How Do We Get Homeowner Clients to Choose Their Tiles, Taps and Finishes in Time for the Builder?

Architects chase homeowners for tile, tap and finish choices while the builder waits. We build a selections schedule with deadlines tied to the programme.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Finishes decisions run late because homeowners choose tiles, taps, sanitaryware, flooring and ironmongery in their own time while the builder needs them by particular dates, and choices are communicated in emails and photos from showrooms. We build a selections schedule where each item has a decision deadline tied to the build programme, the client picks from options or adds their own with product details, and confirmed choices go straight to the contractor and specification.

'We are still deciding on the bathroom tiles'

The build is going well. The plasterer finishes next week, and the tiler is booked for the week after. The contractor asks the architect for the bathroom tile selection. The architect emails the clients. The clients reply that they have narrowed it down to three and will visit the showroom at the weekend. Then they send a photo of a tile, with no product name, in a showroom that stocks several similar ones.

Meanwhile the kitchen worktop, the sanitaryware and the internal door ironmongery are also undecided. The contractor warns that lead times on the chosen taps could hold up second fix.

Why selections come late

For homeowners, choosing finishes is exciting and personal, and they do not see the build programme. They do not know that the shower tray needs to be on site before the tiler starts, or that some items have long lead times. Choices come in a mixture of emails, photos, links and conversations, and details such as product codes, sizes and finishes are missing.

  • Clients do not see when each decision is needed.
  • Long lead time items are not flagged early.
  • Selections arrive as photos and links without full product details.
  • Changes of mind are not recorded clearly.
  • The contractor is waiting on the architect, who is waiting on the client.

What late selections cost

Programme delays when trades are waiting for products. Awkward conversations about who pays for the delay, which depend on the contract. Wrong products ordered from incomplete information. And a lot of the architect's time spent as go-between, often outside the fee for the stage.

A selections schedule tied to the build

  1. A selections schedule is created for the project, listing every item the client needs to choose, room by room, such as tiles, sanitaryware, taps, worktops, flooring, ironmongery and light fittings.
  2. Each item gets a decision deadline worked back from the contractor's programme and typical lead times, which the contractor confirms.
  3. The client sees the schedule online with deadlines, and can pick from options the architect has suggested or add their own choice with product name, code, supplier, size and finish.
  4. Missing details are prompted, such as a finish for a tap or a size for a tile.
  5. The architect reviews each choice for fit with the design and specification and approves it.
  6. Approved selections go to the contractor as a schedule, and changes of mind are recorded with dates.
  7. Reminders go to the client as deadlines approach, and the architect sees which selections are late.

The schedule the client sees

RoomItemDecide byStatus
BathroomWall tilesBefore tiler startsThree options shortlisted
BathroomShower trayEarlier, for first fixChosen, approved
KitchenWorktopBefore templatingNot started
ThroughoutDoor ironmongeryBefore second fixChosen, awaiting approval

Illustrative only. Real deadlines come from your contractor's programme.

A build that is not waiting on the tiles

Clients know when each decision is needed and why, which takes the pressure off them as well as the builder. Choices arrive with the details the contractor needs. The architect spends less time chasing and relaying. And the project has a clear record of what was chosen and when.

Is this happening on your projects?

  • Clients are still choosing finishes when trades are due.
  • Selections arrive as showroom photos without product details.
  • Long lead items have caused delays.
  • You relay choices between the client and the contractor by email.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can clients add products we did not suggest?

Yes. They add the details, and the architect reviews each choice before it goes to the contractor.

Does the contractor see everything?

They see approved selections and deadlines. Discussions between you and the client stay private if you prefer.

Does it work for commercial fit-outs?

It can, although it is designed around homeowner clients who make many personal choices.

What affects the cost?

The number of projects, whether you want a supplier product library and how it links to your specification and the contractor's programme.

Keep reading

More on Problems We Solve

Start here

Tell us where your practice's admin eats design time

Describe the problem, the tools your practice uses and who deals with it today. We will tell you what we would build, and if a smaller change to your current setup would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →