How Do We Decide Which Job Goes on Which CNC Machine Without the Production Manager's Whiteboard?

CNC machine loading done on a whiteboard hides clashes until a job is late. We build a loading board that knows each machine's capability, setups and due dates.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Machine loading lives on a whiteboard because generic scheduling tools do not know that only one machine has the fourth axis, that the sliding head needs a bar feeder change, or that two jobs share a fixture. We build a loading board that holds each machine's real capabilities and your setup groupings, shows due date clashes early, and lets the production manager drag jobs while it checks the constraints.

The plan is in one person's head and on one wall

The whiteboard by the office door has a column for each machine and magnets for each job. The production manager moves them around every morning based on who is in, what material has arrived and which customer rang yesterday. It works, mostly. Then the production manager is off for a week and nobody else can read it.

Or a rush job arrives, gets squeezed onto the five axis, and the job that was already there slides a week without anyone telling the customer.

Why the scheduling module in your MRP sits unused

Most MRP systems can schedule, in theory. In practice they treat machines as interchangeable work centres with a number of hours per day. A subcontract machine shop does not work like that. The job that fits on the Mazak will not fit on the smaller vertical, the long shaft needs the lathe with the tailstock, and running two jobs with the same soft jaws back to back saves a whole setup.

  • Machine capabilities are not recorded: axes, travel, spindle speed, bar capacity, probing.
  • Setup time depends on the job before, not just the job itself.
  • Material arrival, tooling and outside processing dates are not visible to the plan.
  • Operator skills limit which machine can run on which shift.
  • Due dates change and nobody sees the knock on effect.

What it costs to plan by memory

Late deliveries that could have been seen coming weeks earlier. Machines left idle because the next job's material has not arrived. Setups repeated that could have been grouped. And a production manager who spends the first hour of every day replanning, and cannot take a holiday without the shop drifting.

The loading board we build

  1. Each machine is described properly: type, axes, working envelope, bar capacity, tool magazine size, probing, pallets, and which operators can run it.
  2. Each job, pulled from your MRP or job list, carries its operations, the machines able to do each one, estimated setup and cycle time, material status and due date.
  3. The board shows machines as rows and time as columns. Jobs are dragged into place, and the board refuses or warns when a job is put on a machine that cannot do it or when material will not be there in time.
  4. Jobs that share a fixture, soft jaws or material are highlighted, so the manager can group them to save setups.
  5. Any job that will finish after its due date shows in red the moment the plan changes, with a list of which customers are affected.
  6. Operators see their own machine's queue on a screen or tablet, in the order the manager set.
ConstraintHeld in the board
Machine capabilityMachine record: axes, envelope, bar size
Setup groupingShared fixtures, jaws and material flagged
Material readyLinked to purchase orders and goods in
Outside processingExpected return date from the processor
Operator skillsWho can set and run each machine

We do not try to replace the production manager's judgement with an optimiser. The board does the checking; the person decides.

How the mornings change

The plan can be read by anyone. When a rush job comes in, you can see which jobs move and by how much before you say yes to it. Material shortages show up days ahead instead of at the machine. Customers whose parts will be late get a call before they have to make one.

Is your machine loading held together by one person?

  • The schedule is a whiteboard, a spreadsheet or a notebook.
  • Nobody else can plan when the production manager is away.
  • Rush jobs push other work late without anyone noticing.
  • Machines stand idle waiting for material or tools.
  • Your MRP's scheduling screen has never been used.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it schedule automatically?

It can suggest a loading, but most machine shops prefer to plan by hand with the board checking constraints. We build whichever suits the way you work.

Will it work with our MRP?

Yes, where the MRP can share jobs and operations through an API, a database connection or an export. Changes can be written back if the system allows it.

What if our cycle times are guesses?

They usually are at first. The board can use actual times from the shop floor as they are recorded, so the plan gets more accurate over time.

Can operators update progress?

Yes, with a scan or a tap at the machine, which moves the job along on the board.

Keep reading

More on Problems We Solve

Start here

Tell us where the machine shop office loses time

Describe how a job moves from RFQ to dispatch today, which systems you run and where the paperwork piles up. We will tell you what we would build and what we would leave alone, and if a change inside your existing MRP or spreadsheets would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →