How Can We Understand Our Key-to-Key Cycle Time Before the Work Provider's Scorecard Tells Us It Is Slipping?

Bodyshops learn their key-to-key and cycle times from work provider scorecards. We build a report that shows where each job's days went, stage by stage.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Work providers score bodyshops on measures like key-to-key time and repair cycle time, and many shops first see their figures in the provider's monthly report. We build your own cycle time report from your job data, showing how many days each job spent in each stage, so you can see where time goes and act before the scorecard arrives.

The scorecard says you are slow, but not why

The monthly scorecard from one of your insurer work providers shows your average key-to-key time has gone up and you are now below their target. The account manager wants to talk about it. You look at the figure and wonder which jobs caused it, and why. Was it parts? Authorisations? The paint booth being down for a week? A few heavy repairs?

The provider's report gives the outcome. It rarely gives the reasons, and it arrives weeks after the jobs finished.

Stage times exist, but nobody adds them up

Your management system records when jobs change status, at least some of the time. The data for a cycle time breakdown is mostly there. What is missing is anyone turning it into a view of where the days went: waiting for authorisation, waiting for parts, in the workshop, waiting for a sublet, waiting for collection.

  • Each work provider defines key-to-key and cycle time slightly differently.
  • Statuses are not always updated on the day, which makes stage times unreliable.
  • Blocked time (parts, authorisation) is mixed in with working time.
  • Reports are run occasionally, by hand, in a spreadsheet.

Take one job: the car arrives on a Monday, authorisation takes until Thursday, parts arrive the following Tuesday, the repair takes three working days, and the customer collects the Monday after. Only a small part of that was spent being worked on. The scorecard shows the total; your own report should show each piece.

Why it matters to see it first

Work providers use these measures to judge repairers. A shop that can explain its figures with evidence, and show what it is doing about them, has a better conversation than one that is surprised by them. Some of the causes sit with the provider itself, such as slow authorisations, and those are worth raising with data.

Internally, a cycle time view shows where to put effort. Speeding up the workshop helps little if most of the days are spent waiting for parts.

How we build a cycle time report

  1. We read job status history from your management system, and fill gaps from other sources such as parts receipts, authorisation dates and handover records.
  2. Each job is broken into stages you recognise: waiting authorisation, waiting parts, in workshop, waiting sublet, ready awaiting collection.
  3. Key-to-key and cycle time are calculated using each work provider's own definition, so your figures line up with theirs.
  4. Weekly views show averages and the slowest jobs, with the stage that took longest highlighted.
  5. Jobs likely to breach a provider's target are flagged while they are still open, not after they have finished.
  6. Reports can be filtered by work provider, repair size and month.
StageUsually driven byWho can act
Waiting authorisationEngineer and provider responseFront office, provider
Waiting partsSupplier availabilityParts person, supplier
In workshopLoading and capacityWorkshop controller
Waiting subletSublet supplier diariesController
Awaiting collectionCustomer availability, excessFront of house

A different conversation with the account manager

When the scorecard arrives, you already know the figure and the reasons. You can show that most of the extra days were in authorisation, or that three heavy repairs with back-ordered parts skewed the average. Inside the shop, the weekly view tells you which stage to work on next.

Status updates also improve, because people can see what the data is used for.

The report also helps with decisions that are not about any single provider: whether to hold more stock of common parts for makes you see often, whether an extra painter would shorten the queue, or whether waiting for customers to collect finished cars is adding more days than you realised.

Is this your situation?

  • You find out your cycle time from the provider's scorecard.
  • You cannot say which stage adds most days to a typical repair.
  • Different providers' figures do not match your own.
  • Reports are built by hand in a spreadsheet, occasionally.
  • Jobs breach targets without anyone noticing in time.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will our figures match the work provider's?

We calculate each provider's measures using their definitions as you give them to us. Small differences can remain because of timing and data they hold that you do not, and the report shows how each figure is worked out.

What if our statuses are unreliable?

We use other evidence, such as parts receipts and handover records, to fill gaps, and we show where data is thin. Better status habits usually follow once people see the report.

Can we share the report with providers?

Yes, if you choose. It can be exported per provider.

What drives the cost?

Access to your management system's history, the number of providers and definitions, and how often you want the report.

What do you need from us?

An export of job history, each provider's measure definitions and a recent scorecard for comparison.

Keep reading

More on Problems We Solve

Start here

Tell us where jobs stall in your bodyshop

Describe how a job moves through your bodyshop today, from the first notification to the customer driving away, which work providers you repair for and which estimating and management systems you use. We will tell you what we would build and what we would leave alone, and if a setting in your existing system already does it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →