Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do I Plan Which Operator Takes Which Machine to Which Farm When Silage and Harvest Overlap?
Problems We Solve

How Do I Plan Which Operator Takes Which Machine to Which Farm When Silage and Harvest Overlap?

Agricultural contractors juggle operators, tractors and implements across farms at peak season. We build an allocation board that shows clashes early.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

At silage and harvest, an agricultural contractor has to match operators, tractors, implements and trailers to jobs on several farms at once, and the plan lives on a whiteboard and in the boss's head. We build an allocation board that shows each operator, machine and implement by day, flags clashes and gaps, and puts each operator's plan on their phone.

First cut, three farms and one forager

It is first cut. Three dairy farms want to go this week, and the grass is ready on all of them. You have one self-propelled forager, two mowers, a rake, four tractors that can pull trailers, two buckrakes on the clamp, and seven operators, one of whom is a student on his first season and two of whom are also needed for spraying.

The plan is on a whiteboard in the yard office and in your head. Mowing goes first at farm one, then the forager follows, and the trailer drivers have to be at the right farm at the right time. Then a mower breaks down. Then farm two's grass is ready sooner than expected. Then an operator's child is ill. By mid-morning you have rearranged the whole day by phone three times, and one trailer driver is at the wrong farm.

Why peak season allocation goes wrong

The difficulty is not any single decision. It is that every decision depends on several others, and they change hour by hour.

What has to line upWhy it is hard
OperatorsDifferent skills and tickets, different hours available, some shared with other jobs
TractorsMatched to implements by size, hitch and hydraulics
ImplementsOne mower, one rake, one baler: whoever has it, nobody else does
Trailers and chaser kitNeeded in numbers that depend on distance to the clamp
The customer's own kit and peopleSome farms supply trailers or a clamp driver

A whiteboard can show who is where today. It cannot show that moving an operator to farm two leaves the drill without a driver tomorrow, or that the only tractor big enough for the mower is booked on a baling job. Those links live in your head, and your head is also answering the phone.

What a muddled plan costs

The cost shows up as kit and people standing idle. A forager with not enough trailers waits. Trailer drivers with no forager wait. An operator drives across the county and back because nobody told him the job moved. At peak season every idle hour is an hour of work you are not doing for someone else.

It also costs customers' patience and your own time. A dairy farmer whose silage team turns up short-handed notices. And the person doing the planning spends peak season on the phone instead of running the business, with the risk of mistakes that comes with that.

An allocation board for operators and machinery

What we build is an allocation board that knows your operators, your machines and implements, and which of them go together.

  1. Each operator has a record of what they can drive and which jobs they are trained or ticketed for, entered by you, and their availability.
  2. Each tractor, implement and trailer is listed, with which tractors can run which implements.
  3. Jobs come from your booking board. For each job day, you assign a team: operators, tractors, implements and trailers.
  4. Clashes show immediately: the same machine on two jobs, an operator on two farms, an implement with no suitable tractor, an operator given a job they are not marked as trained for.
  5. When something changes, a breakdown, an ill operator, a farm moved forward, you move people and kit on the board and see the knock-on effects before you ring anyone.
  6. Each operator sees their day on their phone: farm, fields, machine, meeting point, and who else is on the job. Changes reach them with a notification.

It works alongside the whiteboard if you want to keep one. Many contractors put the board on a screen in the yard office instead.

A breakdown handled at the desk, not by six phone calls

At eight the second mower breaks down at farm one. You open the board, see that the only other mower is on farm three this afternoon, and that the tractor on it could come back by two. You move farm one's second half to the afternoon and pull one trailer driver onto the rake at farm two in the meantime. The board shows no clashes. The operators affected get the change on their phones, and you make one call to farm one to explain.

At the end of the day the board records who was where on what, which feeds hours and job costing.

Is your peak season plan on a whiteboard?

  • Operators and machinery are planned in your head and on a whiteboard.
  • Breakdowns mean an hour of phone calls to reshuffle everything.
  • Kit and people are sometimes waiting because the team is not balanced.
  • Operators turn up at the wrong farm after a change.
  • You are not sure who is trained or ticketed for which job without asking.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it plan the teams automatically?

It can suggest a team based on who and what is free, but the decision stays with you. Contractors know things about their operators and customers that no rule can capture.

Can operators see the whole plan?

You choose. Most contractors show operators their own day and who else is on the same job.

Does it track machinery by GPS?

It can show locations if your tractors have telematics with an interface we can use. It is not required for allocation.

We only have a few operators. Is this worth it?

If one person can plan it in their head without mistakes, maybe not. We would look at your peak weeks first and be honest about it.

Keep reading

More on Problems We Solve

Start here

Tell us how your contracting business runs in peak season

Describe your operators, your kit, how jobs are planned and how the information gets back to the office. We will tell you plainly what is worth building for a contractor your size, and if better use of what you already have would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →