked in minutes.

It also makes choosing subcontractors fairer. Over time you can see which ones return complete records, arrive on time and invoice at the agreed rate, which is useful when the busy season comes and you have to decide who gets the work first.

Are subcontracted loads a blind spot?

  • Loads are given out by phone with no central record.
  • Subcontractor documents are not rechecked.
  • You rarely get temperature data for subcontracted loads.
  • POD arrives with the invoice weeks later.
  • Invoices are paid without checking the agreed rate.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will subcontractors accept this?

Most prefer a clear job link to phone calls and emails. It needs nothing installed.

Can we see their telematics?

Only if they agree and their provider allows sharing. Otherwise the driver records readings or photographs the display.

Does this check their insurance is adequate?

No. It tracks that the documents you require are present and in date. Adequacy is for you and your adviser.

What drives the cost?

The number of subcontractors, how loads are given out today and whether invoices are checked automatically.

What do you need from us?

Your list of subcontractors, the documents you ask for and a sample of recent subcontracted loads and invoices.

Keep reading

More on Problems We Solve

Start here

Tell us where your cold chain operation leaks time or money

Describe the problem as it happens on your docks, in your stores or in the transport office, and which systems you already run. We will tell you what we would build and what we would leave alone. Your quality team and your customers keep every product safety decision.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →