Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop Our Contract Sites' Temperature and Cleaning Records Living on Paper in Each Kitchen?
Problems We Solve

How Do We Stop Our Contract Sites' Temperature and Cleaning Records Living on Paper in Each Kitchen?

Contract caterers keep fridge, delivery and cleaning check sheets on paper at each site. We move them onto phones with reminders and a head office view.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Each contract catering site keeps its daily kitchen checks, like fridge temperatures, delivery checks and cleaning sign-offs, on paper sheets in a folder. Head office cannot see gaps until an audit or visit. We move the checks your procedures already require onto a phone or tablet at each site, with reminders when they are due and a head office view of what is missing. Your food safety management system decides what is checked; we just record it reliably.

The folder on the kitchen shelf

Every site has a folder. In it, daily sheets for fridge and freezer temperatures, delivery checks, hot holding records if they apply, cleaning schedules and opening and closing checks. The site team fills them in, mostly.

When the area manager visits, they flip through and find a few blanks from a busy Wednesday, a sheet completed in one handwriting at the end of the week, and a note about a fridge that was reading high which has no follow-up recorded. Head office has no idea until the visit, and a visit to each site happens only every few weeks.

Paper is invisible from head office

The checks themselves are usually well designed. The problem is that paper records can only be seen by someone standing in the kitchen, and only after the fact.

  • Nobody is reminded when a check is due; people remember, or do not.
  • Missed checks are discovered at the next visit or audit.
  • Readings out of your set range are written down, but the corrective action may not be.
  • Sheets get damaged, lost or filled in retrospectively.
  • Every site's folder is slightly different, so comparing sites is hard.

None of this means the kitchens are not doing the work. It means head office cannot show it, or spot a site that is struggling, without driving there.

Staff turnover makes paper harder still. A new kitchen assistant is shown the folder on their first day, and learns the checks from whoever is on shift. If that person fills sheets in at the end of the day, so will the new starter.

Why this matters to a contract caterer

Your clients expect you to manage your kitchens properly, and many ask for evidence at contract reviews. Inspectors and auditors look at records. A folder with gaps is hard to defend, even when the work was done.

There is also the everyday risk that a fridge problem goes unnoticed because the person who recorded a high reading assumed someone else would deal with it. Your own procedures say what happens next; paper cannot make sure it does.

Digital checks on the procedures you already have

  1. We set up the checks your food safety management system requires at each site, in the order and at the times they are due. We do not decide what the checks are.
  2. Site staff complete them on a shared tablet or phone. Each entry records who did it and when.
  3. Reminders appear when a check is due, and the site manager is notified if it is missed.
  4. When a reading is outside the range your procedures set, the form asks for the corrective action your procedures describe, and the manager is notified.
  5. Where you use wireless temperature probes, readings can be recorded automatically, with staff still signing off the checks your procedures require.
  6. Head office sees a dashboard of every site: checks completed, missed and out of range, with the records ready to export for an audit or client review.
CheckPaper todayDigital
Fridge temperaturesWritten twice dailyRecorded with reminder, out-of-range prompts action
Delivery checksTicked on the delivery noteRecorded against the supplier and order
Cleaning scheduleInitials on a sheetSigned off by task, missed tasks flagged
Opening and closingChecklist in the folderCompleted on the tablet with time

The content of every check comes from your procedures and your advisers. We make them easier to complete and impossible to lose.

What changes for sites and head office

Site teams get prompted at the right time and stop filling in sheets at the end of the week. Site managers see what is outstanding before it becomes a gap. Head office sees all sites on one screen and can call the site with a missed check the same day instead of finding it weeks later.

For client reviews and audits, you export the records for the period instead of photocopying folders. Area manager visits can focus on the kitchen rather than the paperwork.

Is this your situation?

  • Kitchen checks are recorded on paper in each site's folder.
  • Head office sees missed checks only at visits or audits.
  • Corrective actions are not always written down.
  • Clients ask for evidence and you gather it by hand.
  • Each site's paperwork looks a bit different.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do you tell us what checks to do?

No. The checks come from your food safety management system and your advisers. We put them on a screen with reminders.

Do we need wireless temperature probes?

No. Staff can record readings manually. Probes are an option for sites that want them.

What if the kitchen has poor signal?

The app stores entries on the device and sends them when it reconnects.

Can each site have different checks?

Yes. Checks are set per site, so a site with hot holding has those checks and one without does not.

What drives the cost?

The number of sites and checks, whether probes are involved, and how much head office reporting you want.

Keep reading

More on Problems We Solve

Start here

Tell us how your contract sites report back to you

Describe your sites: how many, what each one sends you every week, which tills, ordering and payroll systems they use and what gets retyped at head office. We will tell you what we would connect, and if a better spreadsheet would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →