Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Build an Accurate Asset Register When We Take Over an Air Conditioning Contract?
Problems We Solve

How Do We Build an Accurate Asset Register When We Take Over an Air Conditioning Contract?

New AC maintenance contracts start with an asset list that is wrong or missing. We build a site survey app that tags each unit and builds the register.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Contract takeovers start badly because the previous contractor's asset list is incomplete, out of date or in a format nobody can use. We build a takeover survey app that walks engineers through each site, tags every unit with a QR label, records make, model, serial, refrigerant and location, and produces the asset register your planning, pricing and F-gas records depend on.

A list of 'various split units'

You have won a maintenance contract for a group of buildings. The client hands over the previous contractor's asset list: a spreadsheet with some model numbers, some serials, some rows that say 'various split units, 3rd floor'. The plant on the roof does not match the list. Some units have been replaced, some added by tenants, one condenser serves an indoor unit that was removed years ago.

You priced the contract from that list, and your PPM plan starts next month.

Why inherited lists are wrong

Asset lists decay. Units get replaced on breakdown and nobody updates the list. Tenants install their own systems. The previous contractor may have kept records well, badly, or in a system you cannot access. Handover is often a spreadsheet exported at the last minute.

  • Units have no labels, so engineers cannot match them to rows.
  • Serials and refrigerant details are missing for many units.
  • Indoor and outdoor units are not linked to each other.
  • Locations are described vaguely, such as 'roof'.
  • Records of previous F-gas checks are not handed over or cannot be matched.

What a bad starting list costs

PPM visits that take longer than priced because there is more kit than expected. Engineers wandering a building to find units. F-gas check intervals set on guesswork. Disputes with the client about what is in scope. And every future report inheriting the confusion.

The first few months of a contract set the tone. Starting with a proper register is the easiest way to look competent to a new client.

The takeover survey we build

  1. We load whatever list you inherited as a starting point, one row per claimed asset.
  2. Engineers walk each site with the survey app, floor by floor and roof by roof. For each unit they find, they fix a durable QR label, match it to a row or create a new one.
  3. The app asks for make, model, serial (by photo, read automatically where legible), refrigerant type, charge from the rating plate, location with a floor plan pin where available, and which outdoor unit serves which indoor units.
  4. Rows from the old list that nobody finds are flagged for a person to confirm as removed.
  5. Differences between the inherited list and what was found are summarised for a scope conversation with the client.
  6. The finished register feeds your PPM planner, F-gas records and reporting, and future engineers scan the QR label to see each unit's history.
Asset detailInherited listAfter the takeover survey
IdentificationRow with no labelQR label on the unit
Serial and modelOften missingFrom rating plate photo
Refrigerant and chargeMissing or guessedRecorded from the plate
Indoor to outdoor linksNot recordedLinked in the register
Scope differencesFound graduallySummarised for the client

Scope changes are a commercial conversation between you and the client. The survey gives you evidence for it.

A contract that starts on firm ground

PPM visits are planned from a register that matches the building. Engineers scan a label and see the unit's details and history. The client sees a clear picture of what they own, often for the first time, and scope differences are agreed early with evidence rather than argued later.

Pricing the next contract also improves. Once you have surveyed a few takeovers properly, you know how far inherited lists usually differ from reality, and you can allow for it in tenders rather than discovering it after award.

When you next bid for a similar contract, the takeover survey approach is something to describe in the tender.

Does this sound like your last takeover?

  • The inherited asset list did not match the plant on site.
  • Units have no labels linking them to your records.
  • Serials and refrigerant details are missing for many assets.
  • Scope disagreements came up months into the contract.
  • Engineers spend time finding units on unfamiliar sites.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do we have to label every unit?

Labels make every future visit easier, but they are optional. The register works without them, with less certainty on busy sites.

Can the app read serial numbers from photos?

Often, when the rating plate is legible. Engineers confirm the value, and unreadable plates are typed in.

Where does the register live afterwards?

In your job management system if it holds assets well, or in a register we build that connects to it.

What affects the cost?

The number of sites you take over each year, whether floor plans are needed, and which systems the register must feed.

Keep reading

More on Problems We Solve

Start here

Tell us where your air conditioning admin slips

Describe the systems you look after, how service and breakdown work reaches your engineers, and where your F-gas and service records live today. We will tell you what we would build and what we would leave alone, and if your job management software already does it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →