Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Fire, Lift and Water Checks Across Every Block We Manage?
Problems We Solve

How Do We Keep Track of Fire, Lift and Water Checks Across Every Block We Manage?

Block management firms track fire alarm, lift, water and lighting checks in spreadsheets. We build a checks calendar that chases evidence and flags gaps.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Each block has its own list of recurring checks and servicing, such as fire alarm testing, emergency lighting, lift inspections and water hygiene, done by different contractors at different intervals. We build a checks calendar per block that holds the schedule your own policy and advisers set, collects the evidence from contractors, and flags anything overdue or missing before it becomes a problem.

The spreadsheet with a tab for every block

Somewhere in your office is a spreadsheet with a tab per block and a row per check. Fire alarm service, emergency lighting test, lift thorough examination, water risk assessment, dry riser test, fire risk assessment review. Some cells are green, some red, many blank because nobody has updated them.

When a director or an insurer asks for evidence that the checks are up to date, someone opens the spreadsheet, discovers it is out of date, and starts emailing contractors for certificates.

Why checks slip even when contractors turn up

Often the check has been done. The contractor visited, tested and left. What is missing is the evidence reaching you and the record being updated. Certificates arrive by email to whoever booked the job, sit in their inbox and never make it to the spreadsheet.

The schedule itself is also messy. Each block has different equipment, different contractors and different intervals, and those change when equipment is added or a contract is retendered. A spreadsheet has no way to notice that a check expected last month never happened.

The cost of not knowing

We will not advise on what each building needs; that belongs to your fire risk assessor, insurers and advisers. The practical cost of not knowing is clear enough: time spent reconstructing records, evidence that cannot be produced when asked, and checks that genuinely lapse because nobody noticed they were missed.

It also leaves your firm exposed when a property manager leaves, because the knowledge of what each block needs often goes with them.

The checks calendar we build

We build a calendar per block that knows what should happen, collects proof that it did, and chases when it has not.

  1. Check schedule: for each block, the checks and intervals are set up from your own policy and your assessors' recommendations. We do not decide them.
  2. Contractor links: each check is linked to the contractor responsible, who receives a reminder when it is due.
  3. Evidence capture: contractors upload certificates or reports through a link, or email them to a dedicated address. A document model reads the date and type and files it against the right check.
  4. Overdue alerts: if no evidence arrives by the due date, the property manager is alerted, then their manager if it stays open.
  5. Actions from reports: where a report lists remedial actions, these are extracted into a list for the property manager to review and raise as jobs.
  6. Evidence pack: a current record of every check per block, with documents attached, can be produced on request for directors or insurers.
Example checkUsually evidenced byTracked as
Fire alarm serviceContractor's service reportRecurring, with evidence required
Emergency lighting testTest log or reportRecurring, with evidence required
Lift inspectionInspection reportRecurring, with actions extracted
Water hygieneAssessment and monitoring recordsRecurring, with actions extracted
Fire risk assessment reviewAssessor's reportReview date, with actions extracted

What your compliance picture looks like after

The spreadsheet disappears. Property managers see what is due at their blocks this month and what is overdue, and they spend their time on the exceptions. When evidence is asked for, it is already filed.

Your operations lead gets a portfolio view: which blocks are fully current, which have overdue checks and which have open actions from reports.

Is this your situation?

  • Building checks are tracked in a spreadsheet that is often out of date.
  • Certificates sit in whichever inbox the contractor sent them to.
  • Producing evidence for a director or insurer takes days.
  • Actions from assessment reports are not always followed up.
  • Knowing what each block needs depends on one property manager.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does the system decide which checks a building needs?

No. Your assessors, insurers and advisers do. We set up the schedule you give us and make sure it is followed and evidenced.

Does this make us compliant?

It cannot promise that. It gives you an accurate record of what has been done and what is outstanding, which is what your own compliance process needs.

What if contractors will not upload documents?

Many prefer to email. A dedicated address accepts attachments and files them the same way, so contractors do not need to change their habits.

What drives the cost?

The number of blocks and check types, how many contractors are involved and whether you want actions from reports extracted into jobs.

Keep reading

More on Problems We Solve

Start here

Tell us where your block management admin gets stuck

Describe the task, how many blocks it touches and which system you run them on. We will tell you what we would automate, what should stay with your property managers, and if a smaller change to your current setup would fix it, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →