Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop Spending the First Week of Every Month Building Customer Performance Reports?
Problems We Solve

How Do We Stop Spending the First Week of Every Month Building Customer Performance Reports?

Cold chain account managers build monthly KPI packs from several systems by hand. We build reports on time, in full and in temperature automatically.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Cold chain customers expect a monthly performance pack: on-time delivery, in-full, temperature record completeness, rejections, claims and sometimes storage accuracy, and account managers build it by hand from the transport system, telematics, PODs and spreadsheets. We build the pack automatically from those sources, with the definitions agreed with each customer, so account managers spend their time explaining the numbers rather than making them.

The first week of the month, lost to spreadsheets

Each major customer has a monthly review. Before it, the account manager builds the pack: deliveries on time against slot, deliveries in full, loads with a complete temperature record, rejections and reasons, claims, and for storage customers stock accuracy and pick errors.

The data comes from the transport system, the telematics portal, the POD system, the claims spreadsheet and the WMS. Each has its own export. The account manager pastes, cleans, calculates and formats. Definitions shift slightly from month to month depending on who builds it. The customer occasionally asks why their figure for on-time differs from yours.

Why KPI packs are a manual job

The data exists in several systems, each built for its own purpose, and nothing joins them up around the customer.

  • Each KPI draws from a different system.
  • Definitions, such as what counts as on time, are not written down.
  • Customers use their own definitions, which may differ from yours.
  • Exceptions, such as a late slot caused by the customer, need explaining by hand.
  • The pack is rebuilt from scratch each month.

What manual KPI packs cost

Days of account manager time every month, across every major customer. Inconsistent figures that undermine trust. Reviews spent arguing about numbers rather than improving service. And a late view of problems, because performance is only calculated once a month.

How we build the pack from the source systems

  1. We connect to the transport system, POD, telematics, WMS and claims records, and bring the relevant data together per customer.
  2. KPI definitions are agreed and written down with each customer: what counts as on time, in full, temperature complete, and how exceptions are treated.
  3. The KPIs are calculated daily, so account managers see how the month is going before it ends.
  4. Exceptions caused by the customer, such as late product at collection or a depot that moved the slot, are recorded on the job and shown separately, with evidence.
  5. The monthly pack is produced automatically in the customer's preferred layout, with charts and a list of failures and their causes.
  6. Customers can have a live view, if you want to offer one.
KPISource
On time against slotTracking and POD times against bookings
In fullPOD quantities against orders
Temperature record completeTelematics data per load
Rejections and claimsRejection and claims records
Stock and pick accuracyWMS counts and pick errors

The definitions are agreed between you and each customer. We calculate them consistently and show the working.

What a monthly review looks like after

The pack is ready on the first working day. The account manager spends the time before the review looking at the failures and what caused them. Figures are consistent from month to month and match what the customer sees in their live view. Problems are visible during the month, while there is still time to fix them.

Internal meetings benefit from the same data. Operations managers can see performance by depot, shift and lane rather than by customer, which is often where the real causes of late or incomplete deliveries show up.

Are KPI packs taking over your month?

  • Account managers build KPI packs by hand every month.
  • Data comes from several systems and exports.
  • Customers dispute your figures.
  • Definitions change depending on who builds the pack.
  • You only see performance once the month is over.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can each customer have different definitions?

Yes. Definitions are set per customer, so each pack matches what was agreed with them.

Does it need a data warehouse?

Not necessarily. For most cold chain operators a modest reporting database fed from the source systems is enough.

Can customer-caused failures be excluded?

They can be shown separately with evidence, in whatever way you and the customer agree.

What drives the cost?

The number of source systems and customers, and how different their definitions and layouts are.

What do you need from us?

A recent KPI pack for a few customers, access to the source systems and the definitions you use now.

Keep reading

More on Problems We Solve

Start here

Tell us which cold chain job eats your office's week

Describe the task, where the data for it lives today and who does it. We will tell you what we would build and what we would leave alone, and if your current warehouse or transport system can already do it with the right settings, we will say so. Your quality team keeps every product safety decision.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →