Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop Parts Being Machined to an Out of Date Drawing Revision?
Problems We Solve

How Do We Stop Parts Being Machined to an Out of Date Drawing Revision?

Parts machined to a superseded drawing revision mean scrap, remakes and an unhappy customer. We build revision control that ties each job to the right issue.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Wrong revision jobs happen because drawings arrive by email, get printed, and live in several places at once, so the copy on the machine is not always the copy on the order. We build a drawing register that links each purchase order line to one controlled revision, flags mismatches when orders arrive, and puts only the current issue in front of the setter.

A full batch, beautifully made, to revision C

The parts pass inspection against the drawing in the job folder. They are packed, the C of C is signed and they go out. Two days later the customer's goods in rejects the lot, because the order said revision D. The bore moved, or a chamfer was added, or the material changed. Revision D was emailed to sales a month ago and never made it to the shop floor.

Now there is a remake to fit in, material to reorder and a conversation about who pays.

Where the revision gets lost

Most shops do have a drawing folder. The trouble is that there are copies everywhere else too: in the estimator's quote folder, printed in the job pack, saved on the CAM workstation, taped to a machine, and in the customer's portal. When a new issue arrives, some of those copies get updated and some do not.

  • The revision on the purchase order is not compared against the drawing on file when the order is entered.
  • Repeat orders are run from the old job pack without checking for a newer issue.
  • CAM programs are named by part number only, not by revision.
  • Printed drawings are not withdrawn when a new issue comes in.
  • Engineering changes arrive as an email with a marked up PDF, not a formal new revision.

What each wrong revision costs

The obvious cost is the scrapped batch and the machine time to make it again. Behind that is the late delivery on the remake, the time spent on the nonconformance report, and a black mark on your supplier rating with that customer. For work going into regulated sectors, the customer may also want to know how it happened and what you have changed.

Revision control we build around your orders

  1. A drawing register holds every customer drawing with its part number, revision, date received and status: current, superseded or awaiting review.
  2. When a purchase order arrives, the part number and revision on each line are read and compared with the register. A mismatch, or a revision you have never seen, is flagged before the job is created.
  3. Each job is locked to one drawing revision. The job pack, the inspection plan and the traveller all pull from that single file.
  4. New revisions trigger a check list of what else needs updating: CAM program, setup sheet, fixture, inspection plan, open jobs and open quotes.
  5. On the shop floor, a tablet or screen at each cell shows the drawing for the job by scanning the traveller, so the setter is not relying on a printed copy.
  6. Superseded revisions stay on record for traceability but are clearly marked and cannot be attached to a new job.
MomentWhat the register checks
Order receivedPO revision matches the current drawing
Repeat orderWhether a newer issue has arrived since last time
New revision receivedOpen jobs, quotes and programs affected
Job set upSetter sees the locked revision only
Final inspectionReport references the same revision

What the shop floor gets

The setter scans the job and sees one drawing, the right one. The office sees at order entry that the customer has quoted a revision you do not have, and can ask for it before any metal is cut. When a new issue lands, someone is prompted to check whether the program and the fixture still fit, rather than finding out at first off.

You also end up with a clean history of which revision every past job was made to, which is what a customer audit tends to ask for.

Is revision control your weak spot?

  • Printed drawings live at the machines.
  • CAM files are named without a revision.
  • You have had a batch rejected for being made to an old issue.
  • Repeat orders are run straight from the last job pack.
  • Engineering changes arrive as marked up PDFs in someone's inbox.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do we have to stop using printed drawings?

Not necessarily. Printed copies can carry the revision and a job barcode, and the register records which job they belong to. Screens at the cells simply reduce how many loose copies exist.

Can it connect to our CAM software?

We can check program file names and folders against the register. Direct integration depends on the CAM package, and we will tell you what is realistic for yours.

What about customers who send changes informally?

Informal changes are logged as awaiting review, and the job stays blocked until someone confirms with the customer whether it is a formal revision.

Will it replace our quality system?

No. It supports the document control your own quality procedures set out. Your quality manager decides the rules; the tool enforces them.

Keep reading

More on Problems We Solve

Start here

Tell us where the machine shop office loses time

Describe how a job moves from RFQ to dispatch today, which systems you run and where the paperwork piles up. We will tell you what we would build and what we would leave alone, and if a change inside your existing MRP or spreadsheets would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →