Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop Rewriting the Same Charity Information for Every Grant Application?
Problems We Solve

How Do We Stop Rewriting the Same Charity Information for Every Grant Application?

Charity bid writers rewrite the same history, outcomes and budgets for every grant application. We build a content library that drafts from approved text.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Grant applications ask for the same things in different words: your history, need, outcomes, governance and budget. We build a content library of approved, dated answers and supporting figures, and a drafting step that maps each funder's questions to that library, so the bid writer starts from checked material and spends their time on what is new.

Another portal, the same eleven questions

The bid writer, who is also the office manager two days a week, opens a new application. Describe your organisation in 250 words. What need does this project address? How will you measure outcomes? Describe your safeguarding arrangements. Provide a budget. They have answered every one of these questions before, for other funders, with different word limits.

So they search the shared drive for the last application, find three versions of the organisation description, and are not sure which figures in them are still current. The beneficiary numbers came from an old annual report. The safeguarding answer mentions a lead who left. By the time the answer is rewritten and checked, half the week has gone and the actual project description, the part that wins or loses the grant, gets what time is left.

Why every bid starts from a blank page

Past applications are stored as finished documents, not as reusable parts. Reusing them means untangling which bits are still true.

  • Answers are scattered across Word files, portal copies and emails, with no approved version.
  • Figures such as beneficiary numbers and income go out of date, and nobody tracks when.
  • Each funder has different word limits, so the same answer is cut down differently each time.
  • Policies and named contacts change, and old answers keep describing the previous arrangement.
  • Nobody records which answer went to which funder, or which bids succeeded.

The underlying gap is that the charity's standard information has no owner and no review date.

What the rewriting costs

For a small charity, bid writing capacity is often the limit on how much funding you apply for. Every hour spent reassembling the standard sections is an hour not spent on the project itself or on another application.

There is also accuracy risk. Out-of-date figures and names end up in applications, and inconsistent numbers across funders can raise questions, especially when the same funder sees several of your bids. Deadlines are missed because applications take longer than expected to pull together.

How we build the application library

  1. We gather your past applications, annual reports and policies, and break them into reusable answers by topic: history, need, outcomes, governance, safeguarding summary, finances, partnerships.
  2. Each answer has an owner, an approval date, a review date and versions at common lengths, for example 100, 250 and 500 words.
  3. Figures used in answers, like beneficiaries supported or volunteers active, are held as named values with a source and date, and appear in answers from there.
  4. When a new application arrives, its questions are pasted or uploaded, and a language model proposes which library answers fit each question and trims them to the word limit.
  5. The bid writer reviews every proposal, edits, and writes the project-specific parts, with the relevant library material shown alongside.
  6. The final submission is saved with which answers were used, the funder, the date and later the outcome.
  7. Answers past their review date are flagged to their owner, so stale text stops being reused.
Library itemOwnerWhy it matters
Organisation description, three lengthsDirectorUsed in almost every application
People supported last yearOperations leadSource and date shown, updated once
Safeguarding summarySafeguarding leadReview date prevents old names reappearing
Outcomes frameworkProject leadsConsistent across funders

The library speeds up the standard parts. The case for a specific project still needs to be written by people who know it.

Writing a bid afterwards

A new application opens with most standard questions already drafted from approved text at the right length. The bid writer checks them, adjusts tone for the funder, and spends the bulk of their time on the project need, the plan and the budget narrative. Figures match across every bid because they come from one place.

When the director asks what you told a funder two years ago, the answer is a search away, along with whether that bid succeeded.

Is your bid writing like this?

  • Standard sections are copied from the last application you can find.
  • You are not sure which version of the organisation description is current.
  • Out-of-date figures or names have gone into a submitted bid.
  • There is no record of what was sent to which funder.
  • Applications take longer than planned because the basics are rebuilt each time.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will the tool write whole applications?

It drafts the standard sections from your approved answers. The project case, and the judgement about what a funder needs to hear, stay with your team.

Can it work with funder portals?

Most portals have no API, so the finished answers are copied in. The library makes those answers quick to prepare and consistent.

What do we need to provide?

Past applications, recent annual reports and current policies are enough to build the first version of the library.

Who keeps the library up to date?

Each answer has a named owner and review date, and owners get a prompt when their answer is due for review.

Keep reading

More on Problems We Solve

Start here

Tell us how your volunteers and bids are organised now

Describe the roles, rotas, forms and spreadsheets involved, and who keeps them up to date. We will say what we would build and what we would leave alone, and if a volunteer management tool you could subscribe to would suit you better than a build, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →