  3. How Do I Organise Hedge Cutting for Dozens of Customers Without Losing Track of Which Hedges Are Done?
Problems We Solve

How Do I Organise Hedge Cutting for Dozens of Customers Without Losing Track of Which Hedges Are Done?

Hedge cutting contractors juggle dozens of customers' hedges over winter from memory. We build a hedge list by customer and boundary with progress and billing.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Hedge cutting runs across many customers over autumn and winter, each with their own list of hedges, sides, timing preferences and notes, and progress is tracked from memory and phone calls. We build a hedge list per customer on a map, with which boundaries and sides to cut, customer notes and timing, progress recorded by the operator, and billing by hour or metre from the same record.

'Just do the usual, and leave the one by the pond'

Once the harvest is in, the hedge cutter comes out. Your operator works through a list of customers over the following months: arable farms, livestock farms, estates, the parish council's lanes, a few smallholders. Each customer wants something different. One wants all roadside hedges done early, before the leaves fall. Another wants some hedges left uncut this year and others cut on both sides. A third says 'just do the usual, and leave the one by the pond'.

Where these instructions live is in the operator's head, a notebook and a few text messages. When the operator is off, or a second operator takes a hedge cutter out, nobody knows 'the usual'. And when a customer asks in January whether the hedge by the church has been done, the answer is 'I think so'.

Why hedge cutting is hard to keep track of

Hedge work is spread thinly over many farms and many weeks, and it depends on detail that is hard to write down.

What mattersWhy it is hard to record
Which hedges on each farmHedges are known by landmarks, not names
Which side, top, or bothDepends on who owns the other side and access
Hedges to leave this yearChanges each year, sometimes for scheme reasons
Timing preferencesEarly for roads, later for others, weather permitting
ProgressDone over several visits, part of a hedge at a time

Some customers have hedges in environmental schemes with conditions on when and how often they can be cut. Those conditions are the customer's responsibility and their adviser's, and we do not interpret them, but the customer needs to be able to tell you, and you need to be able to record it, so the operator knows.

What losing track costs

The worst outcome is cutting a hedge that should have been left, because the customer said so or because they have an agreement condition they told you about. That is a difficult conversation, and not one you can undo.

More commonly, hedges get missed, customers ring to ask about progress, and billing becomes guesswork. Hedging is usually charged per hour, sometimes per metre, and an operator's day across three farms, part-done on one of them, is hard to split accurately.

A hedge list for every customer, on a map

What we build is a map-based hedge list for each customer, that the operator works from and records against.

  1. Each customer's hedges are drawn on the shared field map as lines along boundaries, with a name or landmark the operator will recognise.
  2. Each hedge has this year's instruction: cut or leave, which side, top, timing, and any notes from the customer, with the date the instruction was given.
  3. Customers can send instructions by marking a map on their phone or by phone call, which the office records against the hedges.
  4. The operator's phone shows today's customer with the hedges to cut in one colour and hedges to leave in another. As each is done, the operator marks it done or part done, with the length completed.
  5. Hours are recorded per customer as the operator moves from farm to farm, so billing by the hour is accurate. Where you charge by length, the length done is taken from the map.
  6. The office and the customer can see progress on the map, and completed work goes to the invoice.

The same list carries forward to next year, so 'the usual' is written down and just needs confirming.

Parish and highway verge work, where you do it, fits the same pattern: a route of lanes rather than fields, each length with its own instruction, and progress that the clerk can see without ringing you.

A winter of hedging on the map

In September you send each regular customer a map of last year's hedges and ask them to confirm or change. Most confirm. Two mark hedges to leave. The operator works through the list from October, marking each hedge done. In December, a customer asks whether the church hedge is done; you look at the map and tell him it was done on the fifth, both sides.

When a second operator helps out in January, he sees exactly which hedges to cut and which to leave on each farm, without a phone call.

Is your hedging run from memory?

  • Customers' hedge instructions are in the operator's head or a notebook.
  • Nobody else knows 'the usual' for each customer.
  • Customers ring to ask what has been done.
  • Billing hedging across several farms in a day is guesswork.
  • You have cut, or nearly cut, a hedge that should have been left.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will it tell us which hedges can be cut under a scheme?

No. Customers tell you their requirements, with their adviser. The list records their instructions so the operator follows them.

Can customers mark hedges themselves?

Yes. A customer can mark hedges on a map on their phone, which you then confirm.

Does it work in areas with poor signal?

Yes. The day's list is stored on the phone and progress syncs when signal returns.

Can we charge by the metre?

Yes. Lengths come from the map, so metre charging is consistent.

Keep reading

More on Problems We Solve

Start here

Tell us how this works in your contracting business now

Describe how the work comes in, who records what, and which tools you already use. We will tell you what is worth building for a contractor your size, and if a better routine or the software you already have would do it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →